This standard applies to the determination of the drying time of paint films and putty films. Under the specified drying conditions, the time for surface film formation is the surface dry time; the time for all solid coating films to be formed is the actual drying time. Expressed in hours or minutes.
GB/T 1728-1979 history
2020GB/T 1728-2020 Determination of drying time of coating and putty films
1979GB/T 1728-1979 Methods of test for drying time of coatings of paints and putties