GB/T 39334.2-2020 Digital simulation of mechanical products manufacturing process—Part 2: Requirements of production line planning and layout simulation
This part of GB/T39334 stipulates the general requirements and basic process of production line planning and layout simulation in the manufacturing process of mechanical products, as well as the detailed requirements of simulation scheme formulation, simulation model construction, simulation operation analysis, result evaluation and optimization. This part applies to the application, development, service and research related to production line planning and layout simulation in the manufacturing process of mechanical products.
GB/T 39334.2-2020 history
2020GB/T 39334.2-2020 Digital simulation of mechanical products manufacturing process—Part 2: Requirements of production line planning and layout simulation