J61 铸造设备 标准查询与下载



共找到 507 条与 铸造设备 相关的标准,共 34

本标准规定了低压铸造机的技术要求、试验方法、检验规则、标志、包装与储运。 本标准适用于用低压铸造的方法来生产铝铸件的低压铸造机(以下简称铸造机)。

Low pressure diecasting machine. Technical requirements

ICS
25.120.30
CCS
J61
发布
2006-09-14
实施
2007-03-01

本标准规定了振动落砂机的型式和基本参数,技术要求,试验方法、检验规则,标志、包装及储运要求和质量保证期。 本标准适用于固定式惯性振动落砂机、输送式惯性振动落砂机(以下简称落砂机),冲击式惯性振动落砂机和偏心振动落砂机也可参照执行本标准。

Shakeout

ICS
25.120.30
CCS
J61
发布
2006-09-14
实施
2007-03-01

本标准规定了滚筒抛丸清理机的要求、试验方法和检验规则等。 本标准适用于滚筒抛丸清理机(以下简称清理机)。

Barrel shot blasting machine. Technical requirement

ICS
25.120.30
CCS
J61
发布
2006-09-14
实施
2007-03-01

本标准规定了射芯机的主参数、技术要求、试验方法、检验规则、标志、包装及储运。 本标准适用于制造砂芯的普通射芯机、热芯盒射芯机,也适用于多用射芯机和冷芯盒射芯机(以下均简称射芯机),但它们的特定要求除外,如冷芯盒射芯机的气体发生器、净化装置等。

Core shooter

ICS
25.120.30
CCS
J61
发布
2006-09-14
实施
2007-03-01

Technological foundry equipment. General specifications

ICS
25.120.30
CCS
J61
发布
2006
实施
2008-01-01

Technological foundry equipment. Equipment for shot shooting, shot blasting and shot shooting-blasting treatment. Safety requirements

ICS
13.110;25.120.30
CCS
J61
发布
2006
实施
2008-01-01

이 규격의 적용 범위는 다음 두 가지로 구분된다.a) 반사형 적외선 램프b) 관

Characteristics of electric infra-red emitters for industrial heating-Part 1:Short wave infra-red emitters

ICS
25.180.10
CCS
J61
发布
2005-12-28
实施
2005-12-28

This International Standard specifies the main dimensions and tolerances, in millimetres, of sprue bushes that are used mainly in injection moulds for plastics and rubbers (an application example is shown in Figure 1). It also specifies the hardness and designation of sprue bushes conforming to this International Standard.

Tools for moulding - Sprue bushes - Dimensions (ISO 10072:2004)

ICS
25.120.30
CCS
J61
发布
2005-09
实施

This International Standard specifies the basic dimensions, in millimetres, of headed angle pins (type A) and of straight angle pins (type B) intended for use in diescast dies and tools for moulding (an example of application is given in Figure 1 ). It also specifies the material hardness and designation of the angle pins (type A and B).

Tools for moulding - Angle pins (ISO 8404:2003)

ICS
25.120.30
CCS
J61
发布
2005-09
实施

本标准规定了铸造机械设计、制造、质量检验和使用维修的基本要求。 本标准适用于铸造机械。各类铸造机械(以下简称“机器”)均应根据本标准的原则补充制定相应的标准。

Foundry machinery-general technical requirement

ICS
25.120.30
CCS
J61
发布
2005-03-19
实施
2005-09-01

本部分规定了机械式振动时效装置的基本参数。 本部分适用于碳素结构钢、低合金钢、不锈钢、铸铁、有色金属(铜、铝、钛及其合金)等材质的铸件、锻件、焊接件、模具、机加工件的振动时效装置(以下简称装置)。

Machinery vibrating stress relief device Part 1: Basic parameters

ICS
25.120.30
CCS
J61
发布
2005-03-19
实施
2005-09-01

本部分规定了机械式振动时效装置的技术要求,试验方法和检验规则等。 本部分适用于碳素结构钢、低合金钢、不锈钢、铸铁、有色金属(铜、铝、钛及其合金)等材质的铸件、锻件、焊接件、模具、机加工件的振动时效装置(以下简称装置)。

Machinery vibrating stress relief device Part 2: Technical requirements

ICS
25.120.30
CCS
J61
发布
2005-03-19
实施
2005-09-01

本部分规定了振动时效工艺参数的选择及技术要求和振动时效效果评定方法。 本部分适用于碳素结构钢、低合金钢、不锈钢、铸铁、有色金属(铜、铝、钛及其合金)等材质的铸件、锻件、焊接件、模具、机械加工件的振动时效装置。

Vibrating stress relief effect-Evaluation methods

ICS
25.120.30
CCS
J61
发布
2005-03-19
实施
2005-09-01

本部分规定了铸造用冲天炉的技术要求、试验方法、检验规则等。 本部分适用于以焦炭为燃料有炉衬普通冲天炉(以下简称冲天炉)。

Cupola Part 1: Technical requirements

ICS
25.120.30
CCS
J61
发布
2005-03-19
实施
2005-09-01

本部分规定了热室压铸机的几何精度、检验方法和检验规则。 本部分适用于热室压铸机(以下简称压铸机)。

Hot-chamber diecasting machine Part 2: Testing of the accuracy

ICS
25.120.30
CCS
J61
发布
2005-03-19
实施
2005-09-01

本部分规定了热室压铸机的技术要求、试验方法、检验规则、标志、包装、运输及贮存。 本部分适用于生产有色金属及其合金压铸件的热室压铸机(以下简称压铸机)。

Hot-chamber diecasting machine Part 3: Technical requirements

ICS
25.120.30
CCS
J61
发布
2005-03-19
实施
2005-09-01

1.1 This practice covers the requirements of applying the design, construction, and operation of the machinery and equipment used in metal casting operations-sand preparation, molding and core making, melting and pouring, and cleaning and finishing. This practice does not apply to die casting operations.1.2 Purpose8212;The requirements of this practice, including the training of supervisors and employees, are intended to minimize the possibility of injury to operating and maintenance personnel while working on, or in the vicinity of, the specified equipment. Compliance with this practice, in conjunction with OSHA regulations, provides a relatively safe environment, which is a fundamental requisite in helping to prevent occupational injuries.1.3 Application1.3.1 New Installations8212;After the date of publication, all new installations within the scope of this specification shall be in conformance with its requirements. Any existing machine installation moved to a new plant or another location in the same plant is deemed a new installation when it is installed in the new location. However, an existing installed machine (former installation) that is moved for a short distance, for example, to provide additional aisle space, is not deemed to be a new installation.1.3.2 Existing Installations8212;After the approval date of this practice, installations existing on, or before, this date, shall be modified as necessary to be in conformance with all requirements of this practice. Where it is not practical to modify an existing facility in conformance with this practice, deficiencies shall be noted and plans for compliance shall be included in any future facility or equipment changes. Those facilities and equipment on order or in the process of construction on the date of publication of this practice shall be considered as an existing installation. This practice applies to existing equipment if it lacks the necessary employee protection (personal protective equipment or administrative controls).1.4 The values stated in inch/pound units are to be regarded as the standard. The values in brackets are for information only.1.5 The text of this practice references notes and footnotes which provide explanatory material. These notes and footnotes (excluding those in tables and figures) shall not be considered as requirements of the standard.1.6 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and to determine the applicability of regulatory limitations prior to use.

Standard Practice for Safety Requirements in Metal Casting Operations: Sand Preparation, Molding, and Core Making; Melting and Pouring; and Cleaning and Finishing

ICS
77.180 (Equipment for the metallurgical industry)
CCS
J61
发布
2005
实施

이 규격은 몰드에서 고정측 장치판에 스페이서 블록을 위치시키기 위하여 사용하는 센터링

Tools for moulding-Centering sleeves

ICS
25.120.30
CCS
J61
发布
2004-12-30
实施
2004-12-30

This document specifies requirements to be met by the manufacturer for the foreseeable significant hazards due to design, construction and installation, during commissioning, operation, maintenance, and decommissioning of the following machines and equipment which are used directly and indirectly for the manufacture of castings: — Ladles; — Pouring equipment; — Centrifugal casting machines for production of tubes (only machines with horizontal or oblique axis of rotation); — Continuous and semi continuous casting machines for non-ferrous metals. This document specifies the safety requirements in addressing the following items: — controls; — protection against: — mechanical hazards, movement of machines and material, ejection of parts, material, liquids and gases, implosion, structural instability; — electric hazards; — explosion, fire, scalds, contact with hot parts (burns), gases and flames; — noise and vibration; — thermal radiation; — harmful by-products, poisoning, pollution of operators air; — impact; — deterioration of worker's health; — shearing; — crushing; — maintenance, provision for warning systems. It is assumed that — normal operation of equipment falling within this scope may involve the intervention of personnel; — machines are operated by skilled and adequately trained persons; — machines are used with adequate workplace lighting conforming to local regulations, or to EN 12464-1. This document does not specify the safety requirements for machines in combination and for ancillary plant, melting, holding, drying and/or heating equipment, crane installations, winches, conveyors or handling systems which could be an integral part of the above equipment, or ladles which are specific to steelworks or ladles forming part of a crane or ladles for pouring by a casting machine or vessels used for molten metal transport on public highway, or continuous or semi continuous casting equipment which is specific to steelworks, or ladles which are carried by hand.

Foundry machinery - Safety requirements for ladles, pouring equipment, centrifugal casting machines, continuous and semi-continuous casting machines

ICS
25.120.30
CCS
J61
发布
2004-08-19
实施
2004-08-19

This document specifies requirements to be met by the manufacturer for the foreseeable significant hazards due to design, construction and installation, during commissioning, operation, maintenance, and decommissioning of the following machines and equipment which are used directly and indirectly for the manufacture of castings: ? Ladles; ? Pouring equipment; ? Centrifugal casting machines for production of tubes (only machines with horizontal or oblique axis of rotation); ? Continuous and semi continuous casting machines for non-ferrous metals. This document specifies the safety requirements in addressing the following items: ? controls; ? protection against: ? mechanical hazards, movement of machines and material, ejection of parts, material, liquids and gases, implosion, structural instability; ? electric hazards; ? explosion, fire, scalds, contact with hot parts (burns), gases and flames; ? noise and vibration; ? thermal radiation; ? harmful by-products, poisoning, pollution of operators air; ? impact; ? deterioration of worker’s health; ? shearing; ? crushing; ? maintenance, provision for warning systems. It is assumed that ? normal operation of equipment falling within this scope may involve the intervention of personnel; ? machines are operated by skilled and adequately trained persons; ? machines are used with adequate workplace lighting conforming to local regulations, or to EN 12464-1. This document does not specify the safety requirements for machines in combination and for ancillary plant, melting, holding, drying and/or heating equipment, crane installations, winches, conveyors or handling systems which could be an integral part of the above equipment, or ladles which are specific to steelworks or ladles forming part of a crane or ladles for pouring by a casting machine or vessels used for molten metal transport on public highway, or continuous or semi continuous casting equipment which is specific to steelworks, or ladles which are carried by hand. This document is not applicable to ladles, pouring equipment, centrifugal casting machines and continuous and semi-continuous casting machines which are manufactured before the date of its publication as EN.

Foundry machinery — Safety requirements for ladles, pouring equipment, centrifugal casting machines, continuous and semi continuous casting machines

ICS
25.120.30
CCS
J61
发布
2004-08-19
实施
2004-08-19



Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号