(a) The application must contain a final safety analysis report that describes the facility, presents the design bases and the limits on its operation, and presents a safety analysis of the structures, systems, and components of the facility as a whole. The final safety analysis report shall include the following information, at a level of information sufficient to enable the Commission to reach a final conclusion on all safety matters that must be resolved by the Commission before issuance of a combined license.
CFR 10-52.79-2013由US-CFR-file 发布于 2013-06-20,并于 2013-06-20 实施。
非常抱歉,我们暂时无法提供预览,您可以试试: 免费下载 CFR 10-52.79-2013 前三页,或者稍后再访问。
点击下载后,生成下载文件时间比较长,请耐心等待......
Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号