P21 土石方、遂道工程 标准查询与下载



共找到 150 条与 土石方、遂道工程 相关的标准,共 10

Code for construction and quality acceptance of urban comprehensive pipe gallery project

ICS
93.020
CCS
P21
发布
2019-03-26
实施
2019-07-01

本规程规定了钢管混凝土桥梁焊接节点总则、术语和符号、材料、连接类别与疲劳强度、荷载及疲劳应力幅、疲劳强度验算、构造与工艺、维护管理等内容。 本规程适用于圆形钢管混凝土桁式结构桥梁焊接节点和接头的疲劳设计。

Technical specification for fatigue of welded joints of concrete filled steel tube bridges

ICS
93.060
CCS
P21
发布
2018-07-23
实施
2018-08-01

Technical regulations for pipe crossing engineering with pipe jacking method

ICS
93.020
CCS
P21
发布
2018-05-08
实施
2018-07-01

EN ISO 18674-3 applies to the measurement of displacements across a measuring line by means of inclinometers carried out for geotechnical monitoring. ISO 18674-3 also refers to deflectometers (see Annex B) to supplement inclinometers for the determination of horizontal displacements across horizontal measuring lines.

Geotechnical investigation and testing - Geotechnical monitoring by field instrumentation - Part 3: Measurement of displacements across a line: Inclinometers (ISO 18674-3:2017); German version EN ISO 18674-3:2017

ICS
13.080.20;93.020
CCS
P21
发布
2018-04-01
实施

Geotechnical investigation and testing. Identification and classification of soil. Principles for a classification

ICS
93.020
CCS
P21
发布
2018-03-16
实施
2018-03-16

盾构维护高气压作业与潜水施工作业性质非常相近,除作业环境不同外,均为在高气压下作业,进仓作业人员要呼吸与工作压力相等的高压气体。因此,在工作压力大于0.12MPa的压缩空气和工作压力更大(≥0.6MPa)的混合气盾构维护作业中,由经过高气压医学检查、培训及锻炼,适应高气压作业的潜水员或相应的工作人员来完成是十分必要的。在目前国内外尚无统一的作业标准情况下,在潜水行业内起草本规程,可以规范、指导盾构维护高气压作业,提高行业内此项操作的技能水平,为作业人员安全施工提供保障。 本规程适用于盾构高气压环境下换刀、焊接、切割和检测等维护作业,适用于呼吸压缩空气或混合气的盾构维护常规高气压作业。 盾构高气压下换刀、焊接、切割和检测等维护作业除应符合本规程规定之外,尚应符合国家现行有关标准的规定。

Operating regulations for tunnel boring machine maintenance under hyperbaric pressure

ICS
93.060
CCS
P21
发布
2018-01-30
实施
2018-01-30

This document specifies the measurement of displacements across a line by means of inclinometers carried out for geotechnical monitoring. General rules of performance monitoring of the ground, of structures interacting with the ground, of geotechnical fills and of geotechnical works are presented in This document also refers to deflectometers (see Annex B) to supplement inclinometers for the determination of horizontal displacements across horizontal measuring lines. NOTE In general, there are two independent displacement components acting across measuring lines. Inclinometers allow the determination of the two components for vertical measuring lines. For horizontal lines, inclinometers are limited to the determination of the vertical component only. If applied in conjunction with ISO 18674-2, this document allows the determination of displacements acting in any direction. This document is applicable to: — checking geotechnical designs in connection with the Observational Design procedure; — monitoring of geotechnical structures prior to, during and after construction (e.g. natural slopes, slope cuts, embankments, excavation walls, foundations, dams, refuse dumps, tunnels); — deriving geotechnical key parameters (e.g. from results of pile load tests or trial tunnelling); — identification and monitoring of active shear planes in the ground. NOTE This document fulfils the requirements for the performance monitoring of the ground, of structures interacting with the ground and of geotechnical works by the means of inclinometers as part of the geotechnical investigation and testing in accordance with References [1] and [2].

Geotechnical investigation and testing - Geotechnical monitoring by field instrumentation - Part 3: Measurement of displacements across a line: Inclinometers

ICS
13.080.20;93.020
CCS
P21
发布
2017-10-01
实施

Foundation pile dynamic tester

ICS
93.02
CCS
P21
发布
2017-05-27
实施
2017-12-01

Geotechnical investigation and testing - Geotechnical monitoring by field instrumentation - Part 2: Measurement of displacements along a line: Extensometers (ISO 18674-2:2016); German version EN ISO 18674-2:2016

ICS
13.080.20;93.020
CCS
P21
发布
2017-03
实施

This technical specification provides guidance, specifications and requirements on the use of Continuous Compaction Control (CCC) as a quality control method in earthworks by means of roller integrated dynamic measuring and documentation systems. The CCC method is suitable for soils, granular materials and rockfill materials which can be compacted using vibratory rollers. NOTE A continuous Compaction Control (CCC) technology based on the measure of propel energy necessary to overcome the rolling resistance is also available and can be used as a quality control method in earthworks. The propelling power of the compactor provides an indication of the material stiffness and it is measured as a function of the machine ground speed, slope angle and rolling resistance. This method is not included in this document.

Earthworks - Continuous Compaction Control (CCC)

ICS
93.020
CCS
P21
发布
2016-12
实施

Geotechnical investigation and testing. Testing of geotechnical structures. Testing of piles: rapid load testing

ICS
93.020
CCS
P21
发布
2016-10-31
实施
2016-10-31

Geotechnical investigation and testing - Geotechnical monitoring by field instrumentation - Part 2: Measurement of displacements along a line: Extensometers

ICS
13.080.20;93.020
CCS
P21
发布
2016-10
实施

Geotechnical investigation and testing. Field testing. Measuring while drilling

ICS
93.020
CCS
P21
发布
2016-09-30
实施
2016-09-30

本规程规定了公路瓦斯隧道分类标准、勘察方法、设计措施、施工措施及设备配置、揭煤防突措施、风险评估指标等。 本规程适用于公路瓦斯隧道勘察、设计、施工、运营管理、风险评估和质量检验与验收。

Technical specification for highway gas tunnel

ICS
93.060
CCS
P21
发布
2016-08-18
实施
2016-09-01

Automobile roads of general use. Geosynthetic for road construction. Method for determining the microbiological resistance of geosynthetics

ICS
93.080.20
CCS
P21
发布
2016
实施
2016-09-01

Geotechnical investigation and testing - Geotechnical monitoring by field instrumentation - Part 1 : general rules

ICS
13.080.20;93.020
CCS
P21
发布
2015-12-25
实施
2015-12-25

Execution of special geotechnical work - Diaphragm walls; German version EN 1538:2010+A1:2015

ICS
93.020
CCS
P21
发布
2015-10
实施

Geotechnical investigation and testing - Geotechnical monitoring by field instrumentation - Part 1: General rules (ISO 18674-1:2015); German version EN ISO 18674-1:2015

ICS
13.080.20;93.020
CCS
P21
发布
2015-09
实施

Execution of special geotechnical works - Displacement piles; German version EN 12699:2015

ICS
93.020
CCS
P21
发布
2015-07
实施

Code of practice for earth retaining structures

ICS
93.020
CCS
P21
发布
2015-06-30
实施
2015-06-30



Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号