F00 标准化、质量管理 标准查询与下载



共找到 343 条与 标准化、质量管理 相关的标准,共 23

本标准规定了综合能耗的定义和计算方法。 本标准适用于任一基层耗能核算单位(主要是企业),也适用于能源统计部门。

General principles for calculation of total production energy consumption

ICS
27.010
CCS
F00
发布
1990-07-24
实施
1991-07-01

本文件规定了核电厂用埋地玻璃纤维增强塑料外包覆钢筋混凝土管道技术规程的术语和定义、材料、设计、制造、技术要求及试验方法、工程验收文件等基本技术要求。 本文件适用输送介质温度为-5℃~60℃海水或淡水的玻璃纤维增强塑料外包覆钢筋混凝土埋地管道、管件。 其它行业用埋地玻璃纤维增强塑料外包覆钢筋混凝土管道 可参照本文件执行。

Technical regulations for reinforced concrete pipes covered with glass fiber reinforced plastics for nuclear power plants

ICS
27.120.99
CCS
F00
发布
2023-10-11
实施
2024-04-11

本标准适用于电力工程项目编号、电力勘测设计咨询各个阶段形成的产品文件以及电力工程标准设计文件的管理,方便信息处理与交换。

Power engineering project number and product document management regulations

ICS
27.100
CCS
F00
发布
2023-10-11
实施
2024-04-11

Energy Conservation Management Regulations for Public Institutions

ICS
27.010
CCS
F00
发布
2022-11-28
实施
2022-12-20

Specifications for Carbon Efficiency Evaluation of Industrial Enterprises

ICS
01.040.03
CCS
F00
发布
2021-11-15
实施
2021-11-16

Guide for Building and Classing Liquefied Gas Carriers with Independent Tanks

ICS
47.020
CCS
F00
发布
2021-08-01
实施

Biomass pyrolysis gas quality evaluation

ICS
27.010
CCS
F00
发布
2021-05-07
实施
2021-11-01

Standardized Assessment and Grading Specifications for Safety Production of Nuclear Engineering Construction Enterprises

ICS
ICS27.010
CCS
F00
发布
2018-12-28
实施
2019-03-01

Energy management systems. Requirements with guidance for use

ICS
03.100.70;03.100.99;13.020.10;27.015
CCS
F00
发布
2018-08-22
实施
2018-08-22

Guidelines for on-site evaluation of energy measuring instruments for energy-consuming units

ICS
17.020
CCS
F00
发布
2017-06-28
实施
2017-10-01

本标准规定了在用工业锅炉使用单位管理机构及人员配置,运行安全、节能和环保管理要求,锅炉安装、改造与修理,定期检验,事故报告和调查处理,应急预案和演练,使用登记和变更,锅炉安全、节能、环保管理评价等基本要求。 本标准适用于上海市范围内在用工业锅炉的使用单位(以下简称使用单位)对在用工业锅炉的管理,也可用于特种设备安全、节能和环境保护监督管理部门对使用单位的安全监察、节能检查及环保监察。

Basic requirements for safety, energy saving and environmental protection management of in-use industrial boilers

ICS
27.010
CCS
F00
发布
2017-06-23
实施
2017-10-01

Guarantees of Origin related to energy - Guarantees of Origin for Electricity; German version EN 16325:2013+A1:2015

ICS
27.010
CCS
F00
发布
2016-01
实施

Guidelines for the construction of energy management and control centers for non-industrial energy-consuming units

ICS
35.240.99
CCS
F00
发布
2015-12-30
实施
2016-04-01

Guidelines for the Construction of Energy Management and Control Centers of Industrial Energy Consumption Units

ICS
35.240.50
CCS
F00
发布
2015-12-30
实施
2016-04-01

Technical Specifications for Energy Conservation Monitoring

ICS
27.010
CCS
F00
发布
2015-10-12
实施
2015-12-12

This part displays Office of Management and Budget (OMB) control numbers assigned to information collection requirements. This part aids in fulfilling the requirements of the Paperwork Reduction Act to display current OMB control numbers for these information collection requirements.

Conservation of power and water resources. Part389:OMB control numbers for commission information collection requirements. Section389.101:OMB control numbers assigned pursuant to the Paperwork Reduction Act.

ICS
CCS
F00
发布
2015-03-11
实施
2015-03-11

Technical Guidelines for Energy Efficiency Evaluation of Elevators in Use

ICS
27.010
CCS
F00
发布
2015-02-09
实施
2015-03-09

Unless the Commission orders direct billing under § 381.107 of this chapter or otherwise, the fee established for an application for Commission certification as a qualifying small power production facility, as defined in section 3(17) of the Federal Power Act, is $20,860 and the fee established for an application for Commission certification as a qualifying cogeneration facility, as defined in section 3(18) of the Federal Power Act, is $23,610.

Conservation of power and water resources. Part381:Fees. SubpartE:Fees applicable to certain matters under parts II and III of the federal power act and the public utility regulatory policies act. Section381.505:Certification of qualifying status as a sma

ICS
CCS
F00
发布
2015
实施
2015

(a) Applications shall be evaluated for funding generally within 6 months, but in any event no later than 12 months, from the date of receipt by DOE. After DOE has held an application for 6 months, the applicant may, in response to DOE’s request, be required to revalidate the terms of the original application.

Energy. Part602:Epidemiology and other health studies financial assistance program. Section602.9:Application evaluation and selection.

ICS
CCS
F00
发布
2014-12-19
实施
2014-12-19

(a) An original and seven copies of\ the application for initial support must be submitted, except that State and local governments and Indian tribaln governments shall not be required to submit more than the original and two copies of the application.

Energy. Part602:Epidemiology and other health studies financial assistance program. Section602.8:Application requirements.

ICS
CCS
F00
发布
2014-12-19
实施
2014-12-19



Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号