ZH

RU

ES

preparative column semi-preparative

preparative column semi-preparative, Total:500 items.

In the international standard classification, preparative column semi-preparative involves: Medical equipment, Semiconductor devices, Meat, meat products and other animal produce, Soil quality. Pedology, Wastes, Electromechanical components for electronic and telecommunications equipment, Safety of machinery, Industrial automation systems, Electrical engineering in general, Electronic display devices, Switchgear and controlgear, Linear and angular measurements, Mechanical testing, Fasteners, Plant and equipment for the food industry, Air quality, Printed circuits and boards, Leather technology, Electrical accessories, Graphical symbols, Welding, brazing and soldering, Equipment for processing of minerals, Power transmission and distribution networks, Rubber and plastics products, Aerospace electric equipment and systems, Products of the chemical industry, Fuels, Components for electrical equipment, Geology. Meteorology. Hydrology, Refrigerating technology, Edible oils and fats. Oilseeds, Laundry appliances, Kitchen equipment, Shop fittings, Equipment for the metallurgical industry, Shipbuilding and marine structures in general, Fluid storage devices, Burners. Boilers, Testing of metals, Metalliferous minerals, Materials and components for railway engineering, Fertilizers, Cereals, pulses and derived products, Equipment for petroleum and natural gas industries, Fibre optic communications, Installations in buildings, Inorganic chemicals, Machine tool systems, Equipment for the chemical industry, Analytical chemistry, Lamps and related equipment, Interface and interconnection equipment, Telecommunication systems, Paints and varnishes, Refractories, Plastics, Products of non-ferrous metals, Coals, Raw materials for rubber and plastics, Rubber, Construction materials, Ferrous metals, Pharmaceutics, Quality, Aircraft and space vehicles in general, Protection against dangerous goods, Integrated circuits. Microelectronics, Protection against fire, Pipeline components and pipelines, Document imaging applications, Biology. Botany. Zoology, Milk and milk products, Vocabularies, Equipment for the rubber and plastics industries, Woodworking equipment, Power stations in general, Microbiology.


Aerospace Industries Association, preparative column semi-preparative

  • AIA NA 0201-1985 Post, Electrical- Mechanical Equipment, Stud Type, Metric
  • AIA NA 0201-0204-1985 Post, Electrical- Mechanical Equipment, Stud Type, Metric
  • AIA NA 0202-1985 Post, Electrical- Mechanical Equipment, Stud Type, Metric
  • AIA NA 0203-1985 Post, Electrical- Mechanical Equipment, Stud Type, Metric
  • AIA NA 0204-1985 Post, Electrical- Mechanical Equipment, Stud Type, Metric
  • AIA NA 0211-1987 Post, Electrical- Mechanical Equipment, Swage Type, Metric (Rev. 1)
  • AIA NA 0212-1987 Post, Electrical- Mechanical Equipment, Swage Type, Metric (Rev. 1)
  • AIA NA 0213-1987 Post, Electrical- Mechanical Equipment, Swage Type, Metric (Rev. 1)
  • AIA NA 0221-1985 Post, Electrical - Mechanical Equipment, Internal Thread Type, Metric R(1987)
  • AIA NA 0221-0224-1985 Post, Electrical - Mechanical Equipment, Internal Thread Type, Metric R(1987)
  • AIA NA 0222-1985 Post, Electrical - Mechanical Equipment, Internal Thread Type, Metric R(1987)
  • AIA NA 0223-1985 Post, Electrical - Mechanical Equipment, Internal Thread Type, Metric R(1987)
  • AIA NA 0224-1985 Post, Electrical - Mechanical Equipment, Internal Thread Type, Metric R(1987)
  • AIA NA 0211-0213-1987 Post, Electrical- Mechanical Equipment, Swage Type, Metric Rev. 1; Supersedes NA 0211-0212
  • AIA NA 0165-1989 (Inactive)Post, Electrical- Mechanical Equipment Swage Type, Metric (Rev. 2) (See NA 0213)

Group Standards of the People's Republic of China, preparative column semi-preparative

  • T/CAAP 021-2022 Additive manufacturing spinal orthosis for scoliosis curve-correction
  • T/SDEPI 036-2023 Full/semi-automatic soil sample preparation method
  • T/ZJATA 0017-2023 Chemical vapor deposition (CVD) epitaxy equipment for preparing silicon carbide semiconductor materials
  • T/CEEIA 357-2019 Pressure controller for refrigeration equipment
  • T/CAAP 022-2022 Additive manufacturing customized orthotic insole
  • T/QGCML 892-2023 Plasma Chemical Vapor Deposition Optical Fiber Preform Preparation Equipment
  • T/DZJN 134-2023 Guidelines for Remanufacturing of Refrigeration and Air Conditioning Equipment
  • T/NXJX 020-2021 Technical requirements for foundry paint preparing equipment
  • T/DLQYLHH 007-2019 Preparation pump for liquid chromatography
  • T/QGCML 1710-2023 Tropifexor Preparation Technical Specifications
  • T/ZGM 014-2023 Technical specifications of degasification membrane products certification for ultrapure water in the semiconductor industry
  • T/SDHCST 003-2022 Specification of Quality management for stem cell-based products

YU-JUS, preparative column semi-preparative

AIA/NAS - Aerospace Industries Association of America Inc., preparative column semi-preparative

Korean Agency for Technology and Standards (KATS), preparative column semi-preparative

RU-GOST R, preparative column semi-preparative

  • GOST R 56579-2015 Semi-prepared meat-contained ground products for children nutrition. Specifications
  • GOST 31936-2012 Semi-prepared poultry meat and poultry offal. General specifications
  • GOST R 55790-2013 Semi-prepared ground of poultry meat for children nutrition. Specifications
  • GOST 30146-1995 Machines and equipment for production of sausage products and meat semi-finished products. General specifications
  • GOST IEC 60947-4-3-2014 Low-voltage switchgear and controlgear. Part 4-3. Contactors and motor starters. AC semiconductor controllers and contactors for non-motor loads
  • GOST IEC 60947-5-1-2014 Low-voltage switchgear and controlgear. Part 5-1. Control circuit devices and switching elements. Electromechanical control circuit devices
  • GOST R 52745-2007 Complex quality control system. Quality control for materials and semi-finished products used in the process of production of articles of aviation, space and defence equipment and double application equipment at enterprises-suppliers. General requirements
  • GOST R 52745-2021 Complex quality control system. Conformity assessment of materials, semi-finished products and other products used in the process of manufacture of products for aircraft and other civil, defense and dual use equipment at enterprises-suppliers. General req
  • GOST IEC 60947-6-2-2013 Low-voltage switchgear and controlgear. Part 6-2. Multiple function equipment. Control and protective switching devices (or equipment)
  • GOST R IEC 60715-2003 Low-voltage switchgear and controlgear. Mounting on rails for mechanical support of electrical devices in switchgear and controlgear installations
  • GOST 33338-2015 Semi-prepared ground ready-to-heat-and-eat of poultry meat for children nutrition. Specifications
  • GOST 13.1.403-1975 Reprography. Micrography. Microcopying equipment. Types
  • GOST 3622-1968 Milk and milk products. Sampling and preparation of samples for testing
  • GOST EN 1482-2-2013 Fertilizers and liming materials. Sampling and sample preparation. Part 2. Sample preparation.
  • GOST R 50030.6.2-2011 Low-voltage switchgear and controlgear. Part 6-2. Multiple function equipment. Control and protective switching devices (or equipment) (CPS)
  • GOST R IEC 61439-2-2012 Low-voltage switchgear and controlgear assemblies. Part 2. Power switchgear and controlgear assemblies

National Electrical Manufacturers Association(NEMA), preparative column semi-preparative

Aerospace Industries Association/ANSI Aerospace Standards, preparative column semi-preparative

Professional Standard - Machinery, preparative column semi-preparative

  • JB/T 11645-2013 Pulverization equipment of calcium carbide dreg for semi-dry flue gas desulphurization
  • JB/T 8754-2007 Organization of the types of high-voltage switchgear and controlgear
  • JB/T 6427-2001 PSA oxugen and nitrogen plants
  • JB/T 6427-2015 Pressure swing adsorption oxygen and nitrogen production equipment
  • JB/T 7249-1994 Terminology of refrigeration equipment
  • JB/T 9613-2013 Compilation of type for low-voltage switchgear and controlgear assemblies in ships
  • JB/T 5903-1996 Water electrolysis hydrogen production equipment
  • JB/T 7222-1994 Large ammonia ice making equipment

工业和信息化部, preparative column semi-preparative

  • SJ/T 11762-2020 Semiconductor equipment manufacturing information labeling requirements
  • SJ/T 11763-2020 Specification for human-machine interface for semiconductor manufacturing equipment
  • JB/T 13668-2019 Floor-type aggregate preparation equipment
  • JB/T 8754-2018 Methods for compiling models of high-voltage switchgear and control equipment

HU-MSZT, preparative column semi-preparative

国家市场监督管理总局、中国国家标准化管理委员会, preparative column semi-preparative

  • GB/T 36646-2018 Equipment for preparation of nitride semiconductor materials by hydride vapor phase epitaxy
  • GB/T 39714.2-2020 Plastics—Polytetrafluoroethylene(PTFE) semi-finished products—Part 2:Preparation of test specimens and determination of properties

British Standards Institution (BSI), preparative column semi-preparative

  • BS EN 60204-33:2011 Safety of machinery. Electrical equipment of machines. Requirements for semiconductor fabrication equipment
  • BS EN IEC 62271-214:2019 High-voltage switchgear and controlgear. Internal arc classification for metal-enclosed pole-mounted switchgear and controlgear for rated voltages above 1 kV and up to and including 52 kV
  • 22/30430766 DC BS EN 60947-10. Low-voltage switchgear and controlgear - Part 10. Semiconductor Circuit-Breakers
  • BS 5424-2:1987 Low-voltage controlgear - Specification for semiconductor contactors (solid state contactors)
  • BS EN 62026-7:2013 Low-voltage switchgear and controlgear. Controller-device interfaces (CDIs). CompoNet
  • BS EN 62026-3:2015+A11:2020 Low-voltage switchgear and controlgear. Controller-device interfaces (CDIs) - DeviceNet
  • BS EN 60947-4-2:2012 Low-voltage switchgear and controlgear. Contactors and motor-starters. AC semiconductor motor controllers and starters
  • BS EN IEC 60947-4-2:2023 Low-voltage switchgear and controlgear - Contactors and motor-starters. Semiconductor motor controllers, starters and soft-starter
  • BS EN 62271-1:2017+A1:2021 High-voltage switchgear and controlgear - Common specifications for alternating current switchgear and controlgear
  • BS EN 60974-6:2011 Arc welding equipment. Limited duty equipment
  • BS EN 60974-6:2016 Arc welding equipment. Limited duty equipment
  • 18/30383448 DC BS EN 60947-4-3. Low-voltage switchgear and controlgear. Part 4-3. Contactors and motor-starters. Semiconductor controllers and semiconductor contactors for non-motor loads
  • 18/30375223 DC BS EN 60947-4-3. Low-voltage switchgear and controlgear. Part 4-3. Contactors and motor-starters. Semiconductor controllers and semiconductor contactors for non-motor loads
  • BS EN ISO 13000-2:2006 Plastics - Polytetrafluoroethylene (PTFE) semi-finished products - Preparation of test specimens and determination of properties
  • BS EN 60947-5-1:2004+A1:2009 Low-voltage switchgear and controlgear — Part 5-1: Control circuit devices and switching elements — Electromechanical control circuit devices
  • PD CEN/TS 17702-2:2022 Plant biostimulants. Sampling and sample preparation. Sample preparation
  • BS EN 60947-6-2:2003 Low-voltage switchgear and controlgear - Multiple function equipment - Control and protective switching devices (or equipment) (CPS)
  • BS EN IEC 60947-6-2:2023 Low-voltage switchgear and controlgear - Multiple function equipment. Control and protective switching devices (or equipment) (CPS)
  • BS EN 1482-2:2007 Fertilizers and liming materials - Sampling and sample preparation - Sample preparation
  • BS EN 60947-4-3:2000+A2:2011 Low-voltage switchgear and controlgear. Contactors and motor-starters. AC semiconductor controllers and contactors for non-motor loads
  • BS EN 60947-4-3:2014 Low-voltage switchgear and controlgear. Contactors and motor-starters. AC semiconductor controllers and contactors for non-motor loads
  • BS EN 61439-2:2009 Low-voltage switchgear and controlgear assemblies - Power switchgear and controlgear assemblies
  • BS EN 61439-2:2011 Low-voltage switchgear and controlgear assemblies. Power switchgear and controlgear assemblies
  • BS EN 61439-2:2010 Low-voltage switchgear and controlgear assemblies. Power switchgear and controlgear assemblies
  • BS EN IEC 61439-2:2021 Tracked Changes. Low-voltage switchgear and controlgear assemblies. Power switchgear and controlgear assemblies
  • 21/30434337 DC BS EN IEC 62271-214. High-voltage switchgear and controlgear - Part 214. Internal arc classification for metal-enclosed pole-mounted switchgear and controlgear for rated voltages above 1 kV and up to and including 52 kV
  • BS 4559-4:2000 Methods for preparation of calibration gas mixtures - Certificate of mixture preparation
  • BS EN 62026-3:2015 Low-voltage switchgear and controlgear. Controller-device interfaces (CDIs). DeviceNet
  • BS EN 62026-3:2009 Low-voltage switchgear and controlgear - Controller-device interfaces (CDIs) - DeviceNet
  • PD ISO/TR 20580:2022 Preparation of metallographic specimens
  • PD CLC IEC/TR 63216:2020 Low-voltage switchgear and controlgear. Electromagnetic compatibility assessment for switchgear and controlgear and their assemblies
  • BS EN IEC 62026-1:2019 Tracked Changes. Low-voltage switchgear and controlgear. Controller-device interfaces (CDIs). General rules
  • BS EN 61439-1:2009 Low-voltage switchgear and controlgear assemblies - General rules
  • BS EN 61439-1:2011 Low-voltage switchgear and controlgear assemblies. General rules
  • BS EN 61439-1:2010 Low-voltage switchgear and controlgear assemblies. General rules
  • BS ISO/IEC 29341-30-2:2017 Information technology. UPnP Device Architecture. IoT management and control device control protocol. IoT management and control device
  • BS ISO 21927-9:2012 Smoke and heat control systems. Specification for control equipment
  • BS EN 45510-2-7:2002 Guide for the procurement of power station equipment - Electrical equipment - Switchgear and controlgear
  • 19/30393690 DC BS EN 61439-2. Low-voltage switchgear and controlgear assemblies. Part 2. Power switchgear and controlgear assemblies
  • 18/30386670 DC BS EN 61439-2. Low-voltage switchgear and controlgear assemblies. Part 2. Power switchgear and controlgear assemblies

German Institute for Standardization, preparative column semi-preparative

  • DIN 46202:1987-06 Terminal studs for switchgear and controlgear, instrument transformers and surge arresters of 52 kV and above
  • DIN 23011-5:2006 Preparation of hard coal - Preparation plants - Part 5: Process control
  • DIN 2107:1986 Office machines; character families for textpreparation equipment
  • DIN EN 60947-4-2:2007 Low-voltage switchgear and controlgear - Part 4-2: Contactors and motor-starters - AC semiconductor motor controllers and starters (IEC 60947-4-2:1999 + A1:2001 + A2:2006); German version EN 60947-4-2:2000 + A1:2002 + A2:2006
  • DIN EN 61439-2:2012 Low-voltage switchgear and controlgear assemblies - Part 2: Power switchgear and controlgear assemblies (IEC 61439-2:2011); German version EN 61439-2:2011
  • DIN 51701-3:2006 Testing of solid fuels - Sampling and sample preparation - Part 3: Sample preparation
  • DIN 51701-3:2006-09 Testing of solid fuels - Sampling and sample preparation - Part 3: Sample preparation
  • DIN 43656:1979 Indoor switchgear and controlgear assemblies and high-voltage switchgear and controlgear up to 36 kV; colouring
  • DIN EN 17702-2:2023 Plant biostimulants - Sampling and sample preparation - Part 2: Sample preparation; German and English version prEN 17702-2:2023
  • DIN EN 1482-2:2007-04 Fertilizers and liming materials - Sampling and sample preparation - Part 2: Sample preparation; German version EN 1482-2:2007 / Note: To be replaced by DIN EN ISO 14820-2 (2019-01).
  • DIN EN 17702-2:2023-04 Plant biostimulants - Sampling and sample preparation - Part 2: Sample preparation; German and English version prEN 17702-2:2023 / Note: Date of issue 2023-03-17*Intended as replacement for DIN CEN/TS 17702-2 (2022-06).
  • DIN CEN/TS 17702-2:2022-06 Plant biostimulants - Sampling and sample preparation - Part 2: Sample preparation; German version CEN/TS 17702-2:2022

CH-SNV, preparative column semi-preparative

Building Officials and Code Administrators International(U.S.), preparative column semi-preparative

AENOR, preparative column semi-preparative

  • UNE 17083:1966 HALF EMBEDDED END STUDS. METRIC THREAD. SERIES A.
  • UNE 32102-2:1984 HARD COAL. SAMPLING AND SAMPLES PREPARATION. PART 2. SAMPLES PREPARATION.
  • UNE-EN 60947-4-2:2013 Low-voltage switchgear and controlgear - Part 4-2: Contactors and motor-starters - AC semiconductor motor controllers and starters
  • UNE-EN 61439-2:2012 Low-voltage switchgear and controlgear assemblies - Part 2: Power switchgear and controlgear assemblies
  • UNE 34600-2:1964 PREPARATION OF ESPARTO TEXTILE.
  • UNE 207007:2000 IN High-voltage switchgear and controlgear. The use of electronic and associated technologies in auxiliary equipment of switchgear and controlgear.
  • UNE-EN 62026-1:2008 Low-voltage switchgear and controlgear - Controller-device interfaces (CDIs) -- Part 1: General rules
  • UNE-EN 1482-2:2007 Fertilizers and liming materials - Sampling and sample preparation - Part 2: Sample preparation
  • UNE 21634:1997 EX HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR. USE AND HANDLING OF SULPHUR HEXAFLUORIDE (SF6) IN HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR.
  • UNE-EN 60947-6-2:2005 Low-voltage switchgear and controlgear -- Part 6-2: Multiple function equipment - Control and protective switching devices (or equipment) (CPS)

Danish Standards Foundation, preparative column semi-preparative

  • DS/EN 50013:1994 Low voltage switchgear and controlgear for industrial use - Terminal marking and distinctive number for particular control switches
  • DS/EN 60204-33:2011 Safety of machinery - Electrical equipment of machines - Part 33: Requirements for semiconductor fabrication equipment
  • DS/EN 50005:1994 Low voltage switchgear and controlgear for industrial use - Terminal marking and distinctive number - General rules
  • DS/EN 50036:1994 Low voltage switchgear and controlgear for industrial use - Inductive proximity switches - Form A,for alternating current, 2 terminals
  • DS/EN 50038:1994 Low voltage switchgear and controlgear for industrial use - Inductive proximity switches - Form D,for alternating current, 2 terminals
  • DS/EN 50040:1994 Low voltage switchgear and controlgear for industrial use - Inductive proximity switches - Form A,for direct current, 2 terminals
  • DS/EN 50042:1994 Low voltage switchgear and controlgear for industrial use - Terminal marking - Terminals for external associated electronic circuit components and contacts
  • DS/EN 60947-5-1/A1:2009 Low-voltage switchgear and controlgear - Part 5-1: Control circuit devices and switching elements - Electromechanical control circuit devices
  • DS/EN 60947-5-1:2004 Low-voltage switchgear and controlgear - Part 5-1: Control circuit devices and switching elements - Electromechanical control circuit devices
  • DS/EN 50008:1994 Low voltage switchgear and controlgear for industrial use - Inductive proximity switches - Form A, for direct current, 3 or 4 terminals
  • DS/EN 50025:1994 Low voltage switchgear and controlgear for industrial use - Inductive proximity switches - Form C, for direct current, 3 or 4 terminals
  • DS/EN 50026:1994 Low voltage switchgear and controlgear for industrial use - Inductive proximity switches - Form D, for direct current, 3 or 4 terminals
  • DS/EN 60947-4-2:2012 Low-voltage switchgear and controlgear - Part 4-2: Contactors and motor-starters - AC semiconductor motor controllers and starters
  • DS/EN 62026-3:2009 Low-voltage switchgear and controlgear - Controller-device interfaces (CDIs) - Part 3: DeviceNet
  • DS/EN 62026-7:2013 Low-voltage switchgear and controlgear - Controller-device interfaces (CDIs) - Part 7: CompoNet
  • DS/EN 60947-6-2/A1:2007 Low-voltage switchgear and controlgear - Part 6-2: Multiple function equipment - Control and protective switching devices (or equipment) (CPS)
  • DS/EN 60947-6-2:2004 Low-voltage switchgear and controlgear - Part 6-2: Multiple function equipment - Control and protective switching devices (or equipment) (CPS)
  • DS/EN 61439-2:2011 Low-voltage switchgear and controlgear assemblies - Part 2: Power switchgear and controlgear assemblies
  • DS/EN 61439-2:2009 Low-voltage switchgear and controlgear assemblies - Part 2: Power switchgear and controlgear assemblies
  • DS/ISO 4661:1979 Rubber — Preparation of test pieces
  • DS/EN IEC 61439-2:2021 Low-voltage switchgear and controlgear assemblies – Part 2: Power switchgear and controlgear assemblies
  • DS/EN 62026-1:2008 Low-voltage switchgear and controlgear - Controller-device interfaces (CDIs) - Part 1: General rules
  • DS/ISO 13000-2:2021 Plastics – Polytetrafluoroethylene (PTFE) semi-finished products – Part 2: Preparation of test specimens and determination of properties
  • DS/EN 62047-7:2011 Semiconductor devices - Micro-electromechanical devices - Part 7: MEMS BAW filter and duplexer for radio frequency control and selection
  • DS/EN 1482-2:2007 Fertilizers and liming materials - Sampling and sample preparation - Part 2: Sample preparation

International Electrotechnical Commission (IEC), preparative column semi-preparative

  • IEC 60204-33:2009 Safety of machinery - Electrical equipment of machines - Part 33: Requirements for semiconductor fabrication equipment
  • IEC 60947-4-3:2020 Low-voltage switchgear and controlgear - Part 4-3: Contactors and motor-starters - Semiconductor controllers and semiconductor contactors for non-motor loads
  • IEC 60947-5-1:1999 Low-voltage switchgear and controlgear - Part 5-1: Control circuit devices and switching elements - Electromechanical control circuit devices
  • IEC 60158-2:1982 Low-voltage controlgear. Part 2 : Semiconductor contactors (solid state contactors)
  • IEC 60848:1988 Preparation of function charts for control systems
  • IEC TS 61915:2003 Low-voltage switchgear and controlgear - Principles for the development of device profiles for networked industrial devices
  • IEC 62026-1:2019 RLV Low-voltage switchgear and controlgear - Controller-device interfaces (CDIs) - Part 1: General rules
  • IEC 60947-4-2/COR1:2002 Low-voltage switchgear and controlgear - Part 4-2: Contactors and motor-starters - AC semiconductor motor controllers and starters; Corrigendum 1
  • IEC 60947-4-2/AMD1/COR1:2002 Low-voltage switchgear and controlgear - Part 4-2: Contactors and motor-starters - AC semiconductor motor controllers and starters; Corrigendum 1
  • IEC 60947-4-2:2011 Low-voltage switchgear and controlgear - Part 4-2: Contactors and motor-starters - AC semiconductor motor controllers and starters
  • IEC 60947-6-2:2002+AMD1:2007 CSV Low-voltage switchgear and controlgear - Part 6-2: Multiple function equipment - Control and protective switching devices (or equipment) (CPS)
  • IEC 61439-2:2009 Low-voltage switchgear and controlgear assemblies - Part 2: Power switchgear and controlgear assemblies
  • IEC 61439-2:2011 Low-voltage switchgear and controlgear assemblies - Part 2: Power switchgear and controlgear assemblies
  • IEC 62271-1:2017+AMD1:2021 CSV High-voltage switchgear and controlgear - Part 1: Common specifications for alternating current switchgear and controlgear
  • IEC 60947-5-1:2016/COR2:2020 Corrigendum 2 - Low-voltage switchgear and controlgear - Part 5-1: Control circuit devices and switching elements - Electromechanical control circuit devices
  • IEC 60947-5-1:2016/COR1:2016 Corrigendum 1 - Low-voltage switchgear and controlgear - Part 5-1: Control circuit devices and switching elements - Electromechanical control circuit devices
  • IEC 62442-1:2022 RLV Energy performance of lamp controlgear - Part 1: Controlgear for fluorescent lamps - Method of measurement to determine the total input power of controlgear circuits and the efficiency of controlgear
  • IEC 62442-1:2018 RLV Energy performance of lamp controlgear - Part 1: Controlgear for fluorescent lamps - Method of measurement to determine the total input power of controlgear circuits and the efficiency of controlgear
  • IEC 62442-1:2022 Energy performance of lamp controlgear - Part 1: Controlgear for fluorescent lamps - Method of measurement to determine the total input power of controlgear circuits and the efficiency of controlgear
  • IEC 62271-1:2017 High-voltage switchgear and controlgear - Part 1: Common specifications for alternating current switchgear and controlgear
  • IEC TR 62063:1999 High-voltage switchgear and controlgear - The use of electronic and associated technologies in auxiliary equipment of switchgear and controlgear
  • IEC TR 63216:2019 Low-voltage switchgear and controlgear - Electromagnetic compatibility assessment for switchgear and controlgear and their assemblies
  • IEC 60947-4-2:2007 Low-voltage switchgear and controlgear - Part 4-2: Contactors and motor-starters - AC semiconductor motor controllers and starters
  • IEC 60947-4-2:2020 Low-voltage switchgear and controlgear – Part 4-2: Contactors and motor-starters – Semiconductor motor controllers, starters and soft-starters
  • IEC 60947-4-3:2011 Low-voltage switchgear and controlgear. Part 4-3: Contactors and motor-starters.AC semiconductor controllers and contactors for non-motor loads
  • IEC 62026-3:2014/COR2:2019 Corrigendum 2 - Low-voltage switchgear and controlgear - Controller-device interfaces (CDIs) - Part 3: DeviceNet
  • IEC 62435-2:2017 Electronic components - Long-term storage of electronic semiconductor devices - Part 2: Deterioration mechanisms
  • IEC 60947-6-2:2020/COR1:2021 Corrigendum 1 - Low-voltage switchgear and controlgear - Part 6-2: Multiple function equipment - Control and protective switching devices (or equipment) (CPS)
  • IEC 60947-6-2:2002 Low-voltage switchgear and controlgear - Part 6-2: Multiple function equipment; Control and protective switching devices (or equipment) (CPS)
  • IEC 60947-6-2:2007 Low-voltage switchgear and controlgear - Part 6-2: Multiple function equipment - Control and protective switching devices (or equipment) (CPS)
  • IEC 60947-6-2:2020 Low-voltage switchgear and controlgear - Part 6-2: Multiple function equipment - Control and protective switching devices (or equipment) (CPS)

Japanese Industrial Standards Committee (JISC), preparative column semi-preparative

  • JIS B 9960-33:2012 Safety of machinery -- Electrical equipment of machines -- Part 33: Requirements for semiconductor fabrication equipment
  • JIS K 6556-2:2016 Leather -- Sampling and preparation -- Sample preparation and conditioning
  • JIS K 6299:2001 Rubber -- Preparation of test pieces

ES-UNE, preparative column semi-preparative

  • UNE-EN 60204-33:2011 Safety of machinery - Electrical equipment of machines -- Part 33: Requirements for semiconductor fabrication equipment (Endorsed by AENOR in December of 2011.)
  • UNE-EN IEC 61010-2-030:2021 High-voltage switchgear and controlgear - Part 214: Internal arc classification for metal-enclosed pole-mounted switchgear and controlgear for rated voltages above 1 kV and up to and including 52 kV
  • UNE-EN IEC 62271-214:2021 High-voltage switchgear and controlgear - Part 214: Internal arc classification for metal-enclosed pole-mounted switchgear and controlgear for rated voltages above 1 kV and up to and including 52 kV
  • UNE-EN IEC 61010-2-030:2021/A11:2021 High-voltage switchgear and controlgear - Part 214: Internal arc classification for metal-enclosed pole-mounted switchgear and controlgear for rated voltages above 1 kV and up to and including 52 kV
  • UNE-EN 62026-3:2015/AC:2019-12 Low-voltage switchgear and controlgear - Controller-device interfaces (CDIs) - Part 3: DeviceNet (Endorsed by Asociación Española de Normalización in January of 2020.)
  • UNE-EN 62026-7:2013 Low-voltage switchgear and controlgear - Controller-device interfaces (CDIs) - Part 7: CompoNet (Endorsed by AENOR in July of 2013.)
  • UNE-EN 62026-3:2015/A11:2020 Low-voltage switchgear and controlgear - Controller-device interfaces (CDIs) - Part 3: DeviceNet (Endorsed by Asociación Española de Normalización in March of 2020.)
  • UNE-EN 62026-3:2015 Low-voltage switchgear and controlgear - Controller-device interfaces (CDIs) - Part 3: DeviceNet (Endorsed by AENOR in May of 2015.)
  • UNE-EN IEC 61439-2:2021 Low-voltage switchgear and controlgear assemblies - Part 2: Power switchgear and controlgear assemblies
  • UNE-EN 62271-1:2019/A1:2022 High-voltage switchgear and controlgear - Part 1: Common specifications for alternating current switchgear and controlgear
  • UNE-EN 62271-1:2019 High-voltage switchgear and controlgear - Part 1: Common specifications for alternating current switchgear and controlgear
  • UNE-EN IEC 62442-1:2022 Energy performance of lamp controlgear - Part 1: Controlgear for fluorescent lamps - Method of measurement to determine the total input power of controlgear circuits and the efficiency of controlgear (Endorsed by Asociación Española de Normalización...
  • UNE-EN IEC 62442-1:2019 Energy performance of lamp controlgear - Part 1: Controlgear for fluorescent lamps - Method of measurement to determine the total input power of controlgear circuits and the efficiency of the controlgear
  • UNE-EN IEC 62026-1:2020 Low-voltage switchgear and controlgear - Controller-device interfaces (CDIs) - Part 1: General rules
  • UNE-EN IEC 62442-2:2022 Energy performance of lamp controlgear - Part 2: Controlgear for discharge lamps (excluding low-pressure mercury fluorescent lamps) - Method of measurement to determine the efficiency of controlgear (Endorsed by Asociación Española de Normalización ...
  • UNE-CEN/TS 17702-2:2022 Plant biostimulants - Sampling and sample preparation - Part 2: Sample preparation (Endorsed by Asociación Española de Normalización in May of 2022.)

Association Francaise de Normalisation, preparative column semi-preparative

  • NF EN 60204-33:2012 Sécurité des machines - Équipement électrique des machines - Partie 33 : exigences pour les équipements de fabrication des semi-conducteurs
  • NF C64-471-214*NF EN IEC 62271-214:2019 High-voltage switchgear and controlgear - Part 214 : internal arc classification for metal-enclosed pole-mounted switchgear and controlgear for rated voltages above 1 kV and up to and including 52 kV
  • NF EN 62026-3:2015 Appareillage à basse tension - Interface appareil de commande-appareil (CDI) - Partie 3 : DeviceNet
  • NF C63-146*NF EN 60947-5-1:2017 Low-voltage switchgear and controlgear - Part 5-1 : control circuit devices and switching elements - Electromechanical control circuit devices
  • NF EN 61347-2-7/A2:2022 Appareillages de lampes - Partie 2-7 : Exigences particulières relatives aux appareillages électroniques alimentés par source électrique de sécurité (ESSS) pour l'éclairage de secours (autonome)
  • NF EN IEC 62026-1:2019 Appareillage à basse tension - Interfaces appareil de commande-appareil (CDI) - Partie 1 : règles générales
  • NF P98-310:2001 Access control devices - Retractable bollards - Characteristics and performances of automatic, semiautomatic and manual retractable bollards
  • NF C63-026-3/A11*NF EN 62026-3/A11:2020 Low-voltage switchgear and controlgear - Controller-device interfaces (CDIs) - Part 3 : deviceNet
  • NF EN 62026-7:2013 Appareillage à basse tension - Interfaces appareil de commande-appareil (CDI) - Partie 7 : CompoNet
  • NF EN 60947-5-1:2017 Appareillage à basse tension - Partie 5-1 : appareils et éléments de commutation pour circuits de commande - Appareils électromécaniques pour circuits de commande
  • NF EN IEC 60947-6-2:2023 Appareillage à basse tension - Partie 6-2 : matériels à fonctions multiples - Appareils (ou matériel) de connexion de commande de protection (ACP)
  • NF F80-151:1980 Railway transport equipment - Cold fulding radii for flat products - Minimum folding radii for non-ferrous rolled products.
  • NF C63-112*NF EN 60947-4-2:2012 Low-voltage switchgear and controlgear - Part 4-2 : contactors and motor-starters - AC semiconductor motor controllers and starters
  • NF C63-421-2*NF EN IEC 61439-2:2021 Low-voltage switchgear and controlgear assemblies - Part 2 : power switchgear and controlgear assemblies
  • NF EN IEC 61439-2:2021 Ensembles d'appareillage à basse tension - Partie 2 : ensembles d'appareillage de puissance
  • NF EN IEC 62442-1:2022 Performance énergétique des appareillages de lampes - Partie 1 : appareillages des lampes à fluorescence - Méthode de mesurage pour la détermination de la puissance d'entrée totale des circuits d'appareillage et du rendement des appareillages
  • NF C64-471-1*NF EN 62271-1:2017 High-voltage switchgear and controlgear - Part 1 : common specifications for alternating current switchgear and controlgear
  • NF C64-471-1/A1*NF EN 62271-1/A1:2021 High-voltage switchgear and controlgear - Part 1 : common specifications for alternating current switchgear and controlgear
  • NF T58-001:1997 Plastics. Preparation of test specimens by machining.
  • NF E63-516*NF ISO 9449:2007 Tools for moulding - Centring sleeves
  • NF C63-101:1985 Low-voltage switchgear and controlgear for industrial use - Tests of contact materials for low-voltage controlgear
  • NF C63-026-1*NF EN IEC 62026-1:2019 Low-voltage switchgear and controlgear - Controller-device interfaces (CDIs) - Part 1 : general rules
  • NF EN ISO 17664-1:2021 Traitement de produits de soins de santé - Informations relatives au traitement des dispositifs médicaux à fournir par le fabricant du dispositif - Partie 1 : dispositifs médicaux critiques et semi-critiques
  • NF C63-421-2*NF EN 61439-2:2012 Low-voltage switchgear and controlgear assemblies - Part 2 : power switchgear and controlgear assemblies
  • NF T51-550-2:2006 Plastics - Polytetrafluoroethylene (PTFE) semi-finished products - Part 2 : preparation of test specimens and determination of properties.
  • NF S61-706:1966 Fire fighting equipment. Positioning of the lugs or jaws on guillemin-type and self-sealing symmetrical couplings.
  • NF E68-001:2014 Equipment for the manufacture of products made of composite materials - Terminology
  • XP CEN/TS 17702-2:2022 Biostimulants des végétaux - Echantillonnage et préparation des échantillons - Partie 2 : préparation des échantillons
  • NF EN 50123-6:2004 Applications ferroviaires - Installations fixes - Appareillage à courant continu - Partie 6 : ensembles d'appareillage
  • NF EN 50123-6/A1:2015 Applications ferroviaires - Installations fixes - Appareillage à courant continu - Partie 6 : ensembles d'appareillage
  • NF EN 60947-6-2/A1:2007 Appareillage à basse tension - Partie 6-2 : matériels à fonctions multiples - Appareils (ou matériel) de connexion de commande et de protection (ACP)
  • NF EN 62026-2:2013 Appareillage à basse tension - Interfaces appareil de commande-appareil (CDI) - Partie 2 : interface capteur-actionneur (AS-i)
  • NF EN 62026-2/A1:2019 Appareillage à basse tension - Interfaces appareil de commande-appareil (CDI) - Partie 2 : interface capteur-actionneur (AS-i)

CENELEC - European Committee for Electrotechnical Standardization, preparative column semi-preparative

  • EN 60204-33:2011 Safety of machinery - Electrical equipment of machines - Part 33: Requirements for semiconductor fabrication equipment
  • EN 60947-4-2:1996 Low-Voltage Switchgear and Controlgear Part 4: Contactors and Motor-Starters Section 2: AC Semiconductor Motor Controllers and Starters

AT-ON, preparative column semi-preparative

  • ONORM M 1346-1-1995 Control of measuring and test equipment - Testing Instruction for plug gauges

Taiwan Provincial Standard of the People's Republic of China, preparative column semi-preparative

  • CNS 152-1994 Semi - Finished Washers (for Bolts with Cylindrical Head and Nuts)
  • CNS 13802-7-1997 Graphical Symbols for Diagrams (Switchgear,Controlgear and Protective Devices)
  • CNS 13802.7-1997 Graphical Symbols for Diagrams (Switchgear,Controlgear and Protective Devices)
  • CNS 6573-2006 Essential oils - Preparation of test samples

Defense Logistics Agency, preparative column semi-preparative

European Committee for Electrotechnical Standardization(CENELEC), preparative column semi-preparative

  • EN IEC 62271-214:2019 High-voltage switchgear and controlgear - Part 214: Internal arc classification for metal-enclosed pole-mounted switchgear and controlgear for rated voltages above 1 kV and up to and including 52 kV
  • FprEN IEC 60947-4-3:2020 Low-voltage switchgear and controlgear - Part 4-3: Contactors and motor-starters - Semiconductor controllers and semiconductor contactors for non-motor loads
  • EN 61439-2:2009 Low-voltage switchgear and controlgear assemblies - Part 2: Power switchgear and controlgear assemblies (Remains Current)
  • EN 60947-4-2:2012 Low-voltage switchgear and controlgear - Part 4-2: Contactors and motor-starters - AC semiconductor motor controllers and starters
  • EN 62026-7:2013 Low-voltage switchgear and controlgear - Controller-device interfaces (CDIs) - Part 7: CompoNet
  • EN 62026-3:2015/prA12 Low-voltage switchgear and controlgear - Controller-device interfaces (CDIs) - Part 3: DeviceNet
  • EN IEC 60947-4-2:2023 Low-voltage switchgear and controlgear - Part 4-2: Contactors and motor-starters - Semiconductor motor controllers, starters and soft-starters
  • EN IEC 60947-6-2:202X/prAA Low-voltage switchgear and controlgear - Part 6-2: Multiple function equipment - Control and protective switching devices (or equipment) (CPS)
  • EN IEC 61439-2:2021 Low-voltage switchgear and controlgear assemblies - Part 2: Power switchgear and controlgear assemblies
  • EN IEC 61439-2:2021/prAA Low-voltage switchgear and controlgear assemblies - Part 2: Power switchgear and controlgear assemblies
  • EN 62271-1:2017 High-voltage switchgear and controlgear - Part 1: Common specifications for alternating current switchgear and controlgear
  • CLC IEC/TR 63216:2020 Low-voltage switchgear and controlgear - Electromagnetic compatibility assessment for switchgear and controlgear and their assemblies
  • EN IEC 62026-1:2019 Low-voltage switchgear and controlgear - Controller-device interfaces (CDIs) - Part 1: General rules
  • EN 61439-2:2011 Low-voltage switchgear and controlgear assemblies - Part 2: Power switchgear and controlgear assemblies
  • EN 62047-7:2011 Semiconductor devices - Micro-electromechanical devices - Part 7: MEMS BAW filter and duplexer for radio frequency control and selection
  • EN 62026-3:2015 Low-voltage switchgear and controlgear - Controller-device interfaces (CDIs) - Part 3: DeviceNet

PT-IPQ, preparative column semi-preparative

CZ-CSN, preparative column semi-preparative

Standard Association of Australia (SAA), preparative column semi-preparative

NL-NEN, preparative column semi-preparative

  • NEN 6872-1985 Milk and milk products - Preparation of the sample and preparation of dilutions for microbiological examination

Association of German Mechanical Engineers, preparative column semi-preparative

  • VDI 2283-2008 Emission control - Preparation plants for ready-mix asphalt (asphalt mixing plants)

The American Road & Transportation Builders Association, preparative column semi-preparative

Canadian Standards Association (CSA), preparative column semi-preparative

US-FCR, preparative column semi-preparative

PL-PKN, preparative column semi-preparative

  • PN E06150-51-1992 Low-voltage switchgear and controlgear Control circuit devices und switching elements Electromechanica! control circuit devices
  • PN A86506-1991 Egg products Sampling and preparation of samples
  • PN G01052-1987 Coal preparation Sampling, preparation and analysis of hard coal Terms and definitions
  • PN P50069-1974 Half-products of the paper industry Preparation of test samples for determination of optical proprieties
  • PN-EN IEC 61439-2-2021-10 E Low-voltage switchgear and controlgear assemblies -- Part 2: Power switchgear and controlgear assemblies (IEC 61439-2:2020)

机械工业部, preparative column semi-preparative

Institute of Electrical and Electronics Engineers (IEEE), preparative column semi-preparative

  • IEEE Std 1687-2014 IEEE Standard for Access and Control of Instrumentation Embedded within a Semiconductor Device
  • IEEE 1687-2014 Access and Control of Instrumentation Embedded within a Semiconductor Device (IEEE Computer Society)
  • IEEE P1687/D1.62, September 2013 IEEE Draft Standard for Access and Control of Instrumentation Embedded within a Semiconductor Device
  • IEEE P1687/D1.71, March 2014 IEEE Approved Draft Standard for Access and Control of Instrumentation Embedded within a Semiconductor Device

American Gear Manufacturers Association, preparative column semi-preparative

  • AGMA 6114-B15-2015 Gear Power Rating for Cylindrical Shell and Trunnion Supported Equipment (Metric Edition)
  • AGMA 6114-A06-2006 Gear Power Rating for Cylindrical Shell and Trunnion Supported Equipment (Metric Edition)

AGMA - American Gear Manufacturers Association, preparative column semi-preparative

  • 6114-B15-2015 Gear Power Rating for Cylindrical Shell and Trunnion Supported Equipment (Metric Edition)
  • 6114-A06-2006 Gear Power Rating for Cylindrical Shell and Trunnion Supported Equipment (Metric Edition)

SE-SIS, preparative column semi-preparative

SAE - SAE International, preparative column semi-preparative

  • SAE EIA-4900-2016 Use of Semiconductor Devices Outside Manufacturers' Specified Temperature Ranges

BE-NBN, preparative column semi-preparative

International Truck and Engine Corporation (ITEC), preparative column semi-preparative

TH-TISI, preparative column semi-preparative

  • TIS 2267.3-2006 Low.voltage switchgear and controlgear.controller.device interfaces (cdis).part 3: devicenet
  • TIS 2267.1-2006 Low.voltage switchgear and controlgear.controller.device interfaces (cdis).part 1: general rules

Society of Automotive Engineers (SAE), preparative column semi-preparative

  • SAE J2271M-1996 Ship Systems and Equipment - Part Standard for Studs - Continuous and Double End (Metric)
  • SAE J2271M-2015 Ship Systems and Equipment - Part Standard for Studs - Continuous and Double End (Metric)
  • SAE J2271M-2004 Ship Systems and Equipment—Part Standard for Studs—Continuous and Double End (Metric)
  • SAE AS483-1962 SKID CONTROL EQUIPMENT
  • SAE J2271-2004 Ship Systems and Equipment - Part Standard for Studs - Continuous and Double End (Inch Series)

General Administration of Quality Supervision, Inspection and Quarantine of the People‘s Republic of China, preparative column semi-preparative

  • GB/Z 41909-2022 Low-voltage switchgear and controlgear—Electromagnetic compatibility assessment for switchgear and controlgear and their assemblies
  • GB/T 18858.3-2002 Low-voltage switchgear and controlgear-Controller-Device Interface(CDI)-Part 3: Device Net
  • GB/T 18858.3-2012 Low-voltage switchgear and controlgear.Controller-device interface(CDI).Part 3:DeviceNet
  • GB/T 18858.7-2014 Low-voltage switchgear and controlgear.Controller-device interfaces(CDIs).Part 7:CompoNet
  • GB/T 3797-2016 Electrical control assemblies
  • GB/T 15687-1995 Oils and fats--Preparation of test sample
  • GB/T 3797-2005 Electrical control assemblies
  • GB/T 14454.1-2008 Fragrance/Flavor substances.Preparation of test samples
  • GB/T 14454.1-1993 Aromatics. Preparation of test sample
  • GB/T 18858.1-2002 Low-voltage switchgear and controlgear-Controller-device interfaces (CDIs)--Part 1:General rules
  • GB/T 18858.1-2012 Low-voltage switchgear and controlgear.Controller-device interface(CDI).Part 1:General rules
  • GB 14048.6-1998 Low-voltage switchgear and controlgear. Contactors and motor-starters. Section 2: AC semiconductor motor controllers and starters
  • GB/T 19448.2-2004 Tool holders with cylindrical shank-Part 2:Type A,shanks for tool holders of special designs
  • GB/T 21207.1-2014 Low-voltage switchgear and controlgear.Device profiles for networked industrial devices.Part 1:General rules for development of device profiles
  • GB/T 29845-2013 Guide for final assembly, packaging, transportation, unpacking, and relocation of semiconductor manufacturing equipment
  • GB/T 7321-2004 Sample preparation for testing of shaped refractory products
  • GB 1727-1992 General preparation of paint film
  • GB 474-1996 Preparation of coal sample
  • GB 474-2008 Method for preparation of coal sample
  • GB/T 1727-2021 General methods for preparation of coating films
  • GB/T 25949-2010 Aluminium ores.Preparation of samples
  • GB/T 14048.1-2000 Low-voltage switchgear and controlgear. General rules
  • GB 14048.9-1998 Low-voltage switchgear and controlgear. Multiple function equipment. Section 2: Control and protective switching devices (or equipment)(CPS)
  • GB 7251.12-2013 Low-voltage switchgear and controlgear assemblies.Part 2:Power switchgear and controlgear assemblies
  • GB/T 7251.2-2023 Low-voltage switchgear and controlgear assemblies—Part 2: Power switchgear and controlgear assemblies
  • GB/T 28810-2012 High-voltage switchgear and controlgear.The use of electronic and associated technologies in auxiliary equipment of switchgear and controlgear

American Petroleum Institute (API), preparative column semi-preparative

  • API Spec 16D-2018 Specification for Control Systems for Drilling Well Control Equipment and Control Systems for Diverter Equipment

European Committee for Standardization (CEN), preparative column semi-preparative

  • HD 419.2 S1-1987 Low-voltage controlgear; part 2: semiconductor contactors (solid state contactors)
  • EN 14780:2011 Solid biofuels - Sample preparation
  • prEN 17702-2 Plant biostimulants - Sampling and sample preparation - Part 2: Sample preparation
  • CEN/TS 17702-2:2022 Plant biostimulants - Sampling and sample preparation - Part 2: Sample preparation
  • FprCEN/TS 17702-2-2021 Plant biostimulants - Sampling and sample preparation - Part 2: Sample preparation

United States Navy, preparative column semi-preparative

IEC - International Electrotechnical Commission, preparative column semi-preparative

  • IEC 62271 High-voltage switchgear and controlgear (***CONTAINS ALL IEC 62271 STANDARDS***)
  • PAS 62240-2001 Use of Semiconductor Devices Outside Manufacturer's Specified Temperature Ranges (Edition 1.0)
  • PAS 62026-7-2009 Low-voltage switchgear and controlgear – Controller-Device Interfaces (CDIs) – Part 7: CompoNet (Edition 1.0)

VN-TCVN, preparative column semi-preparative

  • TCVN 2823-1999 Aluminium ores.Preparation of samples
  • TCVN 4833-2-2002 Meat and meat products.Sampling and preparation of test samples.Part 2: Preparation of test samples for microbiological examination

Indonesia Standards, preparative column semi-preparative

RO-ASRO, preparative column semi-preparative

TR-TSE, preparative column semi-preparative

American National Standards Institute (ANSI), preparative column semi-preparative

Underwriters Laboratories (UL), preparative column semi-preparative

  • UL 184-1991 Garment finishing appliances
  • UL 508-1999 UL Standard for Safety Industrial Control Equipment Seventeenth Edition; Reprint with Revisions Through and Including 7/11/2005

中华人民共和国国家质量监督检验检疫总局、中国国家标准化管理委员会, preparative column semi-preparative

North Atlantic Treaty Organization Standards Agency, preparative column semi-preparative

  • STANAG 4168-1985 CHARACTERITICS OF HYDROGEN GENERATING EQUIPMENT
  • STANAG 2604-1986 BRAKING SYSTEMS BETWEEN TRACTORS, DRAW-BAR TRAILER AND SEMI-TRAILER EQUIPMENT COMBINATIONS FOR MILITARY USE

National Aeronautics and Space Administration (NASA), preparative column semi-preparative

US-VA, preparative column semi-preparative

IPC - Association Connecting Electronics Industries, preparative column semi-preparative

IEEE - The Institute of Electrical and Electronics Engineers@ Inc., preparative column semi-preparative

KR-KS, preparative column semi-preparative

American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE), preparative column semi-preparative

Professional Standard - Agriculture, preparative column semi-preparative

  • NY/T 1094.1-2006 Wheat experimental milling Part 1:Equipment,sample preparation,and tempering
  • GB/T 14048.1-1993 General rules for low-voltage switchgear and controlgear

Professional Standard - Petroleum, preparative column semi-preparative

  • SY/T 5053.2-2007 Specification for control systems for drilling well control equipment and control systems for diverter equipment

Professional Standard - Chemical Industry, preparative column semi-preparative

  • HG/T 3696.3-2011 Inorganic chemicals for industrical use.Preparations of standard and reagent solutions for chemical analysis.Part 3: Preparations of reagent solutions

API - American Petroleum Institute, preparative column semi-preparative

  • API SPEC 16D KAZAKH-2004 Specification for Control Systems for Drilling Well Control Equipment and Control Systems for Diverter Equipment (SECOND EDITION)
  • API SPEC 16D-1993 Specification for Control Systems for Drilling Well Control Equipment

IN-BIS, preparative column semi-preparative

Lithuanian Standards Office , preparative column semi-preparative

  • LST EN 60204-33-2011 Safety of machinery - Electrical equipment of machines -- Part 33: Requirements for semiconductor fabrication equipment (IEC 60204-33:2009, modified)
  • LST EN 62026-3-2009 Low-voltage switchgear and controlgear - Controller-device interfaces (CDIs) - Part 3: DeviceNet (IEC 62026-3:2008)
  • LST EN 1482-2-2007 Fertilizers and liming materials - Sampling and sample preparation - Part 2: Sample preparation
  • LST EN 61439-2-2012 Low-voltage switchgear and controlgear assemblies -- Part 2: Power switchgear and controlgear assemblies (IEC 61439-2:2011)
  • LST EN IEC 61439-2:2021 Low-voltage switchgear and controlgear assemblies - Part 2: Power switchgear and controlgear assemblies (IEC 61439-2:2020)

国家能源局, preparative column semi-preparative

  • SY/T 5053.2-2020 Oil and gas drilling equipment, drilling wellhead control equipment and diversion equipment control system

American Society for Testing and Materials (ASTM), preparative column semi-preparative

  • ASTM D5687/D5687M-95(2002) Standard Guide for Preparation of Flat Composite Panels with Processing Guidelines for Specimen Preparation
  • ASTM D5687/D5687M-95(2015) Standard Guide for Preparation of Flat Composite Panels with Processing Guidelines for Specimen Preparation
  • ASTM D56-16a Standard Test Method for Flash Point by Tag Closed Cup Tester
  • ASTM B630-88(2006) Standard Practice for Preparation of Chromium for Electroplating with Chromium
  • ASTM B630-88(2001) Standard Practice for Preparation of Chromium for Electroplating with Chromium
  • ASTM D5687/D5687M-95 Standard Guide for Preparation of Flat Composite Panels with Processing Guidelines for Specimen Preparation
  • ASTM D5687/D5687M-20 Standard Guide for Preparation of Flat Composite Panels with Processing Guidelines for Specimen Preparation

未注明发布机构, preparative column semi-preparative

  • BS 5424-2:1987(1999) Low - voltage controlgear — Part 2 : Specification for semiconductor contactors (solid state contactors)

ASHRAE - American Society of Heating@ Refrigerating and Air-Conditioning Engineers@ Inc., preparative column semi-preparative

Professional Standard-Ships, preparative column semi-preparative

  • CB*/Z 342-1984 Manufacturing process of marine power distribution control equipment

Professional Standard - Non-ferrous Metal, preparative column semi-preparative

International Telecommunication Union (ITU), preparative column semi-preparative

International Organization for Standardization (ISO), preparative column semi-preparative

  • ISO 1796:1982 Rubber, raw — Sample preparation
  • ISO 1796:1972 Title missing - Legacy paper document
  • ISO 356:1996 Essential oils - Preparation of test samples
  • ISO/TR 20580:2022 Preparation of metallographic specimens
  • ISO 4661:1977 Rubber — Preparation of test pieces
  • ISO/IEC 29341-30-2:2017 Information technology - UPnP Device Architecture - Part 30-2: IoT management and control device control protocol - IoT management and control device
  • ISO 14820-2:2016 Fertilizers and liming materials - Sampling and sample preparation - Part 2: Sample preparation
  • ISO 3100-2:1988 Meat and meat products — Sampling and preparation of test samples — Part 2: Preparation of test samples for microbiological examination

GM North America, preparative column semi-preparative

National Sanitation Foundation (NSF), preparative column semi-preparative

ZA-SANS, preparative column semi-preparative

  • SANS 197:2006 Preparation of test samples of aggregates
  • SANS 61439-2:2009 Low-voltage switchgear and controlgear assemblies Part 2: Power switchgear and controlgear assemblies

GOSTR, preparative column semi-preparative

  • GOST IEC 60947-4-3-2017 Low-voltage switchgear and controlgear. Part 4-3. Contactors and motor-starters. AC semiconductor controllers and contactors for non-motor loads
  • GOST R IEC 61439.2-2012 Low-voltage switchgear and controlgear assemblies. Part 2. Power switchgear and controlgear assemblies

JP-JEM, preparative column semi-preparative

  • JEM 1218-2009 Development diagram of control switches for switchgear and controlgear assemblies

Professional Standard - Forestry, preparative column semi-preparative

WRC - Welding Research Council, preparative column semi-preparative

  • BULLETIN 525- FABRICATION AND REPAIR OF LOW ALLOY STEEL PRESSURE EQUIPMENT




Copyright ©2007-2023 ANTPEDIA, All Rights Reserved