D09 卫生、安全、劳动保护 标准查询与下载



共找到 467 条与 卫生、安全、劳动保护 相关的标准,共 32

本标准规定了煤矿通风安全监测工(以下简称监测工)的基本条件、安全技术培训(以下简称培训)大纲和安全技术考核(以下简称考核)要求。 本标准适用于监测工的培训和考核。

Outline and testing requirement of safety technique training for ventilation safety inspector in a coal mine

ICS
13.100
CCS
D09
发布
2011-07-12
实施
2011-12-01

本标准规定了煤矿安全风险预控管理体系的术语和定义、管理要素及要求。 本标准适用于井工煤矿的安全风险预控管理。

Risk precontrol management system of safety in coal mine.Specification

ICS
13.100;73.010
CCS
D09
发布
2011-07-12
实施
2011-12-01

本标准规定了金属非金属地下矿山紧急避险系统的安装、维护和管理要求。 本标准不适用于与煤共生、伴生的金属非金属地下矿山。

Regulations for construction of emergency refuge system in metal and nonmetal underground mine

ICS
73.010
CCS
D09
发布
2011-07-12
实施
2011-09-01

Specifications for the construction of compressed air self-rescue systems for metal and nonmetal underground mines

ICS
73.010
CCS
D09
发布
2011-07-12
实施
2011-09-01

本标准规定了煤矿进风井地面用燃煤热风炉(以下简称热风炉)的安全技术与使用要求、检验方法、检验规则、标志、包装和贮存。 本标准规定了煤矿进风井地面使用,加热入井空气,以煤炭为燃料的热风炉。

Safety technical specification of coal-burning air heater for intake of coal mine on the ground

ICS
73.010
CCS
D09
发布
2011-07-12
实施
2011-12-01

本标准规范了煤矿建设期间安全生产设施的设置和安全环境的要求,以及参与建设活动的各种责任主体(包括煤矿建设、设计、施工和监理等单位)的安全资格与安全行为。 本标准适用于全国各类煤矿建设活动,包括新建、改建、扩建煤矿。

Safety code for coal mine construction

ICS
73.010
CCS
D09
发布
2011-07-12
实施
2011-12-01

本标准规定了金属非金属地下矿山供水施救系统的安装、维护和管理要求。

Regulations for the construction of water rescue system in metal and nonmetal underground mine

ICS
73.010
CCS
D09
发布
2011-07-12
实施
2011-09-01

本标准规定了矿井灾变环境混合气体爆炸危险性的测试灾害气体种类、混合灾害气体采集方法、测试方法、测试精度要求,爆炸危险性判定规则。 本标准适用于煤矿井下灾变环境混合气体的测试分析和爆炸危险性判定。

Testing method and judgment standard of explosion hazard for mixed gases in coal mine disaster circumstance

ICS
73.010
CCS
D09
发布
2011-07-12
实施
2011-12-01

本标准规定了煤矿充填密闭用高分子发泡材料(以下简称高分子发泡材料)的术语和定义、产品分类、要求、试验方法、检验规则、标志、包装、运输及贮存。 本标准适用于煤矿空间充填和构筑密闭用高分子发泡材料。

Polymer foaming material for filling and sealing in coal mine

ICS
73.100.20;83.100
CCS
D09
发布
2011-07-12
实施
2011-12-01

本标准规定了金属非金属地下矿山人员定位系统的安装、维护和管理要求。 本标准不适用于与煤共生、伴生的金属非金属地下矿山。

Regulations for the construction of personnel regional positioning system in metal and nonmetal underground mine

ICS
73.010
CCS
D09
发布
2011-07-12
实施
2011-09-01

本标准规定了矿用位移传感器的术语和定义、型号命名和类型、技术要求、试验方法、检验规则、标志、包装、运输、贮存。 本标准适用于煤矿井下使用的位移传感器。

General specifications of mine displacement sensor

ICS
13.100
CCS
D09
发布
2011-04-12
实施
2011-09-01

General technical conditions for mining displacement sensors

ICS
煤炭行业煤矿安全标准化技术委员会
CCS
D09
发布
2011-04-12
实施
2011-09-01

本标准规定了矿用封孔器的术语和定义、技术要求、试验方法、检验规则、标志、包装、运输、贮存。 本标准适用于煤矿井下注水、注浆和抽放瓦斯使用的封孔器。

General specifications of mine hole packer

ICS
13.100
CCS
D09
发布
2011-04-12
实施
2011-09-01

本标准规定了矿用红外测温仪的定义、型号命名和防爆类型、技术要求、试验方法、检验规则、标志、包装、运输、贮存。 本标准适用于矿用红外测温仪。

Ceneral specifications of mine infrared temperature measuring apparatus

ICS
13.100
CCS
D09
发布
2011-04-12
实施
2011-09-01

本标准规定了矿井热害防治技术的术语和定义、技术条件、适用范围、技术要求、降温系统测试及评价方法。 本标准适用于煤矿地下开采的矿井,包括生产、新建和改、扩建矿井。

Mine air-cooling technical specifications

ICS
13.100
CCS
D09
发布
2011-04-12
实施
2011-09-01

本标准规定了矿用烟雾传感器的术语和定义分类、型号命名、技术要求、试验方法、检验规则、标志、包装、运输、贮存。 本标准适用于煤矿用烟雾传感器。

General specifications of mine smoke sensor

ICS
13.100
CCS
D09
发布
2011-04-12
实施
2011-09-01

Coal Mine Gas Drainage Water Glue Pillar

ICS
CCS
D09
发布
2011-03-01
实施
2011-03-01

Mine plans - Operational safety - Part 3: Fire prevention under the surface

ICS
73.020
CCS
D09
发布
2011-01
实施

This practice addresses AML PAs, PUs, Keyword Features, and Project Sites relative to SMCRA. This practice is significant as it provides for uniformity of geospatial data pertaining to the geographic location and description of AML sites located throughout the United States. This geospatial data standard will help ensure uniformity of data contributed by each RA and assist organizations in efforts to create, utilize, and share geospatial data relative to SMCRA. Use of this standard will result in organized and accessible data to support programmatic decisions and work plan development, increased awareness of AML problems throughout the United States, and better communication between RA and federal offices, the public, industry, and other interested parties. The geospatial data may be served as a layer in a national dataset and map service.1.1 This practice covers the minimum elements for the accurate location and description of geospatial data for defining Abandoned Mine Land (AML) Problem Areas, Planning Units, Keyword Features, and Project Sites. 1.1.1 This practice addresses mining geospatial data relative to the Surface Mining Control and Reclamation Act of 1977 (SMCRA). This geospatial data shall be obtained from each state, tribal or federal coal mining regulatory authority (RA), or combinations thereof, authorized under SMCRA to reclaim the surface and underground effects of past mining operations. Abandoned mine land, as specified in SMCRA Sections 404 (coal), 409 and 411 (non-coal) and cross referenced in additional sections on eligible lands, consist of those lands and waters which were mined for coal or other minerals, or both, or impacted by processing operations prior to the enactment of SMCRA and abandoned or left in an inadequate condition of reclamation and for which there is no continuing reclamation responsibility under state or other federal laws for mitigation of adverse impacts to human health and safety or environmental resources. 1.1.2 Title IV of SMCRA establishes the national AML Reclamation Program under the Office of Surface Mining Reclamation and Enforcement (OSMRE), U.S. Department of the Interior (DOI). The program was developed to reclaim land and water resources adversely affected by past coal and non-coal mining and left abandoned or inadequately restored. During the years immediately following the enactment of SMCRA, OSMRE, states, and Indian tribes conducted surveys of eligible lands and waters and created individual inventories of problems to be addressed under Title IV. In 1990, SMCRA was amended and OSMRE was required to maintain a national inventory of high priority abandoned mine sites and provide standardized procedures for states and tribes to use in updating the data. The need for an automated nationwide inventory system led to the creation of the enhanced AML Inventory System (e-AMLIS), a compilation of the individual state, tribe, Federal Reclamation Program (FRP), and Rural Abandoned Mine Program (RAMP) inventories. The e-AMLIS documents the counts for AML problem types and the costs to remedy those problems. The system captures estimated unfunded costs, estimated construction costs when funding is made available for reclamation projects, and the actual costs for completed construction projects. It is used in support of work plan development and to record the work completed under each RA’s program and to report the extent and estimated cost to reclaim remaining AML problems. 1.1.3 Each state in the United States of America has been divided into Water Cataloging Units (WCU) by the U. S. Water Resources Council. These appear in the state’s Hydrologic Unit Map prepared by the U.S. Department of the Interior, U. S. Geological Survey, in cooperation with the Water Resources Council. The WCU are divided and......

Standard Practice for Minimum Geospatial Data for Abandoned Mine Land Problem Areas, Planning Units, Keyword Features, and Project Sites

ICS
73.020
CCS
D09
发布
2011
实施

Tailings Pond Safety Monitoring Technical Specifications

ICS
73.020
CCS
D09
发布
2010-09-06
实施
2011-05-01



Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号