F22 电力系统设备安装测试 标准查询与下载



共找到 91 条与 电力系统设备安装测试 相关的标准,共 7

本标准规定了智能电能表的功能要求、功能配置、显示项目、费控功能、事件阀值等各项指标要求,规范了智能电能表的术语和定义。 本标准适用于电力行业规范单、三相智能电能表(以下简称“电能表”)的设计、制造、订货、验收和使用。

Functional specification for smart electricity meters

ICS
27.100
CCS
F22
发布
2015-07-01
实施
2015-10-01

本标准规定了单相智能电能表(以下简称“电能表”)的规格、适应环境、机械性能、电气性能、抗干扰及可靠性等方面的技术要求和试验项目,规范了电能表的功能设置,并给出了电能表的检验规则。 本标准适用于电力行业规范测量参比频率为50Hz(或60Hz)交流电能的安装式单相智能电能表的设计、制造、订货和使用。

Technical specification for single phase smart electricity meters

ICS
27.100
CCS
F22
发布
2015-07-01
实施
2015-10-01

Technical specifications for single-phase static multi-rate electric energy meters

ICS
27.100
CCS
F22
发布
2015-07-01
实施
2015-10-01

Three-phase smart energy meter technical specification

ICS
27.100
CCS
F22
发布
2015-07-01
实施
2015-10-01

Technical specifications for security authentication of smart energy meter information exchange

ICS
27.100
CCS
F22
发布
2015-07-01
实施
2015-10-01

Type specification for three-phase smart energy meter

ICS
27.100
CCS
F22
发布
2015-07-01
实施
2015-10-01

Technical Specifications for DC Energy Meters

ICS
17.040.30
CCS
F22
发布
2015-07-01
实施
2015-10-01

本标准可用于有补燃的或无补燃的联合循环汽轮机和联合循环热电联产汽轮机性能试验。在这些机组类别中,本标准可应用于凝汽式和非凝汽式汽轮机、有再热的和无再热的汽轮机,以及有补汽或抽汽的汽轮机。目前,热力循环的多样性对编写一个适用于所有循环配置的标准提出了挑战。对于核电或火电给水回热循环汽轮机试验,宜采用ASME PTC 6。本标准仅适用于以蒸汽作为工质的联合循环汽轮机热力性能试验。 本标准提供了修正到参考工况下的汽轮发电机输出性能的试验及计算方法,对汽轮机整体性能进行测量。本标准包含了试验实施和结果报告的规则和步骤,包括对预备性试验安排、测试技术、仪表、测量方法、试验结果和不确定度计算方法的要求。

Steam turbines in combined cycles performance test codes

ICS
27.100
CCS
F22
发布
2015-04-02
实施
2015-09-01

本标准涉及的蒸汽锅炉的主要功能是回收燃气轮机排气的余热。本标准的方法也可用于以下其他余热回收装置的性能试验: 1) 仅加热水的余热回收装置; 2) 除水以外的其他工质的余热回收装置; 3) 除燃气轮机排气余热外的其他热气源的余热回收装置; 4) 可用新鲜空气燃烧的余热锅炉。 本标准不包含以下试验范围: 1) 主要功能不是回收燃气轮机排气余热的燃煤蒸汽锅炉; 2) 辅助设备,如泵和风机性能; 3) 除氧器性能; 4) 设备噪声; 5) 气体污染物排放; 6) 蒸汽纯度。

Gas turbine heat recovery steam generators performance test codes

ICS
27.100
CCS
F22
发布
2015-04-02
实施
2015-09-01

The project sponsors of all consumptive water uses subject to review and approval under §806.4, §806.5 or §806.6 of this part shall comply with this section.

Conservation of power and water resources. Part806:Review and approval of projects. Subpart C:Standards for review and approval. Section806.22:Standards for consumptive uses of water.

ICS
CCS
F22
发布
2014-12-18
实施
2014-12-18

Any project sponsor submitting an application to the Commission shall provide notice thereof to the appropriate agency of the member State, each municipality in which the project is located, and the county planning agency of each county in which the project is located. The project sponsor shall also publish notice of submission of the application at least once in a newspaper of general circulation serving the area in which the project is located. The project sponsor shall also meet any of the notice requirements set forth in paragraphs (b) through (e) of this section, if applicable. All notices required under this section shall be provided or published no later than 10 days after submission of the application to the Commission and shall contain a description of the project, its purpose, the requested quantity of water to be withdrawn obtained from for sources other than withdrawals or consumptively used, and the address, electronic mail address, and phone number of the project sponsor and the Commission. All such notices shall be in a form and manner as prescribed by the Commission.

Conservation of power and water resources. Part806:Review and approval of projects. Subpart B:Application procedure. Section806.15: Notice of application.

ICS
CCS
F22
发布
2014-12-18
实施
2014-12-18

本标准规定了电力调度员培训仿真的功能要求、数据接口及仿真性能。 本标准适用省级及以上电力调度员培训仿真的设计、研发、建设和验收,市、县级调度员培训仿真可参照执行。

Technical specification for dispatcher training simulator

ICS
27.100
CCS
F22
发布
2014-10-15
实施
2015-03-01

本标准规定了立式水轮发电机(以下简称“发电机”)现场检修的等级、间隔、项目、试验和工艺质量要求。本标准适用于额定功率在15MW及以上的发电机检修。

Technical code for maintenance of vertical hydro-generators

ICS
29.160.20
CCS
F22
发布
2014-03-18
实施
2014-08-01

Communication networks and systems for power utility automation - Part 10: Conformance testing (IEC 61850-10:2012); English version EN 61850-10:2013

ICS
33.040.40
CCS
F22
发布
2014-02
实施
2014-02-01

Communication networks and systems for power utility automation - Part 3: General requirements

ICS
33.040.40;33.200
CCS
F22
发布
2013-12
实施

本标准规定了9FA燃气一蒸汽联合循环机组维修的基本要求。本标准适用于以天然气为燃料的9FA燃气-蒸汽联合循环机组的维修。

Maintenance and repair specification for 9FA gas turbine and steam turbine combined cycle unit

ICS
27.100
CCS
F22
发布
2013-03-07
实施
2013-08-01

本标准规定了10kV及以下电力用户受电工程技术规范的术语和定义、10kV及以下配电网规划原则、供电方案编制原则、用户受电工程接入电力系统技术要求、用户受电工程设备选型标准。 本标准适用于全省10kV及以下电力用户受电工程的新建、扩建和改造。

10kV and below power user power receiving engineering technical specification

ICS
27.100
CCS
F22
发布
2012-12-17
实施
2013-01-01

本标准规定了对水电厂计算机监控系统进行试验、验收的基本项目及测试方法。本标准适用于大、中型水电厂计算机监控系统的制造过程、现场安装投运等各阶段的试验、验收,梯级水电厂和小型水电厂计算机监控系统可参照使用。

Code of test and acceptance of monitoring and control system for hydropower plants

ICS
27.140
CCS
F22
发布
2012-08-23
实施
2012-12-01

Communication networks and systems for power utility automation - Part 7-1 : basic communication structure - Principles and models.

ICS
33.040.40
CCS
F22
发布
2012-03-01
实施
2012-03-15

本标准适用于水电水利工程24kV及以下电压等级的发电电气设备安装工程质量等级评定。

Quality degree evaluate standard of unit engineering for hydropower and water conservancy construction engineering.Part 5:Electric generation equipment installation engineering

ICS
27.140
CCS
F22
发布
2012-01-04
实施
2012-03-01