F20 电力综合 标准查询与下载



共找到 679 条与 电力综合 相关的标准,共 46

Technical Specifications for Expansion and Installation of Electric Power User Industry

ICS
29.240
CCS
F20
发布
2018-12-25
实施
2019-05-01

Electric power construction construction quality acceptance code part 5: welding

ICS
27.100
CCS
F20
发布
2018-12-25
实施
2019-05-01

Specification for construction quality checkout and evaluation of electric equipment installation Part 12:Lowvoltage apparatus

ICS
29.240
CCS
F20
发布
2018-12-25
实施
2019-05-01

Technical specification for boiler furnace safety monitoring system in thermal power plant

ICS
27.100
CCS
F20
发布
2018-12-25
实施
2019-05-01

Guidelines for Performance Test of Low Pressure Economizer

ICS
27.100
CCS
F20
发布
2018-12-25
实施
2019-05-01

Specification for construction quality checkout and evaluation of electric equipment installation Part 17:Electric lighting device

ICS
29.240
CCS
F20
发布
2018-12-25
实施
2019-05-01

Specification for construction quality checkout and evaluation of electric equipment installation Part 15:Electric device of explosion atmospheres

ICS
29.240
CCS
F20
发布
2018-12-25
实施
2019-05-01

Specification for construction quality checkout and evaluation of electric equipment installation Part 9:Battery

ICS
29.240
CCS
F20
发布
2018-12-25
实施
2019-05-01

Calibration specification for transformer winding deformation tester

ICS
29.240
CCS
F20
发布
2018-12-25
实施
2019-05-01

Guidelines for Calculation of Power Network Power Loss

ICS
29.240
CCS
F20
发布
2018-12-25
实施
2019-05-01

General technical requirements for robot inspection system for overhead transmission lines

ICS
29.240
CCS
F20
发布
2018-12-25
实施
2019-05-01

Specification for construction quality checkout and evaluation of electric equipment installation Part 13:Power converter equipment

ICS
29.240
CCS
F20
发布
2018-12-25
实施
2019-05-01

Energy Efficiency Evaluation Method for Coal-fired Units

ICS
27.100
CCS
F20
发布
2018-12-25
实施
2019-05-01

Specification for construction quality checkout and evaluation of electric equipment installation Part 12:Lowvoltage apparatus

ICS
29.240
CCS
F20
发布
2018-12-25
实施
2019-05-01

Time Synchronization System for Power System Part 3: Technical Specifications for Time Synchronization Based on Digital Synchronization Network

ICS
29.240
CCS
F20
发布
2018-12-25
实施
2019-05-01

Technical regulations for manufacturing quality supervision of steam-water pressure pipes in thermal power plants

ICS
27.100
CCS
F20
发布
2018-12-25
实施
2019-05-01

General specifications for merging unit testers for metrology

ICS
29.240
CCS
F20
发布
2018-12-25
实施
2019-05-01

Technical guidelines for safe operation of hydrogen systems in thermal power plants

ICS
27.100
CCS
F20
发布
2018-12-25
实施
2019-05-01

本标准规定了编写火力发电厂(以下简称发电厂)可行性研究报告(以下简称可研报告)的基本工作内容、编写尝试及程序的要求。 本标准适用于发电厂新建、扩建或改建工作项目。

Regulation for content and depth of feasibility study report of fossil fuel power plant

ICS
29.240
CCS
F20
发布
2018-12-25
实施
2019-05-01

Gravimetric method for testing technical specifications of low-concentration particulate matter in thermal power plants

ICS
27.100
CCS
F20
发布
2018-12-25
实施
2019-05-01



Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号