73.020 采矿和挖掘 标准查询与下载



共找到 768 条与 采矿和挖掘 相关的标准,共 52

Technical specification for exploration and treatment of underground fault water conductivity in coal mines

ICS
73.020
CCS
发布
2021-11-16
实施
2022-02-16

Natural stone test methods - Determination of resistance of marble to thermal and moisture cycles

ICS
73.020
CCS
发布
2021-11-01
实施
2021-11-01

Traceability of rare earths in the supply chain from mine to separated products

ICS
73.020
CCS
发布
2021-10-29
实施
2021-10-29

本文件适用于井工类煤矿企业中所有从事电工电气作业的人员,包括采煤(普采、综采)、掘进(普掘、综掘)、供电、通风、排水、压风设备等电气作业人员的培训活动、培训教材、试题库等资源的建设;适用于各类煤矿安全资格培训、职业技能鉴定和技能人员的培训学习与考核标准的编制;适用于煤炭类大中专院校、各类职业学校教材的编写。

Electrician(coal miner)operator--Training specification

ICS
73.020
CCS
B069
发布
2021-10-28
实施
2022-07-01

Mine closure and reclamation planning. Requirements

ICS
73.020
CCS
发布
2021-10-21
实施
2021-10-21

Mine closure and reclamation planning. Guidance

ICS
73.020
CCS
发布
2021-10-21
实施
2021-10-21

This document specifies a framework and the processes involved in mine closure and reclamation planning for new and operating mines. Requirements and recommendations are provided on: — mine closure and reclamation plan objectives and commitments; — technical procedures and techniques; — mitigation of socio-economic impacts; — financial assurance and associated planning; — mine closure and reclamation planning for unplanned closure; — post-closure management plan; and — mine closure and reclamation plan documentation. The following aspects of mine closure and reclamation are not addressed in this document: — infrastructure such as rail lines, ports, off-site ore loaders, power stations, etc. that are associated with the mine operation, but which are not located at the mine site; — detailed survey, testing or monitoring methods, detailed engineering procedures, detailed product requirements, or detailed construction and operational procedures; occupational health and safety management related to closure and reclamation, construction and exploration activities; — relinquishment of a closed and reclaimed mine site, or portions thereof, to a party (governmental or private entity) not related to the mine operator; — specific requirements for dealing with the radiological aspects of mine closure and reclamation, such as those that occur at uranium mining and processing facilities and other mines at which naturally occurring radioactive materials are present; however, the other aspects associated with closure and reclamation of these mines are included in this document; and — closure and reclamation of abandoned mines.

Mine closure and reclamation planning — Part 1: Requirements

ICS
73.020
CCS
发布
2021-10-06
实施

This document specifies requirements for, and gives guidance on, the design and use of a traceability system in a rare earth supply chain. It specifies the information to be recorded by supply chain businesses for rare earth materials or products passing through the supply chain from mine to separated products.

Traceability of rare earths in the supply chain from mine to separated products

ICS
73.020
CCS
发布
2021-10-00
实施

This document provides guidance related to the necessary mine closure and reclamation planning activities for new and operating mines. Recommendations are provided on: — closure and reclamation of a mine site; — land reclamation and water management; — stakeholder engagement; — decision and analysis tools. The following aspects of closure and reclamation are not addressed in this document: — infrastructure such as rail lines, ports, off-site ore loaders, power stations, etc. that are associated with the mine operation, but which are not located at the mine site; — detailed survey, testing or monitoring methods, detailed engineering procedures, detailed product requirements, or detailed construction and operational procedures; occupational health and safety management related to closure and reclamation, construction and exploration activities; — relinquishment of a closed and reclaimed mine site, or portions thereof, to a party (governmental or private entity) not related to the mine operator; — specific requirements for dealing with the radiological aspects of mine closure and reclamation, such as those that occur at uranium mining and processing facilities and other mines at which naturally occurring radioactive materials are present; however, the other aspects associated with closure and reclamation of these mines are included in this document; and — closure and reclamation of abandoned mines.

Mine closure and reclamation planning - Part 2: Guidance

ICS
73.020
CCS
发布
2021-10-00
实施

Natural stone test methods - Determination of resistance of marble to thermal and moisture cycles

ICS
73.020
CCS
发布
2021-10-00
实施

Regulations for the preparation of geothermal resources exploration and development and utilization planning

ICS
73.020
CCS
D 10
发布
2021-08-16
实施
2021-09-16

Natural stone test methods -- Determination of sensitivity to accidental staining

ICS
73.020
CCS
发布
2021-08-12
实施
2021-08-12

Technical requirements for geological exploration of turquoise minerals

ICS
73.020
CCS
D13
发布
2021-08-06
实施
2021-10-06

Natural stone test methods - Determination of sensitivity to accidental staining

ICS
73.020
CCS
发布
2021-07-01
实施
2021-07-01

This European Standard specifies requirements for rough slabs of natural stone from which products for use in buildings or commemorative stones and other similar applications are made. It does not cover artificially agglomerated stony material nor installation.

Natural stone - Rough slabs - Requirements

ICS
73.020
CCS
发布
2021-07-01
实施

本文件规定了煤矿矸石基膏体充填材料的术语和定义、技术要求、试验内容与方法。

Technical specifications for gangue-based paste filling materials in coal mines

ICS
73.020
CCS
B069
发布
2021-06-16
实施
2021-10-01

本文件规定了煤矿膏体充填采空区隔离技术要求的术语和定义、隔离设备、隔离材料、隔离工艺要求、安全技术要求等。

Coal mine paste filling goaf isolation technical requirements

ICS
73.020
CCS
B069
发布
2021-06-16
实施
2021-06-25

本文件规定了煤矿膏体充填用管阀的术语和定义、结构型式及规格、技术要求、检测方法、检验和判定规则、产品的标志、防护、包装、贮存及维护保养。

Pipe valve for paste filling in coal mine

ICS
73.020
CCS
B069
发布
2021-06-16
实施
2021-10-01

本文件规定了煤矿膏体充填用骨料的术语和定义、分类、技术要求、试验方法、检验规则、验收、储存和运输等。

Aggregate for coal mine paste filling

ICS
73.020
CCS
B069
发布
2021-06-16
实施
2021-10-01

Underground Mining Metal Ore Green Mine Construction Requirements

ICS
73.020
CCS
D 10
发布
2021-06-08
实施
2021-07-08



Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号