BULL 91-2007

Planning and Conducting Surface Preparation and Coating Operations for Oil and Natural Gas Drilling and Production Facilities in a Marine Environment (FIRST EDITION)


 

 

非常抱歉,我们暂时无法提供预览,您可以试试: 免费下载 BULL 91-2007 前三页,或者稍后再访问。

如果您需要购买此标准的全文,请联系:

点击下载后,生成下载文件时间比较长,请耐心等待......

 

标准号
BULL 91-2007
发布日期
2007年06月01日
实施日期
2007年06月13日
废止日期
中国标准分类号
/
国际标准分类号
/
发布单位
API - American Petroleum Institute
引用标准
28
适用范围
Worldwide@ marine exploration@ production@ development and decommissioning operations are conducted from a variety of structures (installations@ as defined herein). These installations must be inspected periodically and maintained in order to assure structural integrity and minimize pollution risks. Maintenance of an offshore structure@ regardless of its classification@ necessarily includes blasting and coating activities. The purpose of this publication is to establish practices and procedures that should be followed to minimize the discharge of spent blast abrasive@ and paint overspray to the surrounding waters during these activities@ to meet the spirit of MARPOL Annex V. Additionally@ any maintenance waste which is captured must be properly packaged and shipped to shore for disposal. This publication also addresses procedures to contain and capture maintenance waste@ including@ but not limited to@ spent blast abrasive and associated materials@ during such maintenance activities on marine structures. The safety of personnel is the most important consideration for all work activities. Consequently@ any blasting and coating work conducted shall consider the safety of personnel as paramount. Other types of discharges that may be permitted by various regulatory authorities@ are outside the scope of this document. These would include (1) discharges in compliance with a relevant governmental permit (e.g.@ the applicable provisions of the U.S. Clean Water Act or the applicable sections of European Community [EC] Dangerous Substances Directives)@ (2) discharges resulting from circumstances identified and reviewed and made part of the public record with respect to a permit issued or modified and subject to a condition in such permit@ and (3) continuous or anticipated intermittent discharges from a point source@ identified in a permit or permit application which are caused by events occurring within the scope of relevant operating or treatment systems




Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号