GB/T 21412.3-2009
Petroleum and natural gas industries.Design and operation of subsea production systems.Part 3:Through flowline(TFL)systems (English Version)

GB/T 21412.3-2009
Standard No.
GB/T 21412.3-2009
Language
Chinese, Available in English version
Release Date
2009
Published By
General Administration of Quality Supervision, Inspection and Quarantine of the People‘s Republic of China
Latest
GB/T 21412.3-2009
Scope
This part of GB/T 21412 specifies the requirements for the design, manufacture and operation of the flowline (TFL) system and equipment, and gives corresponding recommended practices. The procedures and requirements involved in this section are applicable to hydraulic operations of downhole equipment, subsea trees, tubing hangers, and flowlines (including in-line equipment). This part mainly describes the application of TFL system in offshore and underwater, but it can also be used in other occasions, such as highly deviated wells and horizontal wells. This section does not involve underwater separation, pressurization, metering and downhole pumping.

GB/T 21412.3-2009 Referenced Document

  • API RP 14E RECOMMENDED PRACTICE FOR DESIGN AND INSTALLATION OF OFFSHORE PRODUCTION PLATFORM PIPING SYSTEMS FOURTH EDITION
  • API Std 1104 Welding of Pipelines and Related Facilities (TWENTY-SECOND EDITION)*2021-07-01 Update
  • ISO 11960 Petroleum and natural gas industries — Steel pipes for use as casing or tubing for wells*2020-03-31 Update
  • ISO 13628-4:1999 Petroleum and natural gas industries - Design and operation of subsea production systems - Part 4: Subsea wellhead and tree equipment
  • ISO 3183-1 Petroleum and natural gas industries - Steel pipe for pipelines - Technical delivery conditions - Part 1: Pipes of requirement class A

GB/T 21412.3-2009 history

  • 2009 GB/T 21412.3-2009 Petroleum and natural gas industries.Design and operation of subsea production systems.Part 3:Through flowline(TFL)systems

GB/T 21412.3-2009 -All Parts

GB/T 21412.1-2010 Petroleum and natural gas industries.Design and operation of subsea production systems.Part 1:General requirements and recommendations GB/T 21412.10-2019 Petroleum and natural gas industries—Design and operation of subsea production systems—Part 10: Specification for bonded flexible pipe GB/T 21412.11-2019 Petroleum and natural gas industries—Design and operation of subsea production systems—Part 11:Recommended practice for flexible pipe GB/T 21412.15-2017 Petroleum and natural gas industries—Design and operation of subsea production systems—Part15:Subsea structures and manifolds GB/T 21412.2-2022 Petroleum and natural gas industries—Design and operation of subsea production systems—Part 2:Unbonded flexible pipe systems for subsea and marine applications GB/T 21412.3-2009 Petroleum and natural gas industries.Design and operation of subsea production systems.Part 3:Through flowline(TFL)systems GB/T 21412.4-2013 Petroleum and natural gas industries.Design and operation of subsea production systems.Part 4: Subsea wellhead and tree equipment GB/T 21412.5-2017 Petroleum and natural gas industries—Design and operation of subsea production systems—Part 5: Subsea umbilicals GB/T 21412.6-2018 Petroleum and natural gas industries—Design and operation of subsea production systems—Part 6:Subsea production control systems GB/T 21412.7-2018 Petroleum and natural gas industries—Design and operation of subsea production systems—Part 7:Completion/workover riser systems GB/T 21412.8-2010 Petroleum and natural gas industries.Design and operation of subsea production systems.Part 8:Remotely Operated Vehicle(ROV) interfaces on subsea production systems GB/T 21412.9-2009 Petroleum and natural gas industries.Design and operation of subsea production systems.Part 9:Remotely Operated Tool(ROT) intervention systems



Copyright ©2007-2023 ANTPEDIA, All Rights Reserved