IEC 62055-31:2005
电度表.支付系统.第31部分:特殊要求.电度表用固定支付系统(级别1和2)

Electricity metering - Payment systems - Part 31: Particular requirements - Static payment meters for active energy (classes 1 and 2)


 

 

非常抱歉,我们暂时无法提供预览,您可以试试: 免费下载 IEC 62055-31:2005 前三页,或者稍后再访问。

点击下载后,生成下载文件时间比较长,请耐心等待......

 



标准号
IEC 62055-31:2005
发布
2005年
发布单位
国际电工委员会
替代标准
IEC 62055-31:2005/COR1:2007
当前最新
IEC 62055-31:2022
 
 
引用标准
IEC 60050-300:2001 IEC 61358:1996 IEC 62051:1999 IEC 62052-11:2003 IEC 62053-21:2003
被代替标准
IEC 13/1319/CDV:2004 IEC 13/1344/FDIS:2005
适用范围
This part of IEC 62055 applies to newly manufactured, static watt-hour payment meters of accuracy classes 1 and 2 for direct connection, for the measurement of alternating current electrical energy consumption of a frequency in the range 45 Hz to 65 Hz that include a load switch for the purpose of interruption or restoration of the electricity supply to the load in accordance with the current value of the available credit maintained in the payment meter. It does not apply to static watt-hour payment meters where the voltage across the connection terminals exceeds 600 V (line-to-line voltage for meters for polyphase systems). It applies to payment meters for indoor application only, where the payment meter shall be mounted as for normal service (i.e. together with a specified matching socket where applicable). Payment meters are implementations where all the main functional elements are incorporated in a single enclosure, together with any specified matching socket. There are also multi-part installations where the various main functional elements, such as the measuring element, the user interface unit, token carrier interface, and the load switch are implemented in more than one enclosure, involving additional interfaces. This part of IEC 62055 does not apply to multi-part payment metering installations. Functional requirements that apply to payment meters are also defined in this part of IEC 62055, and include informative basic functional requirements and tests for the prepayment mode of operation in Annex A. Allowances are made for the relatively wide range of features, options, alternatives, and implementations that may be found in practice. The diverse nature and functionality of payment meters prevent the comprehensive specification of detailed test methods for all of these requirements. However, in this case, the requirements are stated in such a way that tests can then be formulated to respect and validate the specific functionality of the payment meter being tested. This part of IEC 62055 does not cover specific functionality or performance requirements for safety, circuit protection, isolation or similar purposes that may be specified through reference to other specifications or standards. This part of IEC 62055 does not cover software requirements. Software requirements for basic energy meter metrology are under consideration for the IEC 62059 series of standards, and in other organisations. This part of IEC 62055 covers type-testing requirements only. For acceptance testing, the concepts given in IEC 61358 may be used as a basic guideline. Dependability aspects are addressed in the IEC 62059 series of standards. This part of IEC 62055 does not cover conformity tests and system compliance tests that may be required in connection with legal or other requirements of some markets.

IEC 62055-31:2005相似标准


推荐


谁引用了IEC 62055-31:2005 更多引用





Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号