S02 经济管理 标准查询与下载



共找到 13 条与 经济管理 相关的标准,共 1

Labor quota for rail transit engineering component manufacturing

ICS
CCS
S02
发布
2008-07-01
实施
2008-07-01

本标准规定了轨道交通工程大型设备制造工时定额、配备相应的符合专业技术等级的人员和工作内容。 本标准适用于轨道交通工程大型设备制造工作中的劳动管理。

Ration of workers for manufacturing large rail traffic engineering equipments

ICS
03.100.30
CCS
S02
发布
2008-05-05
实施
2008-07-01

本标准规定了城市轨道交通轻轨工程的劳动定员、定额、技能等级、人员配置和工作内容。 本标准适用于城市轨道交通轻轨工程的劳动管理。

Labor force quota for lightrail engineering in city transit system

ICS
45.020
CCS
S02
发布
2004-12-28
实施
2005-07-01

本标准规定了城市轨道交通通信信号工程的劳动定员、定额、技能等级、人员配置和工作内容。 本标准适用于城市轨道交通通信信号工程的劳动管理。

Labor force quota for signaling engineering in city transit system

ICS
45.020
CCS
S02
发布
2004-12-28
实施
2005-07-01

本标准规定了城市轨道交通地下铁道工程的劳动定员、定额、技能等级、人员配置和工作内容。 本标准适用于城市轨道交通地下铁道工程的劳动管理。

Labor force quota for subway engineering in city transit system

ICS
45.020
CCS
S02
发布
2004-12-28
实施
2005-07-01

本标准规定了城市轨道交通电力牵引供电工程的劳动定员、定额、技能等级、人员配置和工作内容。 本标准适用于城市轨道交通电力牵引供电工程的劳动管理。

Labor force quota for locomotive power supply engineering in city transit system

ICS
45.020
CCS
S02
发布
2004-12-28
实施
2005-07-01

This Leaflet defines the provisions relating to the quality and the manufacture of the steel used, as well as the acceptance conditions in respect of flat-bottomed rails weighing more than 35 kg per metre made of continuously cast non heat-treated steel. Th(, chief modifications relating to technological aspects are as follows Deletion of the ingot casting process, Checking of the body of the rail, - Modification of the acceptance gauge approval procedure, Revision of point 1.4 on the execution quality, Deletion of the specific tests or requirements in respect of the ingot casting process. When the invitation to tender is made this Leaflet shall be accompanied by the documents necessary for the execution of the order, particularly those relating to the application of the following clauses of this specification: 1.1 Manufacturing procedure 1.2 Gauges 1.3 Marking 1.4 Quality of execution 1.5 Finishing 1.6 Tolerances, 1.6.6 Weight 2.3 Nature of tests 2.5.1 Chemical analysis - Nature of tests 2.7 Tensile test 3.1 Guarantee

Technical specification for the supply of rails

ICS
CCS
S02
发布
2008-01
实施

UIC Leaflet 311 defines the general procedures governing financial relations between UIC Members. Other railways may use the leaflet on the basis of a corresponding agreement. The obligatory/recommendatory provisions aim to harmonise procedures for accountancy and the payment of mutual services, and are compliant with the Uniform Regulations governing International Carriage by Rail (COTIF 1999), the European Directives to be applied, and other regulations of UIC and the Brussels Clearing House (BCC). The present leaflet obliges users to register credits and debts resulting from traffic services brought to account in accordance with UIC Leaflets 301 and 304 in a current account and clear balances monthly. In as far as the accounting regulations provide for income being collected on foreign routes, companies are obliged to observe a fixed value date, which is used to calculate accounting charges. For the exchange of other services (non-traffic services), the payment conditions agreed in service contracts will generally apply. Use of the current account system is also recommended in these cases, If such agreements do not exist or are not clearly expressed, recourse can be made to the regulations laid out in UIC Leaflet 311. Financial relations in the sense used in this leaflet are subject to risks resulting from fluctuations in currency exchange rates and from accounting and payment procedures. As in the regulations governing charges, users are offered a uniform reference interest rate (EURIBOR one-month rate), in order to limit the losses to both parties resulting from accounting delays. The risk of lost income through failure to pay (long-term debt) has increased for creditors in that the new COTIF no longer provides for referral to OCTI or the breaking of the transport chain through restrictions on prepayment facilities. In addition to the requirements for guarantees, the UIC protective measures constitute the only safe means of reducing risk. The appendices serve to implement the principles laid down in the texts.

Financial relations between railway undertakings - Principles and terms of application

ICS
CCS
S02
发布
2007-01-01
实施

Basic vocabulary of technical management of railway materials

ICS
CCS
S02
发布
1997-03-01
实施
1997-09-01

Technical and economic indicators of railway material management

ICS
CCS
S02
发布
1997-03-01
实施
1997-09-01

Delimitation of goods to be supplied by suppliers of the mechanical part, the electrical part and, where appropriate the air-conditioning equipment for rail vehicles

ICS
45.060.01
CCS
S02
发布
1991-05
实施

Requirements for the format and content of documents, forms, and account cards for the material department of the railway operation system

ICS
CCS
S02
发布
1991-01-05
实施
1991-07-01

Railway rolling stock. Delimitation of technical allowances between the constructors and their suppliers for the execution of an order.

ICS
03.220.30;45.040
CCS
S02
发布
1990-10-01
实施
1990-10-05



Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号