ARMY UFGS-33 24 13-2008
地下水监测水井

GROUND-WATER MONITORING WELLS


哪些标准引用了ARMY UFGS-33 24 13-2008

 

找不到引用ARMY UFGS-33 24 13-2008 地下水监测水井 的标准

 

 

非常抱歉,我们暂时无法提供预览,您可以试试: 免费下载 ARMY UFGS-33 24 13-2008 前三页,或者稍后再访问。

点击下载后,生成下载文件时间比较长,请耐心等待......

 



标准号
ARMY UFGS-33 24 13-2008
发布日期
2008年08月01日
实施日期
废止日期
发布单位
US-ARMY
适用范围
1.1 UNIT PRICES Payment for each specified item will be made at the contract unit price for that item. Payment will include full compensation for equipment, materials and labor for drilling; removal and disposal of temporary casing, cuttings, and drill fluid; preparation of borehole logs; and sample handling, containers, storage, and testing. Depth, logging, installation, casing, riser pipe, and well screen shall be measured by linear distance. Payment will not be allowed for test holes or monitoring wells abandoned due to construction practices not in accordance with this specification, or for the convenience of the Contractor. 1.1.1 Test Holes If the total depth of the test hole is greater than that specified in the contract for "Test Holes, and Samples," the additional depth will be paid for at the contract unit price for "Additional Test Hole Depth." If the test hole is developed into the permanent monitoring well, no separate payment will be made for the test hole. 1.1.2 Monitoring Well Drilling and Sampling If the total depth of the monitoring well is greater than that specified in the contract for "Monitoring Wells and Samples," the additional depth will be paid for at the contract unit price for "Additional Monitoring Well Depth." 1.1.3 Geophysical Logging The "Geophysical Logging" unit price will include interpretation of the logs and their delivery to the Government. 1.1.4 Casing/Riser Pipe Selection and Installation Payment will be made for length of blank casing actually installed in the well. Payment will include compensation for decontamination and installation of the casing/riser pipe, cap, tail piece (if any), end cap and centralizers; and for the furnishing and installing of the well identification tag with information recorded thereon, or well marking as per contract. 1.1.5 Monitoring Well Screen Payment will be made for monitoring well screen actually installed in the well. 1.1.6 Filter Pack Construction Filter pack construction will be measured by the cubic meter foot. Payment will include compensation for furnishing, delivering, storage, decontamination, analytical testing, and installing the filter pack. 1.1.7 Bentonite Seal The bentonite seal will be measured by the cubic meter foot. Payment will include full compensation for hydrating, and tremieing necessary for the work. 1.1.8 Grout Placement The cement and/or bentonite grout used in the annulus above the bentonite seal will be paid by the cubic meter foot used. Payment will include compensation for cement, mixing of the grout, and pumping of grout, bentonite, mixing of bentonite grout, and pumping of bentonite grout, necessary for the work. 1.1.9 Monitoring Well Development Payment for monitoring well development will be made by the hour. Payment will include compensation for pumping, surging, bailing, sample photograph, discharge water containers, and disposal.




Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号