ZH

KR

JP

ES

RU

DE

Orifice flowmeter installation requirements

Orifice flowmeter installation requirements, Total:53 items.

In the international standard classification, Orifice flowmeter installation requirements involves: Measurement of fluid flow, Hand-held tools, Equipment for petroleum and natural gas industries, Mechanical structures for electronic equipment, Shipbuilding and marine structures in general, Installations in buildings, Electrical and electronic testing, Industrial automation systems, Printed circuits and boards, Postal services, Electronic component assemblies, Elements of buildings, Rubber and plastics products.


API - American Petroleum Institute, Orifice flowmeter installation requirements

  • API MPMS 14.3.2-2016 Orifice Metering of Natural Gas and Other Related Hydrocarbon Fluids - Concentric@ Square‐edged Orifice Meters Part 2: Specification and Installation Requirements (Fifth Edition; ERTA 1: March 2017; ERTA 2: January 2019)
  • API MPMS 14.3.2-2000 Manual of Petroleum Measurement Standards Chapter 14 - Natural Gas Fluids Measurement; Section 3 - Concentric@ Square-Edged Orifice Meters; Part 2 - Specification and Installation Requirements (Fourth Edition; AGA Report No.3@ Part 2 and GPA 8185-00@ Part
  • API MPMS 14.3.2-1991 Manual of Petroleum Measurement Standards Chapter 14 - Natural Gas Fluids Mst. Section 3 - Concentric@ Square-Edged Orifice Meters Part 2 - Spec. and Installation Requirements (AGA Report No. 3@ Part 2 and GPA 8185-90@ Part 2)

American Gas Association, Orifice flowmeter installation requirements

  • AGA REPORT 3-2-2000 ORIFICE METERING OF NATURAL GAS AND OTHER RELATED HYDROCARBON FLUIDS PART 2 Specification and Installation Requirements (Fourth Edition; XQ0002; 2nd Printing June 2003)
  • AGA REPORT 3-2-2016 Orifice Metering of Natural Gas and Other Related Hydrocarbon Fluids Part: 2 Specification and Installation Requirements (Fifth Edition; XQ1601)

Henan Provincial Standard of the People's Republic of China, Orifice flowmeter installation requirements

ISA - International Society of Automation, Orifice flowmeter installation requirements

  • ISA RP3.2-1978 FLANGE MOUNTED SHARP EDGED ORIFICE PLATES FOR FLOW MEASUREMENT

Group Standards of the People's Republic of China, Orifice flowmeter installation requirements

  • T/ZGWJHXH 42-2020 Safety Technology of Welded Orifice Plate Flowmeter for Pressure Gathering in Annular Chamber

RU-GOST R, Orifice flowmeter installation requirements

  • GOST 8.586.2-2005 State system for ensuring the uniformity of measurements. Measurement of liquids and gases flow rate and quantity by means of orifice instruments. Part 2. Orifice plates. Technical requirements
  • GOST R IEC 61191-3-2010 Printed boards assemblies. Part 3. Sectional specification. Requirements for through-hole mount soldered assemblies
  • GOST 23662-1979 Printed circuit boards. Production of blanks, location and technological holes. Requirements for standard technological processes
  • GOST R 50193.2-1992 Measurement of water flow in closed conduits. Meters for cold potable water. Installation requirements
  • GOST 23664-1979 Printed circuit boards. Production of mounting and plated through holes. Requirements for standard technological processes

International Organization for Standardization (ISO), Orifice flowmeter installation requirements

  • ISO 5167-2:2003 Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full - Part 2: Orifice plates
  • ISO 7858-2:1987 Measurement of water flow in closed conduits; Meters for cold potable water; Combination meters; Part 2 : Installation requirements
  • ISO 4064-2:1978 Measurement of water flow in closed conduits; Meters for cold potable water; Part II : Installation requirements

General Administration of Quality Supervision, Inspection and Quarantine of the People‘s Republic of China, Orifice flowmeter installation requirements

  • GB/T 2624.2-2006 Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full Part 2: Orifice plates
  • GB/T 9109.2-2014 Dynamic measurement of petroleum and liquid petroleum products.Part 2:Technical requirements of meter installation
  • GB/T 19247.3-2003 Printed board assemblies--Part 3:Sectional specification-Requirements for through-hole mount soldered assemblies
  • GB 30439.5-2013 Safety requirements for industrial automation products.Part 5:Safety requirements for flowmeter

Professional Standard - Aerospace, Orifice flowmeter installation requirements

  • QJ 20023-2011 Design requirements for high-reliability surface mount circuit assemblies

European Committee for Electrotechnical Standardization(CENELEC), Orifice flowmeter installation requirements

  • EN 61191-3:2017 Printed board assemblies - Part 3: Sectional specification - Requirements for through-hole mount soldered assemblies
  • EN 61191-3:1998 Printed Board Assemblies Part 3: Sectional Specification Requirements for Through-Hole Mount Soldered Assemblies

Professional Standard-Ships, Orifice flowmeter installation requirements

  • CB/T 3520-1994 Requirements for installation and structural design of deck machinery base

British Standards Institution (BSI), Orifice flowmeter installation requirements

  • BS EN 61191-3:1999 Printed board assemblies - Sectional specification - Requirements for through-hole mount soldered assemblies
  • BS EN 61191-3:2017 Printed board assemblies. Sectional specification. Requirements for through-hole mount soldered assemblies
  • BS 4592-0:2006 Industrial type flooring and stair treads - Common design requirements and recommendations for installation

Indonesia Standards, Orifice flowmeter installation requirements

  • SNI 19-4201-1996 Measurement of water flow in closed conduits. Meter for cold potable water. Part 2 : Installation requirements

Association Francaise de Normalisation, Orifice flowmeter installation requirements

  • NF D27-408:2004 Letter boxes with reduced capacity and with large opening for outdoor installation - Requirements and testing.
  • NF C90-705*NF EN 61191-3:2017 Printed board assemblies - Part 3 : sectional specification - Requirements for through-hole mount soldered assemblies

Korean Agency for Technology and Standards (KATS), Orifice flowmeter installation requirements

  • KS B ISO 4064-2:2002 Measurement of water flow in closed conduits-Meters for cold potable water-Part 2:Installation requirements and selection
  • KS B ISO 7858-2:2014 Measurement of water flow in closed conduits-Combination meters for cold potable water-Part 2:Installation requirements
  • KS B ISO 7858-2:2004 Measurement of water flow in closed conduits-Combination meters for cold potable water-Part 2:Installation requirements
  • KS B ISO 7858-2:2015 Measurement of water flow in closed conduits — Combination meters for cold potable water — Part 2: Installation requirements
  • KS C IEC 61191-3:2021 Printed board assemblies — Part 3: Sectional specification —Requirements for through-hole mount soldered assemblies
  • KS C IEC 61191-3-2006(2016) Printed board assemblies-Part 3:Sectional specification-Requirements for through-hole mount soldered assemblies

KR-KS, Orifice flowmeter installation requirements

  • KS B ISO 7858-2-2014 Measurement of water flow in closed conduits — Combination meters for cold potable water — Part 2: Installation requirements
  • KS C IEC 61191-3-2021 Printed board assemblies — Part 3: Sectional specification —Requirements for through-hole mount soldered assemblies

Professional Standard - Petroleum, Orifice flowmeter installation requirements

  • SY/T 6999-2014 General requirements for flow meters on-line verification with a traveling gas flow standard facility
  • SY 6999-2014 General requirements for on-line verification of flowmeters with mobile gas flow standard devices

International Federation of Trucks and Engines, Orifice flowmeter installation requirements

Danish Standards Foundation, Orifice flowmeter installation requirements

  • DS/EN 61191-3:1999 Printed board assemblies - Part 3: Sectional specification - Requirements for through-hole mount soldered assemblies

GOSTR, Orifice flowmeter installation requirements

  • GOST R IEC 61191-3-2019 Printed board assemblies. Part 3. Tеchnical requirements. Through-hole mount soldered assemblies

German Institute for Standardization, Orifice flowmeter installation requirements

  • DIN EN 61191-3:2018-05 Printed board assemblies - Part 3: Sectional specification - Requirements for through-hole mount soldered assemblies (IEC 61191-3:2017); German version EN 61191-3:2017 / Note: DIN EN 61191-3 (1999-06) remains valid alongside this standard until 2020-07...

ES-UNE, Orifice flowmeter installation requirements

  • UNE-EN 61191-3:2017 Printed board assemblies - Part 3: Sectional specification - Requirements for through-hole mount soldered assemblies (Endorsed by Asociación Española de Normalización in October of 2017.)

GSO, Orifice flowmeter installation requirements

  • BH GSO IEC 61191-3:2016 Printed board assemblies - Part 3: Sectional specification - Requirements for through-hole mount soldered assemblies
  • OS GSO IEC 61191-3:2014 Printed board assemblies - Part 3: Sectional specification - Requirements for through-hole mount soldered assemblies

SCC, Orifice flowmeter installation requirements

  • CEI EN 61191-3:2018 Printed board assemblies Part 3: Sectional specification - Requirements for through-hole mount soldered assemblies
  • DANSK DS/EN 61191-3:2017 Printed board assemblies – Part 3: Sectional specification – Requirements for through-hole mount soldered assemblies

工业和信息化部, Orifice flowmeter installation requirements

  • YD/T 3482-2019 Technical requirements for application security audit based on mobile network traffic

Standard Association of Australia (SAA), Orifice flowmeter installation requirements

  • AS 2424:1991 Plastics building sheets - General installation requirements and design of roofing systems




Copyright ©2007-2023 ANTPEDIA, All Rights Reserved