Resource control protocol No. 3 Protocols at the Rw interface between a policy decision physical entity (PD-PE) and a policy enforcement physical entity (PE-PE): Diameter Study Group 11
This Recommendation provides the stage 3 specification of the protocol at the interface between policy decision physical entities (PD-PE) and policy enforcement physical entity (PE-PE). The functional requirements and the stage 2 specificationsfor this interface are contained in clause 8.2 of [ITU-T Y.2111] and in [b-ITU-T Q-Sup.51].