ZH

RU

ES

full flow partial flow

full flow partial flow, Total:494 items.

In the international standard classification, full flow partial flow involves: Railway rolling stock, Domestic safety, Installations in buildings, Body care equipment, Kitchen equipment, Electric traction equipment, Electrical accessories, Domestic electrical appliances in general, Sports equipment and facilities, Solar energy engineering, Rectifiers. Convertors. Stabilized power supply, Lamps and related equipment, On-board equipment and instruments, Electricity. Magnetism. Electrical and magnetic measurements, Geology. Meteorology. Hydrology, Semiconductor devices, Electrical engineering in general, Power transmission and distribution networks, Pumps, Transformers. Reactors, Measurement of volume, mass, density, viscosity, Road vehicle systems, Floor treatment appliances, Diagnostic, maintenance and test equipment, Electrical wires and cables, Internal combustion engines, Lubrication systems, Measurement of fluid flow, Fruits. Vegetables, Welding, brazing and soldering, Valves, Ventilators. Fans. Air-conditioners, Services, Agricultural machines, implements and equipment, Galvanic cells and batteries, Protection against electric shock, Information technology (IT) in general, Water quality, ELECTRICAL ENGINEERING, Radiation protection, Protection against fire, Insulation, Burners. Boilers, Fuel cells, Rubber and plastics products, Capacitors, Medical equipment, Construction materials, Transport, Conducting materials, Hydraulic energy engineering, Chipless working equipment, Electrical and electronic testing, Industrial automation systems, Electrical equipment for working in special conditions, Character sets and information coding, Telecommunication terminal equipment, Fluid power systems, Microbiology, Radiocommunications, Packaging machinery, Construction industry, Components for electrical equipment, Wind turbine systems and other alternative sources of energy, Company organization and management, Plastics, Applications of information technology, Fuels, Tobacco, tobacco products and related equipment, Vocabularies, Test conditions and procedures in general.


British Standards Institution (BSI), full flow partial flow

  • 22/30458358 DC BS EN 63458-1. High Pressure Water Jet Machines. Safety - Part 1. High Pressure Water Jet Unit
  • 21/30442610 DC BS EN IEC 60755-1. General safety requirements for residual current operated protective devices. Part 1. Residual current operated protective devices for DC systems
  • 19/30396999 DC BS EN IEC 60755-2. General safety requirements for residual current operated protective devices. Part 2. Residual current operated protective devices for DC systems
  • 12/30247717 DC BS IEC 62128-3. Railway applications. Fixed installations. Electrical safety, earthing and the return circuit. Part 3. Mutual Interaction of a.c. and d.c. traction systems
  • 20/30430763 DC BS EN 50122-3. Railway applications. Fixed installations. Electrical safety, earthing and the return circuit. Part 3. Mutual Interaction of AC and DC traction systems
  • 22/30454699 DC BS EN IEC 61347-2-2. Controlgear for electric light sources. Safety - Part 2-2. Particular requirements for DC or AC supplied electronic step-down convertors for filament lamps
  • 21/30444893 DC BS EN IEC 61810-7-54. All-or-nothing electrical relays. Tests and Measurements - Part 7-54. Critical DC load current test
  • 22/30457833 DC BS EN IEC 61810-7-54. All-or-nothing electrical relays. Tests and Measurements - Part 7-54. Critical DC load current test
  • BS 3680-6:1995 Measurement of liquid flow in open channels - Guide to measurement of flow in tidal channels
  • BS 3680-3Q:2002 Measurement of liquid flow in open channels - Guidelines for safe working practice in river flow measurement
  • BS 1042 Sec.2.4:1989 Measurement of fluid flow in closed conduits. Velocity-area methods. Method of measurement of clean water flow using current meters in full conduits and under regular flow conditions
  • BS 3680-4C:1981 Methods of measurement of liquid flow in open channels - Weirs and flumes - Flumes
  • BS EN 60990:2000 Methods of measurement of touch current and protective conductor current
  • BS EN 60909-3:2004 Short-circuit current calculation in three-phase a.c. systems - Currents during two separate simultaneous single phase line-to- earth short circuits and partial short-circuit currents flowing through earth
  • BS EN 60909-3:2010 Short-circuit currents in three-phase a.c systems - Currents during two separate simultaneous line-to-earth short-circuits and partial short-circuit currents flowing through earth
  • BS EN 60909-3:2003 Short-circuit current calculation in three-phase a.c. systems - Currents during two separate simultaneous single phase line-to- earth short circuits and partial short-circuit currents flowing through earth
  • BS 6182-2:1982 Intrinsically safe power supplies for use in coal mines - Specification for a.c. power supplies
  • 21/30444617 DC BS EN ISO 5167-6. Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full. Part 6. Wedge meters
  • 21/30444613 DC BS EN ISO 5167-5. Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full. Part 5. Cone meters
  • BS 3680-3M:1990 Measurement of liquid flow in open channels - Stream flow measurement - Guide to the methods of measuring high discharges in rivers
  • BS ISO 1100-2:1998 Measurement of liquid flow in open channels - Determination of the stage-discharge relation
  • BS EN ISO 3219-2:2021 Rheology. General principles of rotational and oscillatory rheometry

Association Francaise de Normalisation, full flow partial flow

  • CWA 15669-1:2007 Business requirements specification - Cross industry ordering process - Part 1 : global ordering process model definition
  • NF C73-860/A2*NF EN 60335-2-60/A2:2009 Household and similar electrical appliances - Safety - Part 2-60 : particular requirements for whirlpool baths and whirlpool spas
  • NF C73-860/A1*NF EN 60335-2-60/A1:2005 Household and similar electrical appliances - Safety - Part 2-60 : particular requirements for whirlpool baths and whirlpool spas
  • NF F41-122-3*NF EN 50122-3:2011 Railway applications - Fixed installations - Electrical safety, earthing and the return circuit - Part 3 : mutual interaction of a.c. and d.c. traction systems
  • NF EN 50122-3:2022 Applications ferroviaires - Installations fixes - Sécurité électrique, mise à la terre et circuit de retour - Partie 3 : interactions mutuelles entre systèmes de traction en courant alternatif et en courant continu
  • NF C71-240:1995 D.C. or A.C. supplied electronic step-down convertors for filament lamps. General and safety requirements.
  • NF L74-165:1971 50 millivolts external ammeter shunts.
  • NF EN 13411-9:2021 Terminaisons pour câbles en acier - Sécurité - Partie 9 : cosses pleines
  • NF EN 60909-0:2016 Courants de court-circuit dans les réseaux triphasés à courant alternatif - Partie 0 : calcul des courants
  • NF EN 62453-303-2:2016 Courants de court-circuit dans les réseaux triphasés à courant alternatif - Partie 0 : calcul des courants
  • NF ISO 4548-1:1988 Méthodes d'essai des filtres à huile de lubrification à passage intégral pour moteurs à combustion interne - Partie 1 : caractéristique débit/perte de charge.
  • NF C10-120:2002 Short-circuit currents in three-phase a.c.systems - Part 0 : calculation of currents.
  • NF C10-120*NF EN 60909-0:2016 Short-circuit currents in three-phase a.c.systems - Part 0 : calculation of currents
  • NF C53-221*NF EN 60146-2:2002 Semiconductor converters - Part 2 : self-commutated semiconductor converters including direct d.c. converters
  • NF EN 1829-1:2021 Machines à jet d'eau à haute pression - Exigences de sécurité - Partie 1 : machines
  • NF EN 60909-3:2010 Courants de court-circuit dans les réseaux triphasés à courant alternatif - Partie 3 : courants durant deux court-circuits monophasés simultanés séparés à la terre et courants de court-circuit partiels s'écoulant à travers la terre
  • NF E37-401*NF ISO 4548-1:1988 Methods of test for full-flow lubricating oil filters for internal combustion engines. Part 1 : pressure drop/flow characteristics.
  • NF C53-204-7:2007 Low voltage power supplies, d.c. output - Part 7 : safety requirements.
  • NF C53-204-7/A11:2010 Low voltage power supplies, d.c. output - Part 7 : safety requirements.
  • NF EN 13411-8:2011 Terminaisons pour câbles en acier - Sécurité - Partie 8 : terminaisons à sertir et sertissage
  • NF ISO 6358-2:2020 Transmissions pneumatiques - Détermination des caractéristiques de débit des composants traversés par un fluide compressible - Partie 2 : méthodes d'essai alternatives
  • NF C10-123*NF EN 60909-3:2010 Short-circuit currents in three phase a.c. systems - Part 3 : currents during two separate simultaneous line-to-earth short circuits and partial short circuit currents flowing through earth
  • NF EN IEC 60071-12:2022 Coordination de l'isolement - Partie 12 : lignes directrices en matière d'application pour stations de conversion à courant continu haute tension (CCHT) équipées de convertisseurs commutés par le réseau (LCC)
  • NF EN 62146-1:2014 Condensateurs de répartition pour disjoncteurs à courant alternatif haute tension - Partie 1 : généralités
  • NF T90-511-6*NF EN ISO 5667-6:2016 Water quality - Sampling - Part 6 : guidance on sampling of rivers and streams
  • NF T90-511-6/A11*NF EN ISO 5667-6/A11:2020 Water quality - Sampling - Part 6 : guidance on sampling of rivers and streams
  • NF EN ISO 5667-6/A11:2020 Qualité de l'eau - Échantillonnage - Partie 6 : lignes directrices pour l'échantillonnage des rivières et des cours d'eau
  • NF EN ISO 5667-6:2016 Qualité de l'eau - Échantillonnage - Partie 6 : lignes directrices pour l'échantillonnage des rivières et des cours d'eau
  • NF C10-100-5*NF EN 60071-5:2015 Insulation co-ordination - Part 5 : procedures for high-voltage direct current (HVDC) converter stations
  • NF S31-070-1*NF EN ISO 9053-1:2018 Acoustics - Determination of airflow resistance - Part 1 : static airflow method
  • NF EN ISO 9053-2:2020 Acoustique - Détermination de la résistance à l'écoulement de l'air - Partie 2 : méthode avec écoulement d'air alternatif
  • NF C31-888-2:2001 Superconductivity - Part 2 : critical current measurement - DC critical current of Nb3Sn composite superconductors.
  • NF X10-350-1*NF ISO 9555-1:1994 Measurement of liquid flow in open channels. Tracer dilution methods for the measurement of steady flow. Part 1 : general.
  • NF C31-888-2*NF EN 61788-2:2007 Superconductivity - Part 2 : critical current measurement - DC critical current of Nb3Sn composite superconductors
  • NF ISO 11933-5:2002 Composants pour enceintes de confinement - Partie 5 : traversées de paroi pour circuits électriques et circuits de fluide
  • NF C71-230:1992 BALLASTS FOR TUBULAR FLUORESCENT LAMPS. GENERAL AND SAFETY REQUIREMENTS. (EUROPEAN STANDARD EN 60 920).
  • NF EN 13411-6+A1:2008 Terminaisons pour câbles en acier - Sécurité - Partie 6 : boîte à coin asymétrique
  • NF E49-160-3*NF ISO 6358-3:2015 Pneumatic fluid power - Determination of flow-rate characteristics of components using compressible fmuids - Part 3 : method for calculating steady-state flow-rate characteristics of systems
  • NF C97-053*NF EN 50563:2013 External a.c. - d.c. and a.c. - a.c. power supplies - Determination of no-load power and average efficiency of active modes
  • NF C31-888-1*NF EN 61788-1:2007 Superconductivity - Part 1 : critical current measurement - DC critical current of Nb-Ti composite superconductors.
  • NF EN ISO 3219-2:2021 Rhéologie - Partie 2 : principes généraux de la rhéométrie rotative et oscillatoire
  • NF EN ISO 10628-1:2015 Schémas de procédé pour l'industrie chimique et pétrochimique - Partie 1 : spécification des schémas de procédé
  • NF ISO 6358-3:2015 Transmissions pneumatiques - Détermination des caractéristiques de débit des composants traversés par un fluide compressible - Partie 3 : méthode de calcul caractéristiques de débit stationnaire des assemblages
  • NF EN 60534-2-1:2011 Vannes de régulation des processus industriels - Partie 2-1 : capacité d'écoulement - Équations de dimensionnement pour l'écoulement des fluides dans les conditions d'installation
  • NF EN ISO 17657-2:2007 Soudage par résistance - Mesurage des courants en soudage par résistance - Partie 2 : ampèremètre avec tore de mesure de courant
  • NF C46-503:1993 INDUSTRIAL-PROCESS CONTROL VALVES. PART 2 : FLOW CAPACITY. SECTION ONE : SIZING EQUATIONS FOR INCOMPRESSIBLE FLUID FLOW UNDER INSTALLED CONDITIONS. (EUROPEAN STANDARD EN 60 534-2-1).
  • NF C71-234:1992 D.C. supplied electronic ballasts for tubular fluorescent lamps. General and safety requirements.
  • NF E49-160-2*NF ISO 6358-2:2020 Pneumatic fluid power - Determination of flow-rate characteristics of components using compressible fluids - Part 2 : alternative test methods
  • NF C31-888-1:2002 Superconductivity - Part 1 : critical current measurement - DC critical current of Cu/Nb-Ti composite superconductors.
  • NF X10-350-2*NF ISO 9555-2:1994 Measurement of liquid flow in open channels. Tracer dilution methods for the measurement of steady flow. Part 2 : radioactive tracers.
  • NF X10-350-4*NF ISO 9555-4:1994 Measurement of liquid flow in open channels. Tracer dilution methods for the measurement of steady flow. Part 4 : fluorescent tracers.
  • NF X10-350-3*NF ISO 9555-3:1994 Measurement of liquid flow in open channels. Tracer dilution methods for the measurement of steady flow. Part 3 : chemical tracers.
  • NF EN IEC 61936-1:2021 Installations électriques de puissance de tension supérieure à 1 kV en courant alternatif et 1,5 kV en courant continu - Partie 1 : courant alternatif
  • NF EN 16247-3:2022 Audits énergétiques - Partie 3 : Procédés

European Committee for Electrotechnical Standardization(CENELEC), full flow partial flow

  • EN 50122-3:2010 Railway applications - Fixed installations - Electrical safety, earthing and the return circuit - Part 3: Mutual Interaction of a.c. and d.c. traction systems
  • EN 50122-3:2022 Railway applications - Fixed installations - Electrical safety, earthing and the return circuit - Part 3: Mutual Interaction of a.c. and d.c. traction systems
  • EN 60909-0:2016 Short-circuit currents in three-phase a.c. systems - Part 0: Calculation of currents
  • EN 60146-2:2000 Semiconductors convertors Part 2: Self-commutated semiconductor converters including direct d.c. converters
  • EN 60909-3:2010 Short-circuit currents in three-phase a.c systems - Part 3: Currents during two separate simultaneous line-to-earth short-circuits and partial short-circuit currents flowing through earth
  • EN 60071-5:2015 Insulation co-ordination - Part 5: Procedures for high-voltage direct current (HVDC) converter stations
  • EN 61788-2:2007 Superconductivity Part 2: Critical current measurement - DC critical current of Nb3Sn composite superconductors
  • EN 61788-1:2007 Superconductivity Part 1: Critical current measurement - DC critical current of Nb-Ti composite superconductors
  • EN 61660-1:1997 Short-Circuit Currents in D.C. Auxiliary Installations in Power Plants and Substations Part 1: Calculation of Short-Circuit Currents
  • EN 60534-2-1:2011 Industrial-process control valves - Part 2-1: Flow capacity - Sizing equations for fluid flow under installed conditions
  • HD 60364-4-43:2010 Low-voltage electrical installations - Part 4-43: Protection for safety - Protection against overcurrent
  • EN IEC 61788-26:2020 Superconductivity - Part 26: Critical current measurement - DC critical current of RE-Ba-Cu-O composite superconductors

国家市场监督管理总局、中国国家标准化管理委员会, full flow partial flow

  • GB/T 28026.3-2018 Railway applications—Fixed installations—Electrical safety, earthing and the return circuit—Part 3: Mutual interaction of a.c.and d.c.traction systems
  • GB/T 28026.2-2018 Railway applications—Fixed installations—Electrical safety,earthing and the return circuit—Part 2:Provisions against the effects of stray currents caused by d.c. traction systems
  • GB/T 36271.2-2021 Power installations exceeding 1 kV a.c. and 1.5 kV d.c.—Part 2: d.c.
  • GB/T 26216.2-2019 DC current measuring device for HVDC transmission system—Part 2:Electromagnetic DC current measuring device
  • GB/T 26216.1-2019 DC current measuring device for HVDC transmission system—Part 1:Electronic DC current measuring device
  • GB/T 18494.2-2022 Convertor transformers—Part 2: Transformers for HVDC applications
  • GB/T 25387.2-2021 Wind turbines generator system—Full-power converter—Part 2:Test method
  • GB/T 25387.1-2021 Wind turbines generator system—Full-power converter—Part 1:Technical condition

International Electrotechnical Commission (IEC), full flow partial flow

  • IEC 60335-2-60:2005 Household and similar electrical appliances - Safety - Part 2-60: Particular requirements for whirlpool baths and whirlpool spas
  • IEC 62128-3:2013 Railway applications - Fixed installations - Electrical safety, earthing and the return circuit - Part 3: Mutual interaction of a.c. and d.c. traction systems
  • IEC 60335-2-60:2002/AMD2:2008 Household and similar electrical appliances - Safety - Part 2-60: Particular requirements for whirlpool baths and whirlpool spas; Amendment 2
  • IEC 60909-0:2001 Short-circuit currents in three-phase a.c. systems - Part 0: Calculation of currents
  • IEC 60909-0:2001/COR1:2002 Short-circuit currents in three-phase a.c. systems - Part 0: Calculation of currents
  • IEC 60909-0:2016 Short-circuit currents in three-phase a.c. systems - Part 0: Calculation of currents
  • IEC 60909-3:2003 Short-circuit currents in three-phase a.c. systems - Part 3: Currents during two separate simultaneous line-to-earth short circuits and partial short-circuit currents flowing through earth
  • IEC 60909-3:1995 Short-circuit current calculation in three-phase a.c. systems - Part 3: Currents during two separate simultaneous single phase line-to-earth short circuits and partial short-circuit currents flowing through earth
  • IEC 60146-2:1999 Semiconductor converters - Part 2: Self-commutated semiconductor converters including direct d.c. converters
  • IEC 60755-1:2022 General safety requirements for residual current operated protective devices - Part 1: Residual current operated protective devices for DC systems
  • IEC 61046:1991 D.C. or a.c. supplied electronic step-down converters for filament lamps; general and safety requirements
  • IEC 61046:1993 D.C. or a.c. supplied electronic step-down converters for filament lamps; general and safety requirements
  • IEC TR 60909-4:2000 Short-circuit currents in three-phase a.c. systems - Part 4: Examples for the calculation of short-circuit currents
  • IEC TR 60909-4:2021 Short-circuit currents in three-phase AC systems - Part 4: Examples for the calculation of short-circuit currents
  • IEC TS 61936-2:2015 Power installations exceeding 1 kV a.c. and 1,5 kV d.c. - Part 2: d.c.
  • IEC TR 60919-3:2009+AMD1:2016 CSV Performance of high-voltage direct current (HVDC) systems with line-commutated converters - Part 3: Dynamic conditions
  • IEC 60909-3:2009/COR1:2013 Short-circuit currents in three phase AC systems - Part 3: Currents during two separate simultaneous line-to-earth short circuits and partial short-circuit currents flowing through earth; Corrigendum 1
  • IEC 61378-2:2001 Convertor transformers - Part 2: Transformers for HVDC applications
  • IEC TR 60919-2:2008+AMD1:2015 CSV Performance of high-voltage direct current (HVDC) systems with line-commutated converters - Part 2: Faults and switching
  • IEC 61936-1:2021 CMV Power installations exceeding 1 kV AC and 1,5 kV DC - Part 1: AC
  • IEC 61204-7:2006 Low-voltage power supplies, d.c. output - Part 7: Safety requirements
  • IEC 61046/AMD1:1995 D.C. or a.c. supplied electronic step-down convertors for filament lamps - General and safety requirements; Amendment 1
  • IEC 61788-1:2006 Superconductivity - Part 1: Critical current measurement - DC critical current of Nb-Ti composite superconductors
  • IEC 60924/AMD1:1993 D.C. supplied electronic ballasts for tubular fluorescent lamps; general and safety requirements; amendment 1
  • IEC 62477-2:2018 Safety requirements for power electronic converter systems and equipment - Part 2: Power electronic converters from 1000 V AC or 1500 V DC up to 36 kV AC or 54 kV DC
  • IEC 61788-1:1998 Superconductivity - Part 1: Critical current measurement - DC critical current of Cu/Nb-Ti composite superconductors
  • IEC 60534-2-1:2011/COR1:2015 Industrial-process control valves - Part 2-1: Flow capacity - Sizing equations for fluid flow under installed conditions
  • IEC 62024-2:2008 High frequency inductive components - Electrical characteristics and measuring methods - Part 2: Rated current of inductors for DC to DC converter
  • IEC 60924:1990 D.C. supplied electronic ballasts for tubular fluorescent lamps; general and safety requirements
  • IEC 60364-4-43:2008/COR1:2008 Low-voltage electrical installations - Part 4-43: Protection for safety - Protection against overcurrent
  • IEC 60364-4-43:2008 Low-voltage electrical installations - Part 4-43: Protection for safety - Protection against overcurrent
  • IEC 62932-2-2:2020 Flow battery energy systems for stationary applications - Part 2-2 Safety requirements
  • IEC 60364-4-43:2023 Low-voltage electrical installations - Part 4-43: Protection for safety - Protection against overcurrent
  • IEC 61788-2:1999 Superconductivity - Part 2: Critical current measurement - DC critical current of Nb<(Index)3>Sn composite superconductors
  • IEC 61660-1:1997/COR1:1999 Short-circuit currents in d.c. auxiliary installations in power plants and substations - Part 1: Calculation of short-circuit currents
  • IEC 61660-1:1997/COR2:2000 Short-circuit currents in d.c. auxiliary installations in power plants and substations - Part 1: Calculation of short-circuit currents
  • IEC 60898-2:2000+AMD1:2003 CSV Circuit-breakers for overcurrent protection for household and similar installations - Part 2: Circuit-breakers for a.c. and d.c. operation
  • IEC 61788-26:2020 Superconductivity - Part 26: Critical current measurement - DC critical current of RE-Ba-Cu-O composite superconductors
  • IEC TR2 60909-1:1991 Short-circuit current calculation in three-phase a.c. systems; part 1: factors for the calculation of short-circuit currents in three-phase a.c. systems according to IEC 909

TH-TISI, full flow partial flow

  • TIS 1551-2010 Household and similar electrical appliances.safety.part 2-60: particular requirements for whirlpool baths and whirlpool spas
  • TIS 885-2008 A.c. supplied electronic ballasts for fluorescent lamps: safety requirements
  • TIS 673.1-2010 Ballasts for high.pressure mercury vapour lamps.part 1: safety requirements

German Institute for Standardization, full flow partial flow

  • DIN EN 60335-2-60:2009 Household and similar electrical appliances - Safety - Part 2-60: Particular requirements for whirlpool baths and whirlpool spas (IEC 60335-2-60:2002 + A1:2004 + A2:2008); German version EN 60335-2-60:2003 + A1:2005 + A2:2008
  • DIN EN 62109-2:2012 Safety of power converters for use in photovoltaic power systems - Part 2: Particular requirements for inverters (IEC 62109-2:2011); German version EN 62109-2:2011
  • DIN EN IEC 61810-7-54:2022-10 All-or-nothing electrical relays - Tests and Measurements - Part 7-54: Critical DC load current test (IEC 94/566/CD:2021); Text in German and English / Note: Date of issue 2022-09-09
  • DIN EN 60146-2:2001 Semiconductor convertors - Part 2: Self-commutated semiconductor convertors including direct d.c. convertors (IEC 60146-2:1999); German version EN 60146-2:2000
  • DIN 30652-2:2022-09 Excess flow valves - Part 2: Excess flow valves for service lines / Note: This standard is part of the DVGW body of rules.
  • DIN 53019-4:2016 Rheometry - Measurement of rheological properties using rotational rheometers - Part 4: Oscillatory rheology
  • DIN 53019-4:2016-10 Rheometry - Measurement of rheological properties using rotational rheometers - Part 4: Oscillatory rheology
  • DIN EN 61204-7:2007 Low voltage power supplies, d.c. output - Part 7: Safety requirements (IEC 61204-7:2006); German version EN 61204-7:2006
  • DIN EN 1829-1:2021-04 High-pressure water jet machines - Safety requirements - Part 1: Machines; German version EN 1829-1:2021
  • DIN 30652-1:2021 Excess flow valves - Part 1: Excess flow valves for gas installation
  • DIN EN 60909-3:2010 Short-circuit currents in three-phase a.c. systems - Part 3: Currents during two separate simultaneous line-to-earth short-circuits and partial short-circuit currents flowing through earth (IEC 60909-3:2009); German version EN 60909-3:2010
  • DIN 41756-2:1973 Static power convertors; duty of power convertors, typers of d.c. load
  • DIN 30652-1:2021-06 Excess flow valves - Part 1: Excess flow valves for gas installation / Note: This standard is part of the DVGW body of rules.
  • DIN EN ISO 5667-6/A11:2022-04 Water quality - Sampling - Part 6: Guidance on sampling of rivers and streams (ISO 5667-6:2014); German version EN ISO 5667-6:2016/A11:2020
  • DIN EN ISO 5667-6:2016-12 Water quality - Sampling - Part 6: Guidance on sampling of rivers and streams (ISO 5667-6:2014); German version EN ISO 5667-6:2016
  • DIN 4754-2:2015 Heat transfer installations working with organic heat transfer fluids - Part 2: Draught diverter
  • DIN EN ISO 5167-5:2023-08 Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full - Part 5: Cone meters (ISO 5167-5:2022); German version EN ISO 5167-5:2022
  • DIN EN ISO 5167-6:2023-08 Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full - Part 6: Wedge meters (ISO 5167-6:2022); German version EN ISO 5167-6:2022
  • DIN EN ISO 9053-2:2021-02 Acoustics - Determination of airflow resistance - Part 2: Alternating airflow method (ISO 9053-2:2020); German version EN ISO 9053-2:2020
  • DIN EN ISO 9053-1:2019-03 Acoustics - Determination of airflow resistance - Part 1: Static airflow method (ISO 9053-1:2018); German version EN ISO 9053-1:2018
  • DIN 30652-3:2021 Excess flow valves - Part 3: Conformity assessment of excess flow valves for gas installation
  • DIN 30652-4:2022-09 Excess flow valves - Part 4: Conformity assessment of excess flow valves for service lines / Note: This standard is part of the DVGW body of rules.*Applies in conjunction with DIN 30652-2 (2022-09).
  • DIN 30652-3:2021-06 Excess flow valves - Part 3: Conformity assessment of excess flow valves for gas installation / Note: This standard is part of the DVGW body of rules.*Applies in conjunction with DIN 30652-1 (2021-06).
  • DIN EN 300132-3:2005 Environmental Engineering (EE) - Power supply interface at the input to telecommunications equipment - Part 3: Operated by rectified current source, alternating current source or direct current source up to 400 V (Endorsement of the English version EN 300
  • DIN ISO 4126-10:2019-10 Safety devices for protection against excessive pressure - Part 10: Sizing of safety valves for gas/liquid two-phase flow (ISO 4126-10:2010) / Note: To be replaced by DIN EN ISO 4126-10 (2021-07).
  • DIN EN ISO 5167-2:2004 Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full - Part 2: Orifice plates (ISO 5167-2:2003); German version EN ISO 5167-2:2003
  • DIN 41756-3:1975 Static power convertors; duty of power convertors, types of a.c. load
  • DIN EN 60534-2-1:2012-01 Industrial-process control valves - Part 2-1: Flow capacity - Sizing equations for fluid flow under installed conditions (IEC 60534-2-1:2011); German version EN 60534-2-1:2011 / Note: DIN EN 60534-2-1 (2000-03) and DIN EN 60534-2-1 Berichtigung 1 (2003...
  • DIN EN 60534-2-1 Berichtigung 1:2015-11 Industrial-process control valves - Part 2-1: Flow capacity - Sizing equations for fluid flow under installed conditions (IEC 60534-2-1:2011); German version EN 60534-2-1:2011, Corrigendum to DIN EN 60534-2-1:2012-01; (IEC-Cor.:2015 to IEC 60534-2-1:2011)
  • DIN IEC 60381-1:1985 Analogue signals for process control systems; direct current signals; identical with IEC 60381-1, edition 1982
  • DIN 4754-2:2015-03 Heat transfer installations working with organic heat transfer fluids - Part 2: Draught diverter
  • DIN 69901-2:2009-01 Project management - Project management systems - Part 2: Processes, process model
  • DIN 1342-1:2003 Viscosity - Part 1: Rheological concepts
  • DIN EN 16247-3:2023 Energy audits - Part 3: Processes
  • DIN 1342-2:2003 Viscosity - Part 2: Newtonian liquids
  • DIN EN 16247-3:2023-02 Energy audits - Part 3: Processes; German version EN 16247-3:2022 / Note: Applies in conjunction with DIN EN 16247-1 (2022-11).
  • DIN 1342-1:2003-11 Viscosity - Part 1: Rheological concepts

Korean Agency for Technology and Standards (KATS), full flow partial flow

  • KS C IEC 60335-2-60:2013 Household and similar electrical appliances-Safety-Part 2-60:Particular requirements for whirlpool baths and whirlpool spas
  • KS C IEC 60335-2-60:2007 Household and similar electrical appliances-Safety-Part 2-60:Particular requirements for whirlpool baths and whirlpool spas
  • KS C IEC 61881-3:2022 Railway applications — Fixed installations — Electrical safety, earthing and the return circuit — Part 3: Mutual interaction of a.c. and d.c. traction systems
  • KS C IEC 62128-3:2022 Railway applications — Fixed installations — Electrical safety, earthing and the return circuit — Part 3: Mutual interaction of a.c. and d.c. traction systems
  • KS C 1202-1995(2000) ALTERNATING CURRENT WATT-HOUR (ELECTRICAL ENERGY) METERS (TYPE-2 WHOLE CURRENT METERS)
  • KS C 1202-1965 ALTERNATING CURRENT WATT-HOUR (ELECTRICAL ENERGY) METERS (TYPE-2 WHOLE CURRENT METERS)
  • KS C 1202-1982 ALTERNATING CURRENT WATT-HOUR (ELECTRICAL ENERGY) METERS (TYPE-2 WHOLE CURRENT METERS)
  • KS C IEC 60909-0-2014(2019) Short-circuit currents in three-phase a.c. systems — Part 0: Calculation of currents
  • KS C IEC 60146-2-2002(2017) Semiconductor converters-Part 2:Self-commutated converters including direct d.c. converters
  • KS C IEC TS 61936-2:2020 Power installations exceeding 1 kV a.c. and 1.5 kV d.c. —Part 2: d.c.
  • KS C IEC 60146-2:2002 Semiconductor converters-Part 2:Self-commutated converters including direct d.c. converters
  • KS R ISO 26262-8:2012 Road vehicles-Functional safety-Part 8:Supporting processes
  • KS R ISO 26262-8:2015 Road vehicles — Functional safety — Part 8: Supporting processes
  • KS C IEC 61204-7:2014 Low-voltage power supplies, d.c. output — Part 7: Safety requirements
  • KS R ISO 4548-1-2002(2017) Methods of test for full-flow lubricating oil filters for internal combustion engines-Part 1:Differential pressure/flow characteristics
  • KS R ISO 4548-1-2002(2022) Methods of test for full-flow lubricating oil filters for internal combustion engines — Part 1: Differential pressure/flow characteristics
  • KS B ISO 5167-2-2014(2019) Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full — Part 2: Orifice plates
  • KS C IEC 60909-3:2020 Short-circuit currents in three-phase AC systems —Part 3: Currents during two separate simultaneous line-to-earth short circuits and partial short-circuit currents flowing through earth
  • KS C IEC 61204-7-2014(2019) Low-voltage power supplies, d.c. output — Part 7: Safety requirements
  • KS C 1705-1979(2018) SHUNTS
  • KS B ISO 5167-4:2020 Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full — Part 4: Venturi tubes
  • KS C IEC 60990:2003 Method of measurement of touch current and protective conductor current
  • KS I ISO 5667-6:2015 Water quality — Sampling — Part 6: Guidance on sampling of rivers and streams
  • KS I ISO 5667-6:2022 Water quality — Sampling — Part 6: Guidance on sampling of rivers and streams
  • KS A ISO 11933-5-2012(2017) Components for containment enclosures-Part 5:Penetrations for electrical and fluid circuits
  • KS B ISO 5167-1-2014(2019) Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full — Part 1: General principles and requirements
  • KS C 1705-1979 Shunts
  • KS A ISO 11933-5-2012(2022) Components for containment enclosures-Part 5:Penetrations for electrical and fluid circuits
  • KS X ISO/IEC 18033-4-2014(2019) Information technology — Security techniques — Encryption algorithms — Part 4: Stream ciphers
  • KS C IEC 60146-1-2-2002(2017) Semiconductor convertors-General requirements and line commutated convertors-Part 1-2:Application guide
  • KS C IEC 61378-2-2002(2017) Convertor transformers-Part 2:Transformers for HVDC applications
  • KS B ISO 5167-3-2014(2019) Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full — Part 3: Nozzles and Venturi nozzles
  • KS B ISO 5167-2:2004 Measurement of fluid flow by means of pressure differential devices inserted in circular-cross section conduits running full-Part 2:Orifice plates
  • KS B ISO 5167-2:2014 Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full — Part 2: Orifice plates
  • KS C IEC 61788-1:2009 Superconductivity-Part 1:Critical current measurement-DC critical current of Cu/Nb-Ti composite superconductors
  • KS C IEC 61788-1-2009(2020) Superconductivity-Part 1:Critical current measurement-DC critical current of Cu/Nb-Ti composite superconductors
  • KS C IEC 60534-2-1-2004(2009) Industrial-process control valves-Part 2-1:Flow capacity-Sizing equations for fluid flow under installed conditions
  • KS T 0007-2002 Safety marking for logistics equipments
  • KS J 0012-2010 Class II(laminar flow) biosafety cabinetry
  • KS T 0007-2002(2022) Safety marking for logistics equipments
  • KS T 0007-2002(2017) Safety marking for logistics equipments
  • KS C IEC 60364-4-43:2012 Low-voltage electrical installations-Part 4-43:Protection for safety-Protection against overcurrent
  • KS X ISO/IEC 29192-3:2014 Information technology — Security techniques — Lightweight cryptography — Part 3: Stream ciphers
  • KS C IEC 60364-4-43:2022 Low-voltage electrical installations — Part 4-43: Protection for safety — Protection against overcurrent
  • KS C IEC 60364-4-43-2012(2017) Low-voltage electrical installations-Part 4-43:Protection for safety-Protection against overcurrent
  • KS X ISO/IEC 29192-3-2014(2019) Information technology — Security techniques — Lightweight cryptography — Part 3: Stream ciphers
  • KS E ISO 13909-5-2005(2020) Hard coal and coke-Mechanical sampling-Part 5:Coke-Sampling from moving streams
  • KS C IEC 61660-1:2014 Short-circuit currents in d.c. auxiliary installations in power plants and substations — Part 1: Calculation of short-circuit currents
  • KS C IEC 61788-26:2022 Superconductivity — Part 26: Critical current measurement —DC critical current of RE-Ba-Cu-O composite superconductors
  • KS C IEC 60146-1-1-2002(2017) Semiconductor convertors-General requirements and line commutated convertors-Part 1-1:Specifications of basic requirements
  • KS S 1002-1-2010 Car rental services-Part 1:Process
  • KS S 2021-2-2012 Funeral home services-Part 2:Process
  • KS S 1008-1-2011 Convention services-Part 1:Process
  • KS S 2009-1-2011 Parcel delivery services-Part 1:Process
  • KS S 1005-1-2009 Security service for facilities-Part 1:Process
  • KS S 2035-1-2015 Theatre service — Part 1: Process
  • KS S 2034-1-2015 Mutual aid services — Part 1: Process
  • KS S 2026-2-2012(2022) Crematory services-Part 2:Process
  • KS S 2034-1-2015(2021) Mutual aid services — Part 1: Process
  • KS S 1003-1-2011(2021) Exhibition services-Part 1:Process
  • KS S 2005-1-2009(2019) Condominium service-Part 1:Process
  • KS S 2035-1-2015(2021) Theatre service — Part 1: Process

Danish Standards Foundation, full flow partial flow

  • DS/EN 50122-3:2011 Railway applications - Fixed installations - Electrical safety, earthing and the return circuit - Part 3: Mutual Interaction of a.c. and d.c. traction systems
  • DS/IEC 62128-3:2013 Railway applications - Fixed installations - Electrical safety, earthing and the return circuit - Part 3: Mutual interaction of a.c. and d.c. traction systems
  • DS/EN 60909-0:2003 Short-circuit currents in three-phase a.c. systems - Part 0: Calculation of currents
  • DS/EN 61204-7/A11:2009 Low voltage power supplies, d.c. output - Part 7: Safety requirements
  • DS/EN 61204-7:2007 Low voltage power supplies, d.c. output - Part 7: Safety requirements
  • DS/EN 1829-1:2010 High pressure water jet machines - Safety requirements - Part 1: Machines
  • DS/EN IEC 60974-13:2021 Arc welding equipment – Part 13: Welding current return clamp
  • DS/EN 60909-3:2010 Short-circuit currents in three-phase a.c systems - Part 3: Currents during two separate simultaneous line-to-earth short-circuits and partial short-circuit currents flowing through earth
  • DS/IEC TR 60909-4:2021 Short-circuit currents in three-phase AC systems – Part 4: Examples for the calculation of short-circuit currents
  • DS/ISO 5667-6:2007 Water quality - Sampling - Part 6: Guidance on sampling of rivers and streams
  • DS/EN 61788-2:2007 Superconductivity - Part 2: Critical current measurement - DC critical current of Nb3Sn composite superconductors
  • DS/ISO/IEC 18033-4:2012 Information technology - Security techniques - Encryption algorithms - Part 4: Stream ciphers
  • DS/EN 60928+A2:1994 A.C supplied electronic ballasts for tubular fluorescent lamps - General and safety requriements
  • DS/EN 61788-1:2007 Superconductivity - Part 1: Critical current measurement - DC critical current of Nb-Ti composite superconductors
  • DS/EN 60534-2-1:2011 Industrial-process control valves - Part 2-1: Flow capacity - Sizing equations for fluid flow under installed conditions
  • DS/IEC 292-1B:1982 Low-voltage motor starters - Part 1: Direct-on-line (Ful l voltage) a.c. starters
  • DS/HD 60364-4-43:2010 Low-voltage electrical installations - Part 4-43: Protection for safety - Protection against overcurrent

Lithuanian Standards Office , full flow partial flow

  • LST EN 50122-3-2011 Railway applications - Fixed installations - Electrical safety, earthing and the return circuit -- Part 3: Mutual Interaction of a.c. and d.c. traction systems
  • LST EN 61204-7-2007/A11-2009 Low voltage power supplies, d.c. output -- Part 7: Safety requirements
  • LST EN 1829-1-2021 High-pressure water jet machines - Safety requirements - Part 1: Machines
  • LST EN 1829-1-2010 High pressure water jet machines - Safety requirements - Part 1: Machines
  • LST EN 60909-0-2002 Short-circuit currents in three-phase AC systems. Part 0: Calculation of currents (IEC 60909-0:2001)
  • LST EN 60909-3-2010 Short-circuit currents in three-phase a.c systems -- Part 3: Currents during two separate simultaneous line-to-earth short-circuits and partial short-circuit currents flowing through earth (IEC 60909-3:2009)
  • LST EN 61204-7-2007 Low voltage power supplies, d.c. output -- Part 7: Safety requirements (IEC 61204-7:2006)

KR-KS, full flow partial flow

  • KS C IEC 62128-3-2022 Railway applications — Fixed installations — Electrical safety, earthing and the return circuit — Part 3: Mutual interaction of a.c. and d.c. traction systems
  • KS C IEC 61881-3-2022 Railway applications — Fixed installations — Electrical safety, earthing and the return circuit — Part 3: Mutual interaction of a.c. and d.c. traction systems
  • KS C IEC TS 61936-2-2020 Power installations exceeding 1 kV a.c. and 1.5 kV d.c. —Part 2: d.c.
  • KS C IEC 60909-3-2020 Short-circuit currents in three-phase AC systems —Part 3: Currents during two separate simultaneous line-to-earth short circuits and partial short-circuit currents flowing through earth
  • KS B ISO 5167-4-2020 Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full — Part 4: Venturi tubes
  • KS I ISO 5667-6-2015 Water quality — Sampling — Part 6: Guidance on sampling of rivers and streams
  • KS I ISO 5667-6-2022 Water quality — Sampling — Part 6: Guidance on sampling of rivers and streams
  • KS C IEC 60364-4-43-2022 Low-voltage electrical installations — Part 4-43: Protection for safety — Protection against overcurrent
  • KS C IEC 61788-26-2022 Superconductivity — Part 26: Critical current measurement —DC critical current of RE-Ba-Cu-O composite superconductors

AENOR, full flow partial flow

  • UNE-EN 50122-3:2011 Railway applications - Fixed installations - Electrical safety, earthing and the return circuit -- Part 3: Mutual Interaction of a.c. and d.c. traction systems
  • UNE-EN 60909-0:2002 Short-circuit currents in three-phase a.c. systems -- Part 0: Calculation of currents.
  • UNE-EN 61204-7:2007/A11:2010 Low voltage power supplies, d.c. output -- Part 7: Safety requirements
  • UNE-EN 1829-1:2010 High pressure water jet machines - Safety requirements - Part 1: Machines
  • UNE-EN 60909-3:2011 Short-circuit currents in three-phase a.c systems -- Part 3: Currents during two separate simultaneous line-to-earth short-circuits and partial short-circuit currents flowing through earth
  • UNE 21239-4:2002 IN Short-circuit currents in three-phase a.c. systems - Part 4: Examples for the calculation of short-circuit currents
  • UNE-HD 60364-4-43:2013 Low-voltage electrical installations -- Part 4-43: Protection for safety - Protection against overcurrent
  • UNE-EN 61204-7:2007 Low voltage power supplies, d.c. output -- Part 7: Safety requirements (IEC 61204-7:2006).
  • UNE-EN 16247-3:2014 Energy audits - Part 3: Processes

Standard Association of Australia (SAA), full flow partial flow

  • AS/NZS 60335.2.60:2006 Household and similar electrical appliances - Safety - Particular requirements for whirlpool baths and whirlpool spas(IEC 60335-2-60 Ed 3.1, MOD)
  • AS ISO 5167.5:2023 Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full, Part 5: Cone meters
  • AS ISO 5167.6:2023 Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full, Part 6: Wedge meters
  • IEC 60909-3:2009 RLV Short-circuit currents in three-phase AC systems — Part 3: Currents during two separate simultaneous line-to-earth short circuits and partial short-circuit currents flowing through earth
  • AS ISO 5167.2:2023 Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full, Part 2: Orifice plates

AT-OVE/ON, full flow partial flow

  • OVE EN 50122-3-2021 Railway applications - Fixed installations - Electrical safety, earthing and the return circuit - Part 3: Mutual Interaction of AC and DC traction systems (english version)

PK-PSQCA, full flow partial flow

IN-BIS, full flow partial flow

General Administration of Quality Supervision, Inspection and Quarantine of the People‘s Republic of China, full flow partial flow

  • GB/T 11826.2-2012 Current meter and flow meter.Part 2:Ultrasonic current meter
  • GB/T 8243.1-2003 Methods of test for full-flow lubricating oil filters for internal combustion engines--Part 1: Differential pressure/flow characteristics
  • GB/T 15544.1-2013 Short-circuit current calculation in three-phase a.c.systems.Part 1:Calculation of currents
  • GB/T 15544.1-2023 Short-circuit current calculations for three-phase AC systems Part 1: Current calculations
  • GB/T 26216.1-2010 DC current measuring device for HVDC transmission system.Part 1:Electronic DC current measuring device
  • GB/T 26216.2-2010 DC current measuring device for HVDC transmission system.Part 2:Electromagnetic DC current measuring device
  • GB/T 18494.2-2007 Covertor transformers Part 2: Transformers for HVDC applications
  • GB/T 15166.2-2008 High-voltage alternating-current fuses.Part 2:Current-limiting fuses
  • GB/T 15166.2-2023 High Voltage AC Fuses Part 2: Current Limiting Fuses
  • GB/T 18494.1-2001 Convertor transformers--Part 1: Transformers for industrial applications
  • GB/T 18494.1-2014 Converter transformers.Part 1:Transformers for industrial applications
  • GB/T 31593.5-2015 Fire safety engineering.Part 5:Requirements governing algebraic equations for fire plumes
  • GB/T 29840-2013 Vanadium flow battery.Terminology
  • GB 30439.5-2013 Safety requirements for industrial automation products.Part 5:Safety requirements for flowmeter
  • GB/T 31593.7-2015 Fire safety engineering.Part 7:Requirements governing algebraic equations for ceiling jet flows
  • GB/T 31593.8-2015 Fire safety engineering.Part 8:Requirements governing algebraic equations for vent flow
  • GB/T 25387.1-2010 Full-power converter of wind turbine generator system.Part 1:Technical condition
  • GB/T 16895.5-2012 Low-voltage electrical installations - Part 4-43: Protection for safety - Protection against overcurrent
  • GB 16895.5-2012 Low-voltage electrical installations.Part 4-43 Protection for safety.Protection against overcurrent
  • GB/T 25387.2-2010 Full-power converter of wind turbine generator system.Part 2:Test method
  • GB/T 32514.3-2016 Resistance welding.Welding current measurement for resistance welding.Part 3:Current sensing coil
  • GB/T 32514.2-2016 Resistance welding.Welding current measurement for resistance welding.Part 2:Welding current meter with current sensing coil
  • GB 5606.5-2005 Cigarettes-Part 5:Mainstream smoke

国家能源局, full flow partial flow

  • SY/T 7600-2020 Safety technical specifications for lightning current shunting of external floating roof oil tanks

ZA-SANS, full flow partial flow

  • SANS 61204-7:2008 Low-voltage power supplies, d.c. output Part 7: Safety requirements
  • SANS 60146-2:1999 Semiconductor converters Part 2: Self-commutated semiconductor converters including direct d.c. converters
  • SANS 61378-1:1997 Convertor transformers Part 1: Transformers for industrial applications
  • SANS 60146-6:1992 Semiconductor convertors Part 6: Application guide for the protection of semiconductor convertors against overcurrent by fuses

未注明发布机构, full flow partial flow

  • DIN EN ISO 5167-1:1995 Flow measurement of fluids with throttling devices Part 1: Orifices, nozzles and venturi tubes in full-flow lines with a circular cross-section
  • BS 6182-2:1982(2011) Intrinsically safe power supplies for use in coal mines — Part 2 : Specification for A.C. power supplies
  • BS 6182-1:1994(2011) Intrinsically safe power supplies for use in coal mines — Part 1 : Specification for D.C. power supplies
  • BS EN 60909-3:2010(2013) Short - circuit currents in three - phase a . c systems Part 3 : Currents during two separate simultaneous line - to - earth short - circuits and partial short - circuit currents flowing through earth
  • BS EN 60534-2-1:2011(2015) Industrial - process control valves - Part 2 - 1 : Flow capacity — Sizing equations for fluid flow under installed conditions

BE-NBN, full flow partial flow

VN-TCVN, full flow partial flow

  • TCVN 7576-1-2006 Methods of test for full-flow lubricating oil filters for internal combustion engines.Part 1: Differential pressure/flow characteristics
  • TCVN 7447-4-43-2010 Low-voltage electrical installations.Part 4-43: Protection for safety.Protection against overcurrent

Japanese Industrial Standards Committee (JISC), full flow partial flow

  • JIS C 8120-1:1999 A.C.-supplied electronic ballasts for fluorescent lamps -- Part 1: General and safety requirements
  • JIS E 5011-2:2009 Rolling stock -- Combined testing of power convertor with ac motors -- Part 2: Convertor-inverter system with intermediate dc link
  • JIS C 7620-1:2000 Self-ballasted lamps for general lighting service -- Part 1: Safety requirement
  • JIS C 7620-1:2010 Self-ballasted fluorescent lamps for general lighting service -- Part 1: Safety specifications
  • JIS C 7620-1:2017 Self-ballasted fluorescent lamps for general lighting service -- Part 1: Safety specifications
  • JIS C 1721:1976 Shunts
  • JIS H 7302:2000 Superconductivity -- Part 2: Critical current measurement -- DC critical current of Nb3Sn composite superconductors
  • JIS C 8118-1:1999 Ballasts for tubular fluorescent lamps -- Part 1: General and safety requirements
  • JIS C 60364-4-43:2011 Low-voltage electrical installations -- Part 4-43: Protection for safety -- Protection against overcurrent
  • JIS B 8390-1:2016 Pneumatic fluid power -- Determination of flow-rate characteristics of components using compressible fluids -- Part 1: General rules and test methods for steady-state flow
  • JIS H 7302:2009 Superconductivity -- Part 2: Critical current measurement -- DC critical current of Nb3Sn composite superconductors
  • JIS Z 8762-2:2007 Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full -- Part 2: Orifice plates
  • JIS C 8120-2:1999 A.C.-supplied electronic ballasts for fluorescent lamps -- Part 2: Performance requirements
  • JIS E 5008:2009 Rolling stock -- Power convertors installed on board rolling stock
  • JIS H 7301:2009 Superconductivity -- Part 1: Critical current measurement -- DC critical current of Nb-Ti composite superconductors

US-VA, full flow partial flow

US-FCR, full flow partial flow

ESDU - Engineering Sciences Data Unit, full flow partial flow

  • ESDU 93018 A-1998 FORCED CONVECTION HEAT TRANSFER IN STRAIGHT TUBES PART 2: LAMINAR AND TRANSITIONAL FLOW
  • ESDU 93018 B-2001 Forced convection heat transfer in straight tubes. Part 2: laminar and transitional flow.
  • ESDU 92003 A-1993 Forced convection heat transfer in straight tubes. Part 1: turbulent flow.
  • ESDU 16005-2017 Mass Flow Rate of a Leak into an External Stream
  • A1-2009 FLUID MECHANICS@ INTERNAL FLOW SERIES:TITLES Issue 6

ES-UNE, full flow partial flow

  • UNE-EN 60909-0:2016 Short-circuit currents in three-phase a.c. systems - Part 0: Calculation of currents (Endorsed by AENOR in August of 2016.)
  • UNE-EN 1829-1:2021 High-pressure water jet machines - Safety requirements - Part 1: Machines
  • UNE-EN ISO 5167-5:2016 Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full - Part 5: Cone meters (ISO 5167-5:2016)
  • UNE-EN ISO 5167-6:2021 Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full - Part 6: Wedge meters (ISO 5167-6:2019)
  • UNE-EN ISO 5667-6:2017/A11:2021 Water quality - Sampling - Part 6: Guidance on sampling of rivers and streams (ISO 5667-6:2014)
  • UNE-EN ISO 5167-5:2023 Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full - Part 5: Cone meters (ISO 5167-5:2022)
  • UNE-EN ISO 9053-1:2020 Acoustics - Determination of airflow resistance - Part 1: Static airflow method (ISO 9053-1:2018)
  • UNE-EN ISO 9053-2:2021 Acoustics - Determination of airflow resistance - Part 2: Alternating airflow method (ISO 9053-2:2020)
  • UNE-EN 60071-5:2015 Insulation co-ordination - Part 5: Procedures for high-voltage direct current (HVDC) converter stations
  • HD 60364-4-43:2023 Low-voltage electrical installations - Part 4-43: Protection for safety - Protection against overcurrent
  • UNE-EN 60534-2-1:2011/AC:2015 Industrial-process control valves - Part 2-1: Flow capacity - Sizing equations for fluid flow under installed conditions (Endorsed by AENOR in June of 2015.)
  • UNE-EN 60534-2-1:2011 Industrial-process control valves - Part 2-1: Flow capacity - Sizing equations for fluid flow under installed conditions (Endorsed by AENOR in September of 2011.)
  • UNE-EN IEC 61788-26:2020 Superconductivity - Part 26: Critical current measurement - DC critical current of RE-Ba-Cu-O composite superconductors (Endorsed by Asociación Española de Normalización in October of 2020.)
  • UNE-EN 16247-3:2023 Energy audits - Part 3: Processes

Professional Standard - Machinery, full flow partial flow

International Telecommunication Union (ITU), full flow partial flow

CENELEC - European Committee for Electrotechnical Standardization, full flow partial flow

  • EN 60909-3:2003 Short-circuit currents in three-phase a.c systems - Part 3: Currents during two separate simultaneous line-to-earth short circuits and partial short-circuit currents flowing through earth
  • EN 61046:1994 D.C. or a.c. Supplied Electronic Step-Down Convertors for Filament Lamps - General and Safety Requirements
  • EN 61788-2:1999 Superconductivity Part 2: Critical current measurement - DC critical current of Nb3Sn composite superconductors
  • EN 60534-2-2:1993 Industrial-Process Control Valves Part 2: Flow Capacity - Section Two - Sizing Equations for Compressible Fluid Flow Under Installed Conditions
  • EN 60534-2-1:1993 Industrial-Process Control Valves Part 2: Flow Capacity - Section One: Sizing Equations for Incompressible Fluid Flow Under Installed Conditions
  • EN 61788-1:1998 Superconductivity Part 1: Critical Current Measurement DC Critical Current of Cu/Nb-Ti Composite Superconductors
  • EN 60928:1995 Auxiliaries for lamps - A.C. supplied electronic ballasts for tubular fluorescent lamps - General and safety requirements (Incorporates Amendment A1: 1999)
  • EN 60928:1994 A.C. Supplied Electronic Ballasts for Tubular Fluorescent Lamps - General and Safety Requirements
  • EN 61046:1994/A1:1994 D.C. or a.c. Supplied Electronic Step-Down Convertors for Filament Lamps - General and Safety Requirements (Incorporates Amendment A1: 1996)
  • EN 61046:1992/A1:1992 AMD 1 D.C. or a.c Supplied Electronic Step-Down Convertors for Filament Lamps - General and Safety Requirements

ASHRAE - American Society of Heating@ Refrigerating and Air-Conditioning Engineers@ Inc., full flow partial flow

  • ASHRAE NY-08-041-2008 Balcony Spill Plumes: Full-Scale Experiments@ Part 2 (RP-1247)
  • ASHRAE NY-08-039-2008 Balcony Spill Plumes: Full-Scale Experiments@ Part 1 (RP-1247)
  • ASHRAE 4541-2002 Convective Heat Transfer from In-Tube Flow of Turbulent Supercritical Carbon Dioxide: Part 1 - Numerical Analysis (RP-913)
  • ASHRAE DA-07-044-2007 Analysis of Airflow in a Full-Scale Room with Non-Isothermal Jet Ventilation Using PTV Techniques

IT-UNI, full flow partial flow

PL-PKN, full flow partial flow

CEN - European Committee for Standardization, full flow partial flow

  • PREN 1829-1-2018 High-pressure water jet machines - Safety requirements - Part 1: Machines
  • EN ISO 9053-1:2018 Acoustics - Determination of airflow resistance - Part 1: Static airflow method

RU-GOST R, full flow partial flow

  • GOST IEC 61204-7-2014 Low-voltage power supplies, d.c. output. Part 7. Safety requirements
  • GOST R ISO 4548-1-2009 Methods of test for full-flow lubricating oil filters for internal combustion engines. Part 1. Differential pressure/flow characteristics
  • GOST R 50571.4.43-2012 Low-voltage electrical installations. Part 4-43. Protection for safety. Protection against overcurrent
  • GOST R 56715.2-2015 Project management. Project management systems. Part 2. Processes, process model

International Organization for Standardization (ISO), full flow partial flow

  • ISO 26262-8:2018 Road vehicles — Functional safety — Part 8: Supporting processes
  • ISO/DTR 21044-2 Hydrometry — Stream gauging — Part 2: Computation of discharge
  • ISO 9053-2:2020 Acoustics — Determination of airflow resistance — Part 2: Alternating airflow method
  • ISO 9053-1:2018 Acoustics — Determination of airflow resistance — Part 1: Static airflow method
  • ISO 1100-2:1982 Liquid flow measurement in open channels — Part 2: Determination of the stage-discharge relation
  • ISO 1100-2:1998 Measurement of liquid flow in open channels - Part 2: Determination of the stage-discharge relation
  • ISO 3354:2008 Measurement of clean water flow in closed conduits - Velocity-area method using current-meters in full conduits and under regular flow conditions
  • ISO 5167-3:2020 Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full — Part 3: Nozzles and Venturi nozzles
  • ISO 5167-5:2016 Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full - Part 5: Cone meters
  • ISO/IEC 29192-3:2012 Information technology - Security techniques - Lightweight cryptography - Part 3: Stream ciphers
  • ISO 3219-2:2021 Rheology - Part 2: General principles of rotational and oscillatory rheometry
  • ISO 17657-2:2005 Resistance welding - Welding current measurement for resistance welding - Part 2: Welding current meter with current sensing coil

Taiwan Provincial Standard of the People's Republic of China, full flow partial flow

Underwriters Laboratories (UL), full flow partial flow

Group Standards of the People's Republic of China, full flow partial flow

  • T/WD 114-2021 Potatoes circulation — Part 3: Specification for logistics management
  • T/CAS 259-2016 The Services Specification for The Whole Intelligent Logistics of Household Awkward Cargo Process
  • T/HEBQIA 183-2023 Fully automatic logistics seedbed
  • T/CSEE 241.30-2021 Flexible DC Grid Part 30: Guidelines for Maintenance of Converter Stations
  • T/SHBX 006-2023 Biodegradable casting film
  • T/CATAGS 22.2-2020 Specifications for information exchange in air cargo transport Part2:Process data
  • T/CATAGS 22.1-2020 Specifications for information exchange in air cargo transport Part1: Information process
  • T/CECS 1326-2023 Full flow penetrating test standard
  • T/CSEE 0276-2021 Technical Specifications for Harmonic Analysis of AC-side Grid of DC Transmission Converter Station

Indonesia Standards, full flow partial flow

  • SNI 04-3888.1-1995 Safety requirements of fans and its regulators - Part 1: Fans and regulators for household and similar appliances
  • SNI 05-6047.3-1999 Heat exchanger - Method for parameter measurement for performance determination. Part 3: Fluid flow velocity
  • SNI IEC 60909-3:2011

National Metrological Verification Regulations of the People's Republic of China, full flow partial flow

American National Standards Institute (ANSI), full flow partial flow

中华人民共和国国家质量监督检验检疫总局、中国国家标准化管理委员会, full flow partial flow

  • GB/T 34866-2017 Vanadium flow battery—Safety requirements
  • GB/T 15544.5-2017 Short-circuit current calculation in three-phase a.c.systems—Part 5: Examples
  • GB/T 15544.2-2017 Short-circuit current calculation in three-phase a.c. systems—Part 2: Factors for the calculation of short-circuit currents
  • GB/T 15544.4-2017 Short-circuit current calculation in three-phase a.c.systems—Part 4: Currents during two separate simultaneous line-to-earth short circuits and partial short-circuit currents flowing through earth
  • GB/T 34041.2-2017 Measurement of fluid flow in closed conduits—Ultrasonic meters for gas—Part 2: Meters for industrial applications
  • GB/T 34041.1-2017 Measurement of fluid flow in closed conduits—Ultrasonic meters for gas—Part 1: Meters for custody transfer and allocation measurement
  • GB/T 35702.2-2017 Power losses in voltage sourced converter (VSC) valves for high-voltage direct current (HVDC) systems—Part 2: Modular multilevel converters

CZ-CSN, full flow partial flow

  • CSN ISO 5667-6:1994 Water quality. Sampling. Part 6: Guidance on sampling of rivers and streams
  • CSN P 72 2081-12-2001 Fluidized bed ash and fluidized fly ash combustion for building industry purposes - Part 12: Fluidized bed ash and fluidized fly ash combustion for building of roadways
  • CSN P 72 2081-15-2001 Fluidized bed ash and fluidized fly ash combustion for building industry purposes - Part 15: Fluidized bed ash and fluidized fly ash combustion for the mineral wool production
  • CSN P 72 2081-11-2001 Fluidized bed ash and fluidized fly ash combustion for building industry purposes - Part 11: Fluidized bed ash and fluidized fly ash combustion for other utilisation
  • CSN P 72 2081-16-2001 Fluidized bed ash and fluidized fly ash combustion for building industry purposes - Part 16: Fluidized bed ash and fluidized fly ash combustion for the bituminous products
  • CSN P 72 2081-14-2001 Fluidized bed ash and fluidized fly ash combustion for building industry purposes - Part 14: Fluidized bed ash and fluidized bed fly ash combustion for the burned brick products
  • CSN P 72 2081-13-2001 Fluidized bed ash and fluidized fly ash combustion for building industry purposes - Part 13: Fluidized bed ash and fluidized fly ash combustion for the production of binding materials
  • CSN P 72 2081-1-2001 Fluidized bed ash and fluidized fly ash combustion for building industry purposes - Part 1: Fluidized bed ash and fluidized fly ash combustion for the ligh-weight fly mixture
  • CSN P 72 2081-4-2001 Fluidized bed ash and fluidized fly ash combustion for building industry purposes - Part 4: Fluidized bed ash and fluidized fly ash combustion for the aerated concrete product
  • CSN P 72 2081-2-2001 Fluidized bed ash and fluidized fly ash combustion for building industry purposes - Part 2: Fluidized bed ash and fluidized fly ash combustion for dry mixed production
  • CSN P 72 2081-10-2001 Fluidized bed ash and fluidized fly ash combustion for building industry purposes - Part 10: Fluidized bed ash and fluidized fly ash combustion for the production of special bonding agents

NZ-SNZ, full flow partial flow

  • AS/NZS 5667.6:1998 Water Quality - Sampling Part 6: Guidance on Sampling of Rivers and Streams

European Committee for Standardization (CEN), full flow partial flow

  • EN ISO 5167-2:2022 Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full - Part 2: Orifice plates (ISO 5167-2:2022)
  • EN 61046:1992 D.C. or A.C. supplied electronic step-down convertors for filament lamps; general and safety requirements (IEC 1046:1991)
  • EN ISO 9053-2:2020 Acoustics - Determination of airflow resistance - Part 2: Alternating airflow method (ISO 9053-2:2020)
  • EN ISO 5167-5:2016 Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full - Part 5: Cone meters (ISO 5167-5:2016)
  • EN ISO 5167-5:2022 Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full - Part 5: Cone meters (ISO 5167-5:2022)
  • EN ISO 3219-2:2021 Rheology - Part 2: General principles of rotational and oscillatory rheometry (ISO 3219-2:2021)
  • EN ISO 17657-2:2007 Resistance welding - Welding current measurement for resistance welding - Part 2: Welding current meter with current sensing coil

CO-ICONTEC, full flow partial flow

US-RTCA, full flow partial flow

NL-NEN, full flow partial flow

  • NEN 11046-1993 D.C.or a.c. supplied electronic step-down convertors for filament lamps. General and safety requirements (IEC 1046:1991)
  • NEN 11047-1993 D.C. or a.c. supplied electronic step-down convertors for filament lamps. Performance requirements (IEC 1047:1991)

Professional Standard - Medicine, full flow partial flow

  • YY/T 1287.3-2016 Intracranial external drainage system.Part 3:Intracranial external drainage catheter

Professional Standard - Electricity, full flow partial flow

  • DL/T 1981.4-2021 Unified Power Flow Controller Part 4: Converter Specifications
  • DL/T 1472.1-2015 Post insulators for DC field of converter stations Part 1: Specifications
  • DL/T 1572.1-2016 Short-circuit current in DC auxiliary power systems in substations and power plants_Part 1_Short-circuit current calculation

Jiangxi Provincial Standard of the People's Republic of China, full flow partial flow

  • DB36/T 1344.2-2020 Comprehensive control of water and soil loss in small watersheds Part 2: Rating norms for ecologically clean small watersheds

工业和信息化部, full flow partial flow

  • JB/T 13620.2-2018 Plastic Injection Mold Hot Runner System Components Part 2: Hot Runner Plate
  • JB/T 13620.4-2018 Plastic injection mold hot runner system components Part 4: Hot runner sprue sleeve
  • JB/T 13620.5-2018 Plastic injection mold hot runner system components Part 5: Runner plate positioning ring

Canadian Standards Association (CSA), full flow partial flow

  • CAN/CSA-ISO/IEC 18033-4:2013 Information technology - Security techniques - Encryption algorithms - Part 4: Stream ciphers
  • CSA C381.1-08-2008 Test method for calculating the energy efficiency of single-voltage external ac-dc and ac-ac power supplies First Edition

ANSI - American National Standards Institute, full flow partial flow

HU-MSZT, full flow partial flow

Instrument Society of America (ISA), full flow partial flow

  • ISA 75.01.01-2012 Industrial-Process Control Valves - Part 2-1: Flow capacity - Sizing equations for fluid flow under installed conditions

(U.S.) Ford Automotive Standards, full flow partial flow

PH-BPS, full flow partial flow

  • PNS IEC 60364-4-43:2021 Low-voltage electrical installations - Part 4-43: Protection for safety - Protection against overcurrent

Liaoning Provincial Standard of the People's Republic of China, full flow partial flow

  • DB21/T 1813.8-2010 Fire Safety Capacity Building of Social Units Part 8: Warehousing and Logistics

IEEE - The Institute of Electrical and Electronics Engineers@ Inc., full flow partial flow

  • IEEE 316-1971 STANDARD REQUIREMENTS FOR DIRECT CURRENT INSTRUMENT SHUNTS

Association of German Mechanical Engineers, full flow partial flow

National Information Standard Organization, full flow partial flow

IEC - International Electrotechnical Commission, full flow partial flow

  • TS 60071-5-2002 Insulation co-ordination - Part 5: Procedures for high-voltage direct current (HVDC) converter stations (Edition 1.0)

Shandong Provincial Standard of the People's Republic of China, full flow partial flow

  • DB37/ 3416.4-2018 Integrated Discharge Standard of Water Pollutants in River Basins Part 4: Haihe River Basin
  • DB37/ 3416.5-2018 Comprehensive Discharge Standard of Water Pollutants in Basin Part 5: Peninsula Basin

ETSI - European Telecommunications Standards Institute, full flow partial flow

  • ETSI EN 300 132-3-1:2012 Environmental Engineering (EE); Power supply interface at the input to telecommunications and datacom (ICT) equipment; Part 3: Operated by rectified current source@ alternating current source or direct current source up to 400 V; Sub-part 1: Direct curren
  • ETSI EN 300 132-3-1:2011 Environmental Engineering (EE); Power supply interface at the input to telecommunications and datacom (ICT) equipment; Part 3: Operated by rectified current source@ alternating current source or direct current source up to 400 V; Sub-part 1: Direct curren

Professional Standard - Water Conservancy, full flow partial flow

  • SL/T 200.11-1997 The government administration information codes and coding regulation for the water departments

  full flow partial flow.

 




Copyright ©2007-2023 ANTPEDIA, All Rights Reserved