ITU-T M.1540 FRENCH-1994
输电系统计划停电信息的交换.维护:番号和信息交换(研究组4)共7页

EXCHANGE OF INFORMATION FOR PLANNED OUTAGES OF TRANSMISSION SYSTEMS


ITU-T M.1540 FRENCH-1994 发布历史

Planned outages of transmission systems are required to allow planned work to be done with the minimum impairement to the service concerned.All tests,measurements,rearrangements,etc.,which are not attributed directly to a failure - and are known in advance-are considered to be planned work.Such work will include installation of new equipment,routine maintenance,work on power supply equipment and in some cases, work for the clearance of faults which at first could only be remedied provisionally (mainly cable faults).In the event of planned work which results in the complete or partial interruption in a transmission system,efforts are at first made to reroute the telecommunication traffic as required.If special restoration plans exist for cases of faults,these pians can also be used in the event of planned outages.Should rerouting be impossible,planned work is generally carried out during periods of light traffic,e.g. at night.To allow appropriate measures to be taken,all stations affected by the planned outage must be informed in good time.

ITU-T M.1540 FRENCH-1994由国际电信联盟 IX-ITU 发布于 1994。

ITU-T M.1540 FRENCH-1994 在中国标准分类中归属于: M19 通信网设备互通技术要求和通信网接口。

ITU-T M.1540 FRENCH-1994 发布之时,引用了标准

  • ITU-T M.1014 传输维修点(国际线) -维护国际电报,电传真及租用线路-维护国际公共电话网-海事卫星的维修和数据传输

ITU-T M.1540 FRENCH-1994的历代版本如下:

  • 1994年 ITU-T M.1540 FRENCH-1994 输电系统计划停电信息的交换.维护:番号和信息交换(研究组4)共7页

 

 

非常抱歉,我们暂时无法提供预览,您可以试试: 免费下载 ITU-T M.1540 FRENCH-1994 前三页,或者稍后再访问。

点击下载后,生成下载文件时间比较长,请耐心等待......

 



标准号
ITU-T M.1540 FRENCH-1994
发布日期
1994年
实施日期
废止日期
中国标准分类号
M19
发布单位
IX-ITU
引用标准
ITU-T M.1014
适用范围
Planned outages of transmission systems are required to allow planned work to be done with the minimum impairement to the service concerned.All tests,measurements,rearrangements,etc.,which are not attributed directly to a failure - and are known in advance-are considered to be planned work.Such work will include installation of new equipment,routine maintenance,work on power supply equipment and in some cases, work for the clearance of faults which at first could only be remedied provisionally (mainly cable faults).In the event of planned work which results in the complete or partial interruption in a transmission system,efforts are at first made to reroute the telecommunication traffic as required.If special restoration plans exist for cases of faults,these pians can also be used in the event of planned outages.Should rerouting be impossible,planned work is generally carried out during periods of light traffic,e.g. at night.To allow appropriate measures to be taken,all stations affected by the planned outage must be informed in good time.




Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号