Specification for pumping test

ICS
CCS
D10
发布
2000-12-12
实施
2001-07-01

本标准规定了煤炭、煤层(成)气地震勘探工作程序、地质任务和工程设计,地震资料采集、处理与解释,成果报告的编写,质量检验等工作的技术要求。 本标准适用于煤炭、煤层(成)气各个勘探阶段和矿井基本建设、生产中的地震勘探,也适用于煤矿床水和煤矿灾害地质地震勘探。

Seismic exploration general standard in coal and coalbed methane

ICS
CCS
D10
发布
2000-12-08
实施
2001-05-01

本规范规定了煤炭资源及其相关地质工作中地面电法勘探的设计编制、野外施工、质量评价、资料处理与解释、报告编制和审查验收等工作的基本要求和技术规则。 本规范适用于煤炭资源地质勘探及与煤炭资源相关的各种比例尺地质填图、矿区水文地质工程地质勘查、供水水文地质勘探中的地面电法勘探工作。同时也可供煤炭各类工程地质、环境地质、灾害地质等勘探中的地面电法勘探工作参考。

General standard of electrical survey in coal

ICS
CCS
D10
发布
2000-12-08
实施
2001-05-01

The document contains the connecting dimensions for slip-on pivots, slip-on caps used for suspension theodolites.#,,#

Mine surveying - Slip-on pivots, slip-on caps for suspension theodolites - Connecting dimensions

ICS
07.040
CCS
D10
发布
2000-06
实施

この規格は,整形された岩石試料の引張強さ試験方法のうち,圧裂引張試験方法について規定する。

Method of test for tensile strength of rock

ICS
73.060.01
CCS
D10
发布
2000-03-20
实施

この規格は,整形された岩石試料の圧縮強さ試験方法について規定する。

Method of test for compressive strength of rock

ICS
73.060.01
CCS
D10
发布
2000-03-20
实施

Mine plans - Stratigraphy - Part 2: Regional and local subdivisions; hard coal

ICS
73.020
CCS
D10
发布
2000-01
实施

The stipulations of this document apply to the preparation and elaboration of mining-specific maps and plans. The general stratigraphic data contained therein describe the background against which the desposit is to be seen, not, however, the deposit itself.#,,#

Mine plans - Stratigraphy - Part 1: General classification

ICS
73.020
CCS
D10
发布
2000-01
实施

The document applies to the features of mining-specific mapping. It determines general geometrical terms about points, straight lines, planes and angles to describe underground workings.

Mine plans - Deep mining - Part 11: Geometrical dimensions in underground workings

ICS
01.040.73;73.020
CCS
D10
发布
2000-01
实施

This Code of Practice deals with the investigation of sites for the purposes of assessing their suitability for the construction of civil engineering and building works and of acquiring knowledge of the characteristics of a site that affect the design and construction of such work and the security of neighbouring land and property. It has been assumed that in the selection of construction sites due regard has been paid to the wider environmental and economic considerations affecting the community generally. More than one site may require detailed investigation before the final choice is made. In this code, the expression Site Investigation has been used in its wider sense. It is often used elsewhere in a narrow sense to describe the exploration of the ground, which in this code has been termed Ground Investigation. It is to be noted, however, that although the treatment of ground investigation is detailed, the treatment of other aspects of site investigation is less detailed. The use of soil and rock as construction materials is treated only briefly; further information is given in BS 6031. This code of practice consists of the following sections: — Section 1: Preliminary considerations; — Section 2: Ground investigations; — Section 3: Field investigations; — Section 4: Field tests; — Section 5: Laboratory tests on samples; — Section 6: Description of soils and rocks; — Section 7: Reports and interpretation. Section 1 deals with those matters of a technical, legal or environmental character that have usually to be taken into account in selecting the site (or in determining whether a selected site is suitable) and in preparing the design of the works. Section 2 discusses general aspects and planning of ground investigations, including the influence of general conditions and ground conditions of the selection of methods of investigation. Sections 3, 4 and 5 discuss methods of ground investigation, sub-divided as follows: section 3 excavation, boring, sampling, probing and tests in boreholes; section 4: field tests; section 5: tests on samples. The division between sections 3 and 4 is somewhat arbitrary and has been based mainly on convenience in arranging the subject matter. Section 6 deals with the terminology and systems recommended for use in describing and classifying soil and rock materials and rock masses. Section 7 deals with the preparation of field reports and final borehole logs, the interpretation of the data obtained from the investigation and the preparation of the final report. Users of this Code of Practice, particularly those of limited experience, are advised against referring to the methods of ground investigation in sections 3, 4 and 5 without studying the preliminary considerations in sections 1 and 2. It should be appreciated that the description of a method is only to be considered as a guide and should not be taken as mandatory. In this respect, it should be realized that development continues to take place involving changes in some of the methods. It may be noted that there is an imbalance of treatment between tests; in some cases more comprehensive treatment has been given to tests less frequently used. This is because many of the common tests are described extensively elsewhere (see BS 1377), whereas there is a paucity of reference to other tests. The code has been drawn up in relation to conditions existing in the United Kingdom, but occasional reference is made to conditions overseas where this has appeared desirable.

Code of practice for site investigations

ICS
91.200
CCS
D10
发布
1999-10-15
实施
1999-10-15

This Code of Practice deals with the investigation of sites for the purposes of assessing their suitability for the construction of civil engineering and building works and of acquiring knowledge of the characteristics of a site that affect the design and construction of such work and the security of neighbouring land and property. It has been assumed that in the selection of construction sites due regard has been paid to the wider environmental and economic considerations affecting the community generally. More than one site may require detailed investigation before the final choice is made. In this code, the expression Site Investigation has been used in its wider sense. It is often used elsewhere in a narrow sense to describe the exploration of the ground, which in this code has been termed Ground Investigation. It is to be noted, however, that although the treatment of ground investigation is detailed, the treatment of other aspects of site investigation is less detailed. The use of soil and rock as construction materials is treated only briefly; further information is given in BS 6031.

Code of practice for site investigations

ICS
91.200
CCS
D10
发布
1999-10-15
实施
1999-10-15

The document applies to the features of mining-specific mapping. It contains terms of the geometrical base for representation in maps and a synopsis on the systematic order of mining specific maps and files of maps als well as the appurtenant definitions.

Mine plants - Structure of mining specific plans

ICS
73.020
CCS
D10
发布
1999-10
实施

Mine plans - Mineral deposits - Part 1: Terms, classification

ICS
01.040.73;73.020
CCS
D10
发布
1999-10
实施

本标准对井中(时域)激发极化法(以下简称井中激电)的工作设计、仪器设备、野外施工、资料处理和图示、质量评定、成果报告,以及安全措施等主要工作环节,提出了基本技术要求。 本规程适用于多金属、贵金属硫化矿产勘查的井中激电工作。能源、非金属矿产,以及水文地质勘查也可参照执行。

Technical Regulations for Borehole Induced Polarization Method

ICS
73-010
CCS
D10
发布
1999-09-29
实施
2000-01-01

本标准规定了地面γ能谱测量的工作设计、仪器及其调整、仪器校准(标定)及性能检查、野外工作方法、室内资料整理及提交成果的基本技术要求和技术规则。 本标准适用于基础地质、能源、金属及非金属矿产地质勘查以及解决水文、工程、环境、灾害等有关地质间题的地面γ能谱测量。辐射环境评价、建筑材料放射性评价及与地面γ能谱测量有关的其他领域也可参照使用。

Technical Regulations for Ground Gamma Spectroscopy

ICS
07.060
CCS
D10
发布
1999-09-29
实施
2000-01-01

この規格は,鉱山(附属施設を含む。ただし,石炭及び石油鉱山を除く。)の坑水・廃水(以下,坑水・廃水という。)の試験方法について規定する。

Testing methods for mine water and/or waste water

ICS
73.020
CCS
D10
发布
1999-03-20
实施

Mine plans - Strata and ground movements

ICS
01.040.73;73.020;01.080.30
CCS
D10
发布
1999-02
实施

The document contains the required terms, symbols, and formula symbol to be used for the representation of drilling-developed brine caverns intended for winning, storage and ultimate waste disposal. The document applies to the features of mining specific mapping.#,,#

Mine plans - Drilling and cavern - Part 2: Brine caverns

ICS
73.020;01.080.30
CCS
D10
发布
1999-02
实施

1.1 This practice describes equipment and procedures for diamond core drilling to secure core samples of rock and some soils that are too hard to sample by soil-sampling methods. This method is described in the context of obtaining data for foundation design and geotechnical engineering purposes rather than for mineral and mining exploration. 1.2 This standard does not purport to address all of the safety problems, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.

Standard Practice for Rock Core Drilling and Sampling of Rock for Site Investigation

ICS
93.020 (Earth works. Excavations. Foundation const
CCS
D10
发布
1999
实施

Covers the disposal of mine residue in residue deposits. This residue includes all waste that is produced by a mine and that is defined as waste in terms of the Minerals Act, 1991 (Act 50 of 1991). Slimes dams, tailings dams, rock dumps, slurry ponds and

Mine residue

ICS
73.020
CCS
D10
发布
1998-09-18
实施



Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号