SANS 10120Intro-2-1986 南非国家标准局 土木工程和合同文件标准规范的使用守则.第二部分:项目规划单简介
SOUTH APRICAN BUREAU OF STANDARDS CODE OF PRACTICE FOR USE WITH STANDARDIZED SPECIFICATIONS FOR CIVIL ENGINEERING CONSTRUCTION AND CONTRACT DOCUMENTS PART 2 : PROJECT SPECIFICATION INTRODUCTION
This part of the code covers the preparation under various circumstances of the two portions of a project specification, namely Portion 1, which covers tlin description of the works and includes general matters affecting the project (see Subclause 3.1 of Part. 1 of the code) and Portion 2, which covers variations and additions to the standardized specifications that form part of a contract (see Subclause 3.2 of Part 1 of the code).
2 This section of this part, of the code covers
a) a means of establishing the status of the project specification in relation to other specifications in a contract document;
b) the requirements that have to be stated in Portion .1. in order to identify and locate the works; and
c) quittance on the preparation of Portion ?.
3 The succeeding sections of this part of the code cover details of essential, optional and additional clauses that, are (or may be) required in respect of each applicable standardized specification.
NOTE
a) The number and title of the standardized specification covered by each succeeding section of this part of the code are given at the beginning of the applicable section, the sections being set out in alphabetical order, and the title of the applicable standardized specification is given in the top outer corner of each succeeding page of the section.
b) The clause/subclause number(n) given in brackets at the beginning or after the heading (see 6.1) of a clause or subclause in the succeeding sections is/are, unless otherwise stated, the number(s) of the relevant clause(sj or subclause(s) of the applicable specification.