适用范围
1.1 This Standard provides requirements and guidance related to the performance of periodic safety reviews (PSRs) for nuclear power plants (NPPs). Note: This Standard may be used to provide guidance for nuclear facilities other than NPPs using a graded approach. 1.2 This Standard provides specific requirements and guidance related to the PSR for a) development of the basis document; b) conducting reviews of modern requirements documents and practices; c) conducting safety factor reviews, including identification of safety factor findings; d) analysis of safety factor findings, including consolidation of identified gaps and strengths, development of global issues, and preparation of a global assessment report (GAR); and e) preparation of the integrated implementation plan (IIP) where the developed global issues are resolved into actions. 1.3 This Standard identifies required deliverables that will help facilitate achieving the objectives of the PSR process. 1.4 In this Standard, “shall” is used to express a requirement, i.e., a provision that the user is obliged to satisfy in order to comply with the Standard; “should” is used to express a recommendation or that which is advised but not required; and “may” is used to express an option or that which is permissible within the limits of the Standard. Notes accompanying clauses do not include requirements or alternative requirements; the purpose of a note accompanying a clause is to separate from the text explanatory or informative material. Notes to tables and figures are considered part of the table or figure and may be written as requirements. Annexes are designated normative (mandatory) or informative (non-mandatory) to define their application. 1.5 In this Standard, “shall be considered” or “shall consider” means that the user evaluates the impact and documents any decisions. Note: Decisions could include no action.

CSA N290.18-17:2017相似标准


推荐

关于批准福建宁德核电厂1、2号机组安全相关系统和设备定期试验监督要求(7版-报批版)的通知

〉修订升版的请示》(闽宁核〔2021〕108号)和《关于恳请审查〈宁德核电厂1、2号机安全相关系统和设备定期试验监督要求(7版-报批版)〉的请示》(闽宁核〔2023〕62号)收悉。   ...

关于批准福建宁德核电厂3、4号机组安全相关系统和设备定期试验监督要求(4版-报批版)的通知

〉修订升版的请示》(闽宁核〔2021〕108号)和《关于恳请审查〈宁德核电厂3、4号机安全相关系统和设备定期试验监督要求(4版-报批版)〉的请示》(闽宁核〔2023〕61号)收悉。   ...

关于批准广西防城港核电厂1、2号机组安全相关系统和设备定期试验监督要求(3版-报批版)的通知

关于批准广西防城港核电厂1、2号机组安全相关系统和设备定期试验监督要求(3版-报批版)的通知    广西防城港核电有限公司:   你公司《关于提请审查〈广西防城港核电厂...

关于颁发《浙江金七门核电厂1、2号机组场址选择审查意见书》的通知

根据《中华人民共和国核安全法》及相关核安全法规,我局对你公司提交的《浙江金七门核电厂1、2号机组选址安全分析报告》及相关文件进行了核安全技术审查,未发现场址存在影响浙江金七门核电厂1、2号机组安全且不能采取工程措施解决的颠覆性因素。我局决定向你公司颁发《浙江金七门核电厂1、2号机组场址选择审查意见书》(国核安证字第2315号,见附件)。   ...





Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号