CFR 32-989.20-2014
国防. 第989部分:环境影响分析的过程(eiap). 第989.20节:EIS终稿.

National defense. Part989:Environmental impact analysis process (eiap). Section989.20:Final eis.


 

 

非常抱歉,我们暂时无法提供预览,您可以试试: 免费下载 CFR 32-989.20-2014 前三页,或者稍后再访问。

如果您需要购买此标准的全文,请联系:

点击下载后,生成下载文件时间比较长,请耐心等待......

 

标准号
CFR 32-989.20-2014
发布日期
2014年06月20日
实施日期
2014年06月20日
废止日期
发布单位
US-CFR-file
适用范围
(a) If changes in the draft EIS are minor or limited to factual corrections and responses to comments, the proponent and EPF may, with the prior approval of HQ USAF/A7CI and SAF/ IEI, prepare a document containing only comments on the Draft EIS, Air Force responses, and errata sheets of changes staffed to the HQ USAF ESOHC for coordination. However, the EPF must submit the Draft EIS and all of the above documents, with a new cover sheet indicating that it is a final EIS (40 CFR 1503.4(c)), to HQ USAF/ A7CI for filing with the EPA (40 CFR 1506.9). If more extensive modifications are required, the EPF must prepare a preliminary final EIS incorporating these modifications for coordination within the Air Force.




Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号