F00 标准化、质量管理 标准查询与下载



共找到 343 条与 标准化、质量管理 相关的标准,共 23

(a) Whenever a document submitted to the DOE contains information which may be exempt from public disclosure, it will be handled in accordance with the procedures in this section. While the DOE is responsible for making the final determination with regard to the disclosure or nondisclosure of information contained in requested documents, the DOE will consider the submitter’s views (as that term is defined in this section) in making its determination. Nothing in this section will preclude the submission of a submitter’s views at the time of the submission of the document to which the views relate, or at any other time.

Energy. Part1004:Freedom of information act (foia). Section1004.11:Handling information of a private business, foreign government, or an international organization.

ICS
CCS
F00
发布
2014-04-25
实施
2014-04-25

(a) All requests for classified records will be subject to the provisions of this part with the special qualifications noted below.

Energy. Part1004:Freedom of information act (foia). Section1004.6:Requests for classified records.

ICS
CCS
F00
发布
2014-04-25
实施
2014-04-25

(a) Appeal to Office of Hearings and Appeals. When the Authorizing or Denying Official or FOIA Officer Official has denied a request for records in whole or in part or has responded that there are no documents responsive to the request consistent with §1004.4(d), or when the Freedom of Information Officer has denied a request for expedited processing consistent with §1004.5(d) for waiver of fees consistent with §1004.9, the requester may, within 30 calendar days of its receipt, appeal the determination to the Office of Hearings and Appeals.

Energy. Part1004:Freedom of information act (foia). Section1004.8:Appeals of initial denials.

ICS
CCS
F00
发布
2014-04-25
实施
2014-04-25

(a) Form of grant. Records requested pursuant to §1004.4 will be made available promptly, when they are identified and determined to be nonexempt under this Regulation, the FOIA, and where the applicable fees are $15 or less or where it has been determined that the payment of applicable fees should be waived. Where the applicable fees exceed $15, the records may be made available before all charges are paid.

Energy. Part1004:Freedom of information act (foia). Section1004.7:Responses by authorizing officials: form and content.

ICS
CCS
F00
发布
2014-04-25
实施
2014-04-25

(a) Fees to be charged. The DOE will charge fees that recoup the full allowable direct costs incurred. The DOE will use the most efficient and least costly methods to comply with requests for documents made under the FOIA. The DOE may contract with private sector services to locate, reproduce and disseminate records in response to FOIA requests when that is the most efficient and least costly method. When doing so, however, the DOE will ensure that the ultimate cost to the requester is no greater than it would be if the DOE itself had performed these tasks. In no case will the DOE contract out responsibilities which the FOIA provides that only the agency may discharge, such as determining the applicability of an exemption, or determining whether to waive or reduce fees, which are determinations by Authorizing Officials or FOIA Officers. Where the DOE can identify documents that are responsive to a request and are maintained for public distribution by other agencies such as the National Technical Information Service and the Government Printing Office, the FOIA Officer will inform requesters of the procedures to obtain records from those sources.

Energy. Part1004:Freedom of information act (foia). Section1004.9:Fees for providing records.

ICS
CCS
F00
发布
2014-04-25
实施
2014-04-25

(a) FOIA Officers will be responsible for processing requests for records submitted pursuant to this part. Upon receiving such a request, the FOIA Officer will, except as provided in paragraph (c) of this section, ascertain which Authorizing Official has responsibility for, custody of, or concern with the records requested. The FOIA Officer will review the request, consulting with the Authorizing Official where appropriate, to determine its compliance with §1004.4. Where a request complies with §1004.4, the FOIA Officer will acknowledge receipt of the request to the requester and forward the request to the Authorizing Official for action.

Energy. Part1004:Freedom of information act (foia). Section1004.5:Processing requests for records.

ICS
CCS
F00
发布
2014-04-25
实施
2014-04-25

(a) Refrigerators and refrigerator-freezers. (1) Electric refrigerator means a cabinet designed for the refrigerated storage of food, designed to be capable of achieving storage temperatures above 32 °F (0 °C) and below 39 °F (3.9 °C), and having a source of refrigeration requiring single phase, alternating current electric energy input only. An electric refrigerator may include a compartment for the freezing and storage of food at temperatures below 32 °F (0 °C), but does not provide a separate low temperature compartment designed for the freezing and storage of food at temperatures below 8 °F (¥13.3 °C).

Commercial Practices. Part305:Energy and water use labeling for consumer products under the energy policy and conservation act ("energy labeling rule"). Section305.3:Description of covered products.

ICS
CCS
F00
发布
2014-04-09
实施
2014-04-09

(a)(1) Except as provided in paragraphs (a)(2) through (4) of this section, each manufacturer of a covered product subject to the disclosure requirements of this part and subject to Department of Energy certification requirements in 10 CFR part 429 shall submit annually a report for each model in current production containing the same information that must be submitted to the Department of Energy pursuant to 10 CFR part 429 for that product, and that the Department has identified as public information pursuant to 10 CFR part 429. In lieu of submitting the required information to the Commission as required by this section, manufacturers may submit such information to the Department of Energy via the CCMS at https://regulations.doe.gov/ccms as provided by 10 CFR 429.12.

Commercial Practices. Part305:Energy and water use labeling for consumer products under the energy policy and conservation act ("energy labeling rule"). Section305.8:Submission of data.

ICS
CCS
F00
发布
2014-04-09
实施
2014-04-09

As specified in paragraphs (a) and (b) of this section, each licensee shall provide advance notification to the NRC and the governor of a State, or the governor’s designee, of the shipment of licensed material in a category 1 quantity, through or across the boundary of the State, before the transport, or delivery to a carrier for transport of the licensed material outside the confines of the licensee’s facility or other place of use or storage.

Energy. Part37:Physical protection of category 1 and category 2 quantities of radioactive material. Subpart D:Physical Protection in Transit. Section37.77:Advance notification of shipment of category 1 quantities of radioactive material.

ICS
CCS
F00
发布
2014-03-28
实施
2014-03-28

(a) Any person who makes an expenditure prohibited herein shall be subject to a civil penalty of not less than $15,000 and not more than $160,000 for each such expenditure.

Energy. Part601:New restrictions on lobbying. SubpartD:Penalties and enforcement. Section601.400:Penalties.

ICS
CCS
F00
发布
2014-01-02
实施
2014-01-02

This subpart shall govern the submission, consideration, and inclusion of projects into the comprehensive plan.

Conservation of power and water resources. Part401:Rules of practice and procedure. Subpart A:Comprehensive plan. Section401.1:Scope.

ICS
CCS
F00
发布
2014
实施
2014

This subpart applies to applications for preliminary permit, license, or exemption from licensing.

Conservation of power and water resources. Part4:Licenses, permits, exemption ,and determination of project costs. Subpart D:Application for preliminary permit, license or exemption: general provisions. Section4.30:Applicability and definitions.

ICS
CCS
F00
发布
2014
实施
2014

For a preliminary permit or license, identify every person, citizen, association of citizens, domestic corporation, municipality, or state that has or intends to obtain and will maintain any proprietary right necessary to construct, operate, or maintain the project.

Conservation of power and water resources. Part4:Licenses, permits, exemption ,and determination of project costs. Subpart D:Application for preliminary permit, license or exemption: general provisions. Section4.32:Acceptance for filing or rejection; info

ICS
CCS
F00
发布
2014
实施
2014

本标准规定了用于制备生物柴油的木本油脂原料的要求、检验方法、检验规则和标志、包装、贮存、运输。本标准适用于以酯交换法制备生物柴油的木本油脂原料,包括棕榈油、黄连木油、文冠果油、光皮树油、山茶油、乌柏油、麻疯树油、橡胶籽油等所有用于生产生物柴油的木本油脂。

Woody oil for biodiesel production

ICS
75.160.01
CCS
F00
发布
2013-10-17
实施
2014-01-01

本标准适用于地源热泵系统、污水源热泵系统和民用建筑太阳能热水系统。

Renewable energy building application engineering testing and evaluation standards

ICS
27.160;27.080
CCS
F00
发布
2013-09-22
实施
2013-10-30

(a) Telephone reports. (1) Each licensee shall report by telephone as follows:

Energy. Part20:Standards for protection against radiation. Subpart M:Reports. Section20.2201:Reports of theft or loss of licensed material.

ICS
CCS
F00
发布
2013-05-19
实施
2013-05-19

ccc cece eeenenee nen e nen n ene e nen ener nese snes esas 1

Guidelines for developing quality assurance programs for physical and chemical analysis laboratories in the nuclear industry

ICS
CCS
F00
发布
2013-05-01
实施
2013-05-01

Guarantees of Origin related to energy - Guarantees of Origin for Electricity; German version EN 16325:2013

ICS
27.010
CCS
F00
发布
2013-05
实施

Guarantees of Origin related to energy - Guarantees of Origin for Electricity

ICS
27.010
CCS
F00
发布
2013-04-27
实施
2013-04-27

Smart Grid Interoperable & Conformant (SG-IC) Testing and Certification Scheme Operator Guidelines

ICS
27.010;29.240.01
CCS
F00
发布
2013-01-01
实施



Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号