ZH

RU

ES

Preparation of the 14th Five-Year Plan Requirements

Preparation of the 14th Five-Year Plan Requirements, Total:9 items.

In the international standard classification, Preparation of the 14th Five-Year Plan Requirements involves: Equipment for petroleum and natural gas industries, Services, Electronic components in general.


Professional Standard - Petroleum, Preparation of the 14th Five-Year Plan Requirements

  • SY/T 6436-2000 Technical requirement for establishment of natural gas development plan
  • SY/T 6436-2012 Technical requirement for establishment of natural gas development plan
  • SY 6436-2012 Technical Requirements for Compilation of Natural Gas Development Planning

Guangdong Provincial Standard of the People's Republic of China, Preparation of the 14th Five-Year Plan Requirements

  • DB44/T 2145-2018 General requirements for the planning of modern agricultural parks

Military Standard of the People's Republic of China-General Armament Department, Preparation of the 14th Five-Year Plan Requirements

  • GJB 5432-2006(XG1-2015) Equipment User Technical Data Planning and Compilation Requirements Modification Sheet 1-2015

国家能源局, Preparation of the 14th Five-Year Plan Requirements

  • NB/T 10373-2019 Basic requirements for the preparation of green mine construction planning for underground coal mine mining

Professional Standard - Electron, Preparation of the 14th Five-Year Plan Requirements

  • SJ 1.4-1987 Stages-division and requirements for implementation of standards-preparation in electronic industry
  • SJ 1.1-1987 Major procedures and requirements for working out of annual plans relating to technical standards in electronic industry
  • SJ 1.2-1987 Provision and requirements for preparation and revision of technical standards for electronic industry--Principles and procedures for regulation of standards-preparation plans




Copyright ©2007-2023 ANTPEDIA, All Rights Reserved