IECQ 03-8-2018
IEC电子元器件质量评定体系 (IECQ体系). 程序规则. 第8部分: 发光二极管 (LED) 照明的IECQ方案

IEC Quality Assessment System for Electronic Components (IECQ System) - Rules of Procedure - Part 8: IECQ Scheme for LED Lighting


IECQ 03-8-2018 发布历史

This publication contains the Rules of Procedure for the IECQ Scheme for LED Component Products Certification, which also includes other Solid-State Lighting (SSL) technologies. While this document refers to the IECQ Scheme for LED Component Products, it is intended that it includes other types of SSL technologies, including LED and OLED, from here on throughout the document referred to as LED lighting. NOTE LED is a technology and OLED is another. Perhaps in the future "PLED" may be common, i.e. a plastic or "printed LED". The IECQ Scheme for LED Component Products covers electronic components, associated materials and assemblies (including modules) for use within SSL application. These IECQ Scheme for LED Component Products Rules of Procedure are to be used in conjunction with applicable IECQ System management Basic Rules (IEC CA 01, IECQ 01-S), General Rules of Procedure (IECQ 03-1). This publication is based on the general Rules of Procedures for the Approved Component Scheme (IECQ 03-3) and includes changes or additions that relate specifically to the LED lighting industry, as such this publication takes precedence over IECQ 03-3. This publication may also be supplemented by IECQ Operational Documents (OD) as approved for use by the IECQ Management Committee, see www.iecq.org for latest publications.

IECQ 03-8-2018由国际电工委员会 IX-IEC 发布于 2018-0501。

IECQ 03-8-2018 在中国标准分类中归属于: L10 电子元件综合,在国际标准分类中归属于: 29.140.99 有关灯的其他标准。

IECQ 03-8-2018 发布之时,引用了标准

  • IECQ 01-S-2017 
  • IECQ 02-2013 IEC电子元器件质量评定体系 (IECQ体系). 程序规则. IECQ体系验收IECQ认证机构用通用要求*2013-05-01 更新
  • IECQ 03-1-2012 电子元器件的IEC质量评价体系(IECQ体系).程序规则.第1部分:全部IECQ计划的通用要求*2012-09-01 更新
  • IECQ 03-3-2013 电子元器件的IEC质量评价体系(IECQ体系).程序规则.第3部分:IECQ批准的元件产品,相关材料和组装件计划*2013-02-01 更新
  • IEC CA 01-2017 IEC合格评定系统.基本规则
  • ISO 9001-2015 质量管理系统.要求*2015-09-01 更新
  • ISO/IEC 17000-2004 合格评定.词汇和一般原则*2004-11-01 更新
  • ISO/IEC 17007-2009 合格评定.适于合格评定使用的标准化文件起草指南*2009-09-01 更新
  • ISO/IEC 17021-1-2015 一致性评估.提供管理体系审核与认证机构的要求.第1部分:要求*2015-06-01 更新
  • ISO/IEC 17021-2-2016 合格评定.提供审核和管理体系认证的机构的要求.第2部分:环境管理体系审核和认证的能力要求*2016-12-01 更新
  • ISO/IEC 17021-3-2017 合格评定.提供审核和管理体系认证机构的要求.第3部分:质量管理体系审核和认证的能力要求*2017-03-01 更新
  • ISO/IEC 17025-2017 测试和校准实验室能力的一般要求*2017-11-29 更新
  • ISO/IEC 17050-1-2004 合格评定 供方的符合性声明 第1部分:通用要求*2004-10-01 更新
  • ISO/IEC 17065-2012 合格评定.组织机构认证产品要求,流程和服务*2012-09-01 更新

* 在 IECQ 03-8-2018 发布之后有更新,请注意新发布标准的变化。

IECQ 03-8-2018的历代版本如下:

  • 1970年01月 IECQ 03-8-2018 IEC电子元器件质量评定体系 (IECQ体系). 程序规则. 第8部分: 发光二极管 (LED) 照明的IECQ方案

 

 

非常抱歉,我们暂时无法提供预览,您可以试试: 免费下载 IECQ 03-8-2018 前三页,或者稍后再访问。

点击下载后,生成下载文件时间比较长,请耐心等待......

 



标准号
IECQ 03-8-2018
发布日期
1970年01月
实施日期
废止日期
中国标准分类号
L10
国际标准分类号
29.140.99
发布单位
IX-IEC
引用标准
IECQ 01-S-2017 IECQ 02-2013 IECQ 03-1-2012 IECQ 03-3-2013 IEC CA 01-2017 IECQ OD 010 IECQ OD 013 IECQ OD 302 ISO 9001-2015 ISO/IEC 17000-2004 ISO/IEC 17007-2009 ISO/IEC 17021-1-2015 ISO/IEC 17021-2-2016 ISO/IEC 17021-3-2017 ISO/IEC 17025-2017 ISO/IEC 17050-1-2004 ISO/IEC 17065-2012
被代替标准
IECQ 03-8-2015
适用范围
This publication contains the Rules of Procedure for the IECQ Scheme for LED Component Products Certification, which also includes other Solid-State Lighting (SSL) technologies. While this document refers to the IECQ Scheme for LED Component Products, it is intended that it includes other types of SSL technologies, including LED and OLED, from here on throughout the document referred to as LED lighting. NOTE LED is a technology and OLED is another. Perhaps in the future "PLED" may be common, i.e. a plastic or "printed LED". The IECQ Scheme for LED Component Products covers electronic components, associated materials and assemblies (including modules) for use within SSL application. These IECQ Scheme for LED Component Products Rules of Procedure are to be used in conjunction with applicable IECQ System management Basic Rules (IEC CA 01, IECQ 01-S), General Rules of Procedure (IECQ 03-1). This publication is based on the general Rules of Procedures for the Approved Component Scheme (IECQ 03-3) and includes changes or additions that relate specifically to the LED lighting industry, as such this publication takes precedence over IECQ 03-3. This publication may also be supplemented by IECQ Operational Documents (OD) as approved for use by the IECQ Management Committee, see www.iecq.org for latest publications.

IECQ 03-8-2018系列标准





Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号