ACI 325.11R-2001
混凝土摊铺的加速技术

Accelerated Techniques for Concrete Paving

2019-03

 

 

非常抱歉,我们暂时无法提供预览,您可以试试: 免费下载 ACI 325.11R-2001 前三页,或者稍后再访问。

您也可以尝试购买此标准,
点击右侧 “购买” 按钮开始采购(由第三方提供)。

点击下载后,生成下载文件时间比较长,请耐心等待......

 

标准号
ACI 325.11R-2001
发布
2001年
发布单位
ACI - American Concrete Institute
替代标准
ACI 325.11R-2019
当前最新
ACI 325.11R-2019
 
 
适用范围
"General Airport authorities and road agencies face major challenges from increasing traffic volumes on existing airports@ roadways@ and urban streets. Owners must repair or replace deteriorated pavements while maintaining traffic on these structures. Traditional pavement construction@ repair@ or replacement solutions may no longer be universally acceptable due to increasing public impatience with traffic interruption. Traditional solutions are especially inappropriate in urban areas where congestion is severe. Accelerated construction techniques for portland cement concrete pavement resolve these problems by providing quick public access to a highquality@ long-lasting pavement. Accelerated construction techniques are suitable for new construction@ reconstruction@ or resurfacing projects. Accelerated construction for concrete paving is often referred to as ""fast-track"" concrete paving. Accelerated paving encompasses two classes of activities: technological methods to accelerate the rate of strength gain and contractual methods to minimize the construction time. Many methods exist to accelerate pavement construction. Two traditional acceleration methods are time incentives and penalties for project completion. Agencies have been using these time-of-completion incentives for many years@ and often contractors will meet these requirements by lengthening the work day or increasing the size of construction crews. Using accelerated paving techniques@ a contractor often can complete a project without increasing crew size or changing normal labor schedules."

ACI 325.11R-2001相似标准


推荐

沥青混凝土路面施工工艺

为了保证达到规定压实质量,又要达到要求平整度,采取了调整机械组合,来提高上面层质量。碾压遵循原则:①由路外侧(低侧)向中央分隔带方面碾压。②少量喷水,保持高温,梯形重迭,分段碾压。③每个碾道与相邻碾道重迭1/2轮宽。④振动压路机用振动压实时,需停驶、前进或返回时,应先停振,再换挡。1.8 接缝处理由于工作中断,材料末端已经冷却,或者在第二天恢复工作时,作成一条横缝。...

自动混凝土透气系数测定仪、透气系数维修与保养

1.3 和振捣 对于半干硬性现场拌制混凝土一次容许达到混凝土路面板zui大板厚度为22~600px;塑性商品混凝土一次zui大厚度为650px。超过一次zui大厚度时,应分两次和振捣,两层间隔时间不得超过30min,下层厚度约大于上层,且下层厚度为3/5。每次混凝土、振捣、整平、抹面应连续施工,如需中断,应设施工缝,其位置应在设计规定接缝位置。...

铁路瓦斯隧道技术规范混凝土透气系数测定仪

1.3 和振捣 对于半干硬性现场拌制混凝土一次容许达到混凝土路面板zui大板厚度为22~600px;塑性商品混凝土一次zui大厚度为650px。超过一次zui大厚度时,应分两次和振捣,两层间隔时间不得超过30min,下层厚度约大于上层,且下层厚度为3/5。每次混凝土、振捣、整平、抹面应连续施工,如需中断,应设施工缝,其位置应在设计规定接缝位置。...

水稳层是如何施工

终平应仔细进行,必须将局部高出部分刮除并扫出路外;对于局部低洼之处,不再进行找补,可留待筑沥青面层或混凝土面层时处理。2.7水泥稳定粒料横向接缝处理和纵缝处理①水稳料时,不宜中断,如因故中断时间超过2h,应设置横向接缝。②人工将未端含水量合适水稳料弄整齐,紧靠水稳料放2根方木,方木高度应与水稳料压实厚度相同,整平紧靠方木水稳料(也可以用钢模代替方木)。...





Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号