IEC/TR 61660-3:2000
电厂与变电站直流辅助设施中的短路电流 第3部分:计算举例

Short-circuit currents in d.c. auxiliary installations in power plants and substations - Part 3: Examples of calculations


 

 

非常抱歉,我们暂时无法提供预览,您可以试试: 免费下载 IEC/TR 61660-3:2000 前三页,或者稍后再访问。

如果您需要购买此标准的全文,请联系:

点击下载后,生成下载文件时间比较长,请耐心等待......

 

标准号
IEC/TR 61660-3:2000
发布
2000年
发布单位
国际电工委员会
 
 
适用范围
IEC 61660-3 which is a technical report gives help for the application of IEC 61660-1 and IEC 61660-2. Therefore, the calculations for the d.c. installation in figure 1 are strictly carried out in accordance with IEC 61660-1 and 61660-2. The installation scheme with respect to the short-circuit location F3 in figure 1 does not correspond to figure 3 of IEC 61660-1. Therefore, additional considerations related to the correction factor σj are necessary and annex A should be consulted. The connecting line L1 in figure 1 consists of copper bars (see clause 4). The lines L2 and L3 are cable connections. Therefore, the mechanical and thermal effects are calculated only for L1 in case of a short circuit at the location F4.

IEC/TR 61660-3:2000相似标准


推荐





Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号