EN IEC 61968-5:2020

Application integration at electric utilities - System interfaces for distribution management - Part 5: Distributed energy optimization


 

 

非常抱歉,我们暂时无法提供预览,您可以试试: 免费下载 EN IEC 61968-5:2020 前三页,或者稍后再访问。

如果您需要购买此标准的全文,请联系:

点击下载后,生成下载文件时间比较长,请耐心等待......

 

标准号
EN IEC 61968-5:2020
发布
2020年
发布单位
欧洲电工标准化委员会
当前最新
EN IEC 61968-5:2020
 
 
适用范围
IEC 61968-5:2020 is the description of a set of functions that are needed for enterprise integration of DERMS functions. These exchanges are most likely between a DERMS and a DMS. However, since this is an enterprise integration standard which may leverage IEC 61968-100:2013 for application integration (using web services or JMS) or other loosely-coupled implementations, there are no technical limitations for systems with which a DERMS might exchange information. Also, it should be noted that a DERMS might communicate with individual DER using a variety of standards and protocols such as IEC 61850, IEEE 2030.5, Distribution Network Protocol (DNP), Sunspec Modbus, or perhaps Open Field Message Bus (OpenFMB). One role of the DERMS is to manage this disparity and complexity of communications on the behalf of the system operator. However, the communication to individual DER is out of scope of this standard. Readers should look to those standards to understand communication to individual DER’s smart inverter. The scope will be limited to the following use case categories: • DER group creation – a mechanism to manage DER in aggregate • DER group maintenance – a mechanism to add, remove, or modify the members and/or aggregated capabilities of a given group of DER • DER group deletion – removing an entire group • DER group status monitoring – a mechanism for quantifying or ascertaining the current capabilities and/or status of a group of DER • DER group forecast – a mechanism for predicting the capabilities and/or status of a group of DER for a given time period in the future • DER group dispatch – a mechanism for requesting that specified capabilities of a group of DER be dispatched to the grid • DER group voltage ramp rate control – a mechanism for requesting that a DER group following a ramp rate curve • DER group connect/disconnect – a mechanism to request that DER either isolate themselves, or reconnect to the grid as needed.

EN IEC 61968-5:2020相似标准





Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号