RP 11T-1983

RECOMMENDED PRACTICE FOR INSTALLATION AND OPERATION OF WET STEAM GENERATORS (First Edition)


 

 

非常抱歉,我们暂时无法提供预览,您可以试试: 免费下载 RP 11T-1983 前三页,或者稍后再访问。

如果您需要购买此标准的全文,请联系:

点击下载后,生成下载文件时间比较长,请耐心等待......

 

标准号
RP 11T-1983
发布日期
1983年03月01日
实施日期
2011年10月21日
废止日期
中国标准分类号
/
国际标准分类号
/
发布单位
API - American Petroleum Institute
引用标准
30
适用范围
Introduction The Wet Steam Generator used in enhanced oil recovery is a forced circulation once through design. It is also known by many other common names such as thermal recovery heater@ oil field heater@ etc. The once through design enables the use of water essentially free for hardness and suspended solids@ but of relatively high total dissolved solids. The equipment normally uses a fixed water flow system with some modulation capabilities for reduced output. The equipment does not contain drums or level controls@ which are normally associated with stationary boilers. The Wet Steam Generator can be designed for installation in environments found in oil production areas of the world. Minimum operator attention is required. For the most common sizes of Wet Steam Generators@ field construction is held to a minimum. Most units are skid mounted and can be transported by rail@ truck@ or ship. The Wet Steam Generator is equipped with necessary controls and instrumentation to monitor operating pressures@ flows@ temperatures@ etc.@ to protect personnel and equipment.




Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号