IEEE 690-2018
核电站1E类电路电缆系统设计和安装标准

Standard for Design and Installation of Cable Systems for Class 1E Circuits in Nuclear Power Generating Stations


 

 

非常抱歉,我们暂时无法提供预览,您可以试试: 免费下载 IEEE 690-2018 前三页,或者稍后再访问。

您也可以尝试购买此标准,
点击右侧 “购买” 按钮开始采购(由第三方提供)。

点击下载后,生成下载文件时间比较长,请耐心等待......

 

标准号
IEEE 690-2018
发布
2018年
发布单位
IEEE - The Institute of Electrical and Electronics Engineers@ Inc.
当前最新
IEEE 690-2018
 
 
适用范围
This standard provides requirements for the design and installation of safety related electrical cable systems@ including associated circuits@ in nuclear power generating stations. Also provided are requirements for the design and installation of those non-safety related cable systems that may affect the function of safety related systems. NOTE??The term ??associated?? circuits is not repeated throughout the text; however@ all requirements for the design and installation of cable systems for Class lE circuits apply equally to associated circuits unless it can be shown by test or analysis that the associated circuits cannot affect the performance of the Class lE circuits.3 Purpose The purpose of this standard is to identify existing standards and to establish requirements pertaining to safetyrelated cable systems in nuclear power generating stations. Solutions are recommended for areas of concern such as fire protection@ raceways@ separation@ cable performance requirements@ and installation acceptance testing and documentation.4 3Notes in text@ tables@ and figures of a standard are given for information only and do not contain requirements needed to implement this standard. 4Other solutions may also be acceptable based on an engineering review of the specifics involving the installation. Each situation should be reviewed and examined on its own merits.

IEEE 690-2018相似标准


推荐

5家单位民用核安全设备许可证变更

4国核电站运行服务技术有限公司国核安证字W(19)01号超声检验(UT)的检验能力特征参数中,碳钢、低合金钢、不锈钢焊接接头范围增加“厚度5~6mm,且外径大于等于60mm”;目视检验(VT)的检验活动范围由“制造、安装及役前/在役检查阶段母材焊接接头的目视检验”变更为“制造、安装及役前/在役检查阶段的目视检验”。...

浅析低频电缆组装件设计原则与要求(一)

安装方式:电连接器的法兰盘有前安装安装型两。前安装是将插座尾端从安装面板前面穿过安装孔予以安装,当插座连接电缆后,由于尾端有电缆束,前安装不易实现。而采用后安装的插座,则不存在这个问题。前安装较为方便。后安装方式要求设备面板的厚度与插座相匹配,因此,需要进行专门的设计。在选用时,可根据系统安装要求和电连接器特点进行综合考虑。...

海洋强国“标配”:全球首座海上浮动核电站海试

它们都是中国自主研发、自主设计的海上小型反应堆技术,能为海上油气田开采、海岛开发等领域的供电、供热和海水淡化提供可靠、稳定的电力。对于ACPR50S,中广核小型堆总设计师芮旻在接受澎湃新闻采访时曾表示,ACPR50S海上小型堆的特点是模块化设计、紧凑型布置,能实现在易于安装、运行检修的同时,消除大破口事故的发生。...

RAM-Ⅰ xγ辐射报警仪

   RAM-Ⅰ xγ辐射报警仪   RAM-I型是一种新型的固定式安装的xγ辐射连续监测报警装置,它采用特殊设计的前置放大电路与硅探测器,具有灵敏度高、操作方便、自动显示、数据存储超阈报警等特点,能实时给出xγ辐射剂量率(μGy/h与μSv/h可以转换显示),同时可给出个人累计剂量(μSv),也可作为在线辐射监测系统实现实时监控与超阈安全报警。   ...





Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号