F20 电力综合 标准查询与下载



共找到 679 条与 电力综合 相关的标准,共 46

Power quality monitoring terminal detection technical specification

ICS
29.24
CCS
F20
发布
2018-06-06
实施
2018-10-01

Guidelines for acceptance of folded filter elements for water treatment in power plants

ICS
27.1
CCS
F20
发布
2018-06-06
实施
2018-10-01

Technical guidelines for 35kV power distribution in rural power grids

ICS
29.24
CCS
F20
发布
2018-06-06
实施
2018-10-01

Data Interface Specification for Power Reliability Management Information System Part 1: General Requirements

ICS
27.1
CCS
F20
发布
2018-04-03
实施
2018-07-01

Steel rubber-lined pipes and fittings for power plants

ICS
27.1
CCS
F20
发布
2018-04-03
实施
2018-07-01

Hazard identification and evaluation specification for waste-to-energy plants

ICS
27.1
CCS
F20
发布
2018-04-03
实施
2018-07-01

Guidelines for Construction Technology of Iron Tower Assembly for 110kV~750kV Overhead Transmission Lines

ICS
29.24
CCS
F20
发布
2018-04-03
实施
2018-07-01

Guidelines for Water Saving in Thermal Power Plants

ICS
27.1
CCS
F20
发布
2018-04-03
实施
2018-07-01

Guidelines for Ordering and Acceptance of Hydraulic Control Check Butterfly Valves at the Outlet of Water Pumps in Power Stations

ICS
27.1
CCS
F20
发布
2018-04-03
实施
2018-07-01

Pricing Specifications for Bill of Quantities of Power Grid Technical Transformation Projects

ICS
29.24
CCS
F20
发布
2018-04-03
实施
2018-07-01

Calculation specification for bill of quantities of power grid maintenance engineering

ICS
29.24
CCS
F20
发布
2018-04-03
实施
2018-07-01

Technical Specifications for Series Capacitor Compensation Devices for Distribution Networks

ICS
29.240.99
CCS
F20
发布
2018-04-03
实施
2018-07-01

Specification for inspection of conductive FRP anodes for wet electrostatic precipitators

ICS
27.1
CCS
F20
发布
2018-04-03
实施
2018-07-01

Specifications for Calculation of Bill of Quantities for 20kV and Below Distribution Network Projects

ICS
29.24
CCS
F20
发布
2018-04-03
实施
2018-07-01

Test method for Leeb hardness of high alloy steel for power equipment

ICS
27.1
CCS
F20
发布
2018-04-03
实施
2018-07-01

On-site detection method of mineral oil, hydrolyzable fluoride and acidity in sulfur hexafluoride gas

ICS
27.1
CCS
F20
发布
2018-04-03
实施
2018-07-01

Acceptance Guidelines for Biological Aerated Filters in Power Plants

ICS
27.1
CCS
F20
发布
2018-04-03
实施
2018-07-01

Inspection and maintenance rules for flexible direct current transmission converter valves

ICS
29.240.99
CCS
F20
发布
2018-04-03
实施
2018-07-01

DL/T 5210的本部分规定了火力发电工程热工仪表及控制装置施工质量验收标准及单项工程施工质量评价、单台机组质量评价和整体工程质量评价的相关要求。 本部分适用于新建、扩建和改建的单机容量 300MW-1000MW 级火力发电工程热工仪表及控制装置的施工质量验收和工程质量评价。300MW 以下火力发电工程热工仪表及控制装置的施工质量验收和工程质量评价,可参照本部分执行。

Code for construction quality acceptance and evaluation of electric power construct Part 4: instrumentation and control

ICS
27.1
CCS
F20
发布
2018-04-03
实施
2018-07-01

Guidelines for ordering and acceptance of desuperheating and decompression devices in power stations

ICS
27.1
CCS
F20
发布
2018-04-03
实施
2018-07-01



Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号