P61 发电站工程 标准查询与下载



共找到 285 条与 发电站工程 相关的标准,共 19

适用于火力发电厂、燃气-蒸汽联合循环电厂、太阳能热发电厂、生物质发电厂的新建及扩建工程设计;同时适用于在役机组改造工程设计。主要内容包括:总则、术语、基本规定、总体规划设计、系统设计、功能设计、现场设备、网络安全、数字化移交。

Smart power plant design specifications

ICS
27.100
CCS
P61
发布
2022-11-04
实施
2023-05-04

本规程适用于海上风电场工程风电机组及海上自立式测风塔基础嵌岩桩基设计。

Code for design of rock-socketed pile foundations for offshore wind farm engineering

ICS
27.180
CCS
P61
发布
2022-11-04
实施
2023-05-04

本规范适用于通过66kV及以上电压等级接入电力系统的风电场工程。

Code for Electrical Design of Wind Farm Engineering

ICS
27.180
CCS
P61
发布
2022-05-13
实施
2022-11-13

本规范适用于风电场工程陆上风电机组基础和海上风电机组固定式基础的安全监测设计。

Code for design of wind turbine foundation safety monitoring in wind farm engineering

ICS
27.180
CCS
P61
发布
2022-05-13
实施
2022-11-13

Guidelines for intelligent design of chemical systems in thermal power plants

ICS
CCS
P61
发布
2022-01-19
实施
2022-05-01

Anti-corrosion design specifications for offshore wind farm projects

ICS
27.180
CCS
P61
发布
2021-04-26
实施
2021-10-26

Technical Specifications for Testing and Inspection of Concrete for Wind Farm Engineering

ICS
27.180
CCS
P61
发布
2020-10-23
实施
2021-02-01

本部分规定了输变电工程建设过程中产生的数字化产品的编码、分类、内容、形式和基本要求,以及数字化产品移交的基本要求。

Standard for digital products of electric power engineering Tansmission and substation

ICS
01.020
CCS
P61
发布
2019-09-09
实施
2019-09-09

Technical specification for construction of flue gas purification device in thermal power plant

ICS
27.100
CCS
P61
发布
2019-06-04
实施
2019-10-01

Construction Technical Specifications for Electric Power Construction Part 8: Processing and Preparation

ICS
27.100
CCS
P61
发布
2019-06-04
实施
2019-10-01

Construction Technical Specifications for Electric Power Construction Part 5: Piping and Systems

ICS
27.100
CCS
P61
发布
2019-06-04
实施
2019-10-01

Construction Technical Specifications for Electric Power Construction Part 3: Turbine Generator Sets

ICS
27.100
CCS
P61
发布
2019-06-04
实施
2019-10-01

Guidelines for Thermal Control Commissioning of Units in Thermal Power Construction Projects

ICS
27.100
CCS
P61
发布
2019-06-04
实施
2019-10-01

Construction Technical Specifications for Electric Power Construction Part 2: Boiler Units

ICS
27.100
CCS
P61
发布
2019-06-04
实施
2019-10-01

Electric power construction construction quality acceptance code part 6: adjustment test

ICS
27.100
CCS
P61
发布
2019-06-04
实施
2019-10-01

Construction Technical Specifications for Electric Power Construction Part 4: Thermal Instruments and Control Devices

ICS
27.100
CCS
P61
发布
2019-06-04
实施
2019-10-01

Construction Technical Specifications for Electric Power Construction Part 6: Water Treatment and Hydrogen Production (Supply) Equipment and Systems

ICS
27.100
CCS
P61
发布
2019-06-04
实施
2019-10-01

Geotechnical test procedures for offshore wind farm engineering

ICS
27.18
CCS
P61
发布
2018-12-25
实施
2019-05-01

Technical Specifications for Micro Site Selection of Wind Farm Projects

ICS
27.18
CCS
P61
发布
2018-12-25
实施
2019-05-01

Specifications for geological survey of photovoltaic power generation projects

ICS
27.16
CCS
P61
发布
2018-12-25
实施
2019-05-01



Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号