API RP 2D RUSSIAN-2007
OPERATION AND MAINTENANCE OF OFFSHORE CRANES (Sixth Edition; Includes Errata: 05/2007)

Operation and Maintenance of Offshore Cranes


 

 

非常抱歉,我们暂时无法提供预览,您可以试试: 免费下载 API RP 2D RUSSIAN-2007 前三页,或者稍后再访问。

您也可以尝试购买此标准,
点击右侧 “购买” 按钮开始采购(由第三方提供)。

点击下载后,生成下载文件时间比较长,请耐心等待......

 

标准号
API RP 2D RUSSIAN-2007
发布
2007年
发布单位
API - American Petroleum Institute
 
 
被代替标准
API RP 2D:2003
适用范围
This Recommended Practice is intended to serve as a guide to Crane Owners and Crane Operators in developing operating and maintenance practices and procedures for use in the safe operation of pedestal-mounted revolving cranes on fixed or floating off-shore platforms, jackup drilling rigs, semi-submersible drilling rigs and other types of mobile offshore drilling units (MODUs). Guidelines are also given for the pre-use inspection and testing of temporary cranes (also called self-erecting, leapfrog or bootstrap cranes) that are erected offshore. These minimum practices are presented on the premise that: a. Inspections are intended to identify all deficiencies or items, which would affect the safe operation or reduce the lifting capability of the crane. Inspections should utilize methods and procedures appropriate for the crane type and its past and anticipated usage, as determined by the Crane Owner. b. Action taken to correct a deficiency should be made as soon as practicable. c. Limited (restricted) service may, in some cases, be continued after the identification and before correction of a deficiency. In such cases, it is the responsibility of the Qualified Crane Operator or Qualified Inspector to document the deficiency, reporting it to the Crane Owners. Based on this information, the Crane Owner should define the appropriate restriction and post necessary cautionary notices, after consultation with the Crane Manufacturer, Authorized Surveyor, certifying authority or other qualified source (such as an API-licensed 2C Crane Manufacturer, or an engineer experienced in the design of the crane, as determined by the Crane Owner). d. Conformance to the intent of the programs and practices recommended herein is intended to result in cranes that operate safely and efficiently between inspection periods and in accordance with a company's Safety and Environmental Management Program (SEMP) (see API RP 75). Each Crane Owner, Qualified Crane Operator, Qualified Inspector, and Qualified Rigger is encouraged to follow the recommendations outlined herein, and to modify or supplement them with any practices or procedures which are more appropriate for the type and duty cycle -both past and future -of the crane, provided the minimum recommendations and the intent of the programs stated herein are met.

API RP 2D RUSSIAN-2007相似标准





Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号