共找到 663 条与 钢轨和线路构件 相关的标准,共 45 页
This document specifies requirements concerning the approval and/or homologation of welding processes, contractors, welders, inspectors and acceptance of welded joints in the factory and/or track. This document is applicable to the following rail welding processes: a) flash butt welding (FBW); b) gas pressure welding (GPW); c) aluminothermic welding (ATW); d) enclosed arc welding (EAW). In this document, 43 kg/m to 75 kg/m new flat-bottomed rails of the same profiles and same steel grades are used as the subject of welding. This document does not specify requirements or test methods specific to each welding process. These are to be prescribed in the subsequent parts of the ISO 23300 series. Concerning butt welding, this document is restricted to connecting rail ends. This document does not cover the welding for construction of crossings, railway switches, signal bond installation or restoration of rails. This document does not cover any safety regulations for welding operations. In this document, the qualifications of individuals and organizations that are approved by the railway authority for rail welding are not specified.
Railway infrastructure — Rail welding — Part 1: General requirements and test methods for rail welding
Railway infrastructure - Rail fastening systems - Part 7: Test method for clamping force and uplift stiffness
Inspection regulations for imported rail steel
Railway infrastructure – Rail fastening systems – Part 5: Test method for electrical resistance
Railway applications - Wheel/Rail friction management - Part 2-2: Properties and Characteristics - Top of Rail materials
This document specifies a laboratory test procedure for determining the electrical resistance, in wet conditions, between the running rails provided by a fastening system fitted to a steel or concrete sleeper, bearer or element of ballastless track. It is also applicable to embedded rail. This test procedure applies to a complete fastening assembly. It is relevant to signalling currents, not to traction currents. A reference procedure and an alternative procedure are included.
Railway infrastructure - Rail fastening systems - Part 5: Test method for electrical resistance
Railway applications -- Track -- Acceptance of works -- Part 2: Acceptance of reprofiling rails in plain line, switches, crossings and expansion devices
Railway applications - Wheel/Rail friction management - Part 2-2: Properties and Characteristics - Top of Rail materials
Railway applications - Wheel/Rail friction management - Part 1-2: Equipment and Application - Top of Rail materials
Railway applications - Wheel/Rail friction management - Part 2-2: Properties and Characteristics - Top of Rail materials
Railway infrastructure – Rail fastening systems – Part 6: Test method for resistance to severe environmental conditions
Railway infrastructure – Rail fastening systems – Part 2: Test method for longitudinal rail restraint
Railway infrastructure – Rail fastening systems – Part 3: Proof load test method for pull-out resistance
Railway applications - Track - Turnouts and crossings for 1520 mm gauge
Railway applications – Wheel/Rail friction management – Part 2-2: Properties and Characteristics – Top of Rail materials
Intermediate rail fastening of railway track. General specifications
Rail Part 1: 43kg/m~75kg/m rail
Rails Part 2: Asymmetrical Section Rails for Switches
Railway switches and crossing terminology
本文件规定了地铁道岔的术语和定义、基本要求、技术要求、检验方法、检验规则和标志、包装、运输、贮存以及质量承诺。 本文件适用于采用合金钢组合辙叉且列车直向容许通过速度不大于 160km/h 的各类地铁单开道岔、交叉渡线(以下简称地铁道岔)。
Metro turnout
Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号