5.1 Because there are a number of choices in this test method that depend on different applications and system configurations, it is the responsibility of the user of this test method to specify the details and protocol of an individual system power measurement prior to the beginning of a measurement.
5.2 Unlike device-level measurements that report performance at a fixed device temperature of 25°C, such as Test Methods E1036, this test method uses regression to a reference ambient air temperature.
5.2.1 System power values calculated using this test method are therefore much more indicative of the power a system actually produces compared with reporting performance at a relatively cold device temperature such as 25°C.
5.2.2 Using ambient temperature reduces the complexity of the data acquisition and analysis by avoiding the issues associated with defining and measuring the device temperature of an entire photovoltaic system.
5.2.3 The user of this test method must select the time period over which system data are collected, and the averaging interval for the data collection within the constraints of 8.3.
5.2.4 It is assumed that the system performance does not degrade or change during the data collection time period. This assumption influences the selection of the data collection period because system performance can have seasonal variations.
5.3 The irradiance shall be measured in the plane of the modules under test. If multiple planes exist (particularly in the case of rolling terrain), then the plane or planes in which irradiance measurement will occur must be reported with the test results. In the case where this test method is to be used for acceptance testing of a photovoltaic system or reporting of photovoltaic system performance for contractual purposes, the plane or planes in which irradiance measurement will occur must be agreed upon by the parties to the test prior to the start of the test.
5.3.1 The linear regression results will be most reliable when the measured irradiance, ambient temperature, and wind speed data during the data collection period are distributed around the reporting conditions. When this is not the case, the reported power will be an extrapolation to the reporting conditions.
5.4 Accumulation of dirt (soiling) on the photovoltaic modules can have a significant impact on the system rating. The user of this test may want to eliminate or quantify the level of soiling on the modules prior to conducting the test.
5.5 Repeated regression calculations on the same system to the same RC and using the same type of irradiance measurement device over successive data collection periods can be used to monitor performance changes as a function of time.
5.6 Capacity determinations are power measurements and are adequate to demonstrate system completeness. However, a single ca......
报告期内,公司紧紧抓住国内两大电网公司的战略规划,一是完善国网 2022版大存储集中器、智能变配电站房综合监控平台、变配电站房AI智能网关;二是着力开展低压分布式光伏用户智能并网开关及系统、变配电站房可视化系统、红外热成像测温装置及 APP、全自动智能周转柜以及消费信息采集设备等新技术开发;三是积极参与行业协会组织的《基于智能量测的低压分布式光伏接入电网技术规范》、《低压分布光伏防孤岛安全监测模块技术规范...
另外,新型终端采用“云管边端”的智慧物联体系架构,接入了配电自动化系统、用电信息采集系统、物联管理平台,在满足远程抄表、精准时钟管理、远程费控、低压配网运行状态监测、电能质量综合治理需求的基础上,兼容低压智能开关、光伏逆变器、充电桩智能控制器、无功补偿装置等营配感知设备,并具备光伏电站实时监测控制、可开放容量分析等功能。...
c) 使用瞬态或稳态太阳光模拟器进行标准测试条件下的性能测量时,电池的温度应按标准要求监控并能控制在规定的温度条件内。d) 进行光伏组件的热循环试验和湿冻试验的环境试验箱的温度变化速率应在实际负荷运行条件下满足标准规定的要求。e) 对于聚光型光伏组件,在户外进行电流电压性能测试时,测试装置应具有能使被测组件对准太阳光的双轴太阳跟踪系统。...
专家组在听取了开发组成员的技术工作总结、检测、查新等报告,查看了产品后,经讨论认为这六项新产品提交评审的技术文件齐全、规范,符合评审要求,符合鉴定要求,可以指导批量生产,各项性能指标均符合国际或国内标准要求;产品生产工艺成熟,制造设备先进,检测手段齐备,公司已取得ISO9001质量管理体系等四位一体的管理体系认证,质量保证体系健全,能够满足批量生产的条件。 ...
Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号