P33 居住与公共建筑工程 标准查询与下载



共找到 685 条与 居住与公共建筑工程 相关的标准,共 46

Hospice (Hospice Care) Service Specifications for Elderly Care Institutions

ICS
91.040.10
CCS
P33
发布
2017-09-30
实施
2017-10-30

Standards for the construction of livable communities for the elderly

ICS
91.040.10
CCS
P33
发布
2017-09-30
实施
2017-10-30

Guizhou Provincial Health Care Base Planning Technical Regulations

ICS
91.040,99
CCS
P33
发布
2017-08-18
实施
2018-01-18

Specifications for the construction of forest health care bases in Guizhou Province

ICS
91.040.99
CCS
P33
发布
2017-08-18
实施
2018-01-18

Technical Standards for Temporary Buildings in Construction Projects

ICS
91.090
CCS
P33
发布
2017-06-28
实施
2017-10-01

Spectator facilities. Safety Management

ICS
91.040.10;97.200.10;97.220.10
CCS
P33
发布
2017-06-21
实施
2017-06-21

Safety requirements for mechanical parking systems

ICS
91.090;91.140.99
CCS
P33
发布
2017-05-25
实施

本标准规定了公路混凝土桥梁预应力施工质量检测的总则、基本要求、检测工作流程、质量评定、 验证处理与数据管理。 本规程适用于公路混凝土桥梁预应力施工质量检测评定,其他结构形式的预应力施工质量检测评定可参照本规程执行。

Technical regulations for quality inspection and evaluation of prestressed construction of highway concrete bridges

ICS
93.140
CCS
P33
发布
2017-02-08
实施
2017-05-08

本标准规定了百货店及购物中心(以下称商场)经营过程中单位综合电力消耗(以下称电耗)限额的单位综合电耗限额、综合电耗的统计范围和计算方法及主要节能管理措施。 本标准适用于营业面积≥10000平方米的商场电力消耗量的计算与评价。

Comprehensive power consumption quota and calculation method for shopping malls

ICS
91.040.20
CCS
P33
发布
2017-01-20
实施
2017-03-20

4.1 This guide is intended to provide building professionals with a comprehensive methodology for evaluating water leakage through walls. It addresses the performance expectations and service history of a wall, the various components of a wall, and the interaction between these components and adjacent construction. It is not intended as a construction quality control procedure, nor as a preconstruction qualification procedure. It is intended for evaluating buildings that exhibit water leakage. 4.1.1 Qualifications—This guide requires the evaluator to possess a knowledge of basic physics and of construction and wall design principles and practices. 4.1.2 Application—The sequential activities described herein are intended to produce a complete and comprehensive evaluation program, but all activities may not be applicable or necessary for a particular evaluation program. It is the responsibility of the professional using this guide to determine the activities and sequence necessary to properly perform an appropriate leakage evaluation for a specific building. 4.1.3 Preliminary Assessment—A preliminary assessment may indicate that water leakage problems are limited to a specific element or portion of a wall. The preliminary assessment may also indicate that the wall is not the source of a leak even though it is perceived as such by the building occupant. The presence of water might result from a roofing problem, a condensation problem, a plumbing problem, operable windows or doors left opened or unlatched or some other condition not directly related to water leakage through the building wall and is outside the scope of this guide. The evaluation of causes may likewise be limited in scope, and the procedures recommended herein abridged according to the professional judgement of the evaluator. A statement stipulating the limits of the investigation should be included in the report. 4.1.4 Expectations—Expectations about the overall effectiveness of an evaluation program must be reasonable and in proportion to a defined scope of work and the effort and resources applied to the task. The objective is to be as comprehensive as possible within a defined scope of work. The methodology in this guide is intended to address intrinsic leakage behavior properties of a wall system, leading to conclusions that generally apply to similar locations on the building. Since every possible location is not included in an evaluation program, it is probable that every leak source will not be identified. Leakage sources that are localized and unique may remain and may require additional localized evaluation effort. The potential results and benefits of the evaluation program should not be over-represented. 4.2 This guide is not intended as a design guide or as a guide specification. Reference is made to design features of a wall only for the purpose of identifying items of interest for consideration in the evaluation process. 4.3 This guide does not address leakage through roofs, leakage below grade, or water that accumulates due to water vapor migration and condensation.

Standard Guide for Evaluating Water Leakage of Building Walls

ICS
91.060.10
CCS
P33
发布
2017
实施

4.1 Every elevated play structure is required to have a protective surface installed and poured-in-place surfaces are one of the many choices. These surfaces are highly technical in structure, component selection, percentages of components and installation procedures. This guide is intended to assist the playground owner/operator, specification writer, designer, and so forth in determining the properties that can be considered with regard to the poured-in-place surface and set out considerations that the user of this guide should make to ensure a successful installation. This document is a guide and should not be used directly as a performance specification for poured-in-place surfacing. 1.1 This guide covers information with regard to the design, manufacture, installation, and maintenance of poured-in-place playground surfaces. Note 1: This document is a guide and not intended to be used as a specification; it should be used for educational purposes. 1.2 This guide outlines the issues of compliance with existing standards, durability, and functional longevity. 1.3 This guide reviews issues such as edge treatment, abutting surfaces, and combinations with other surfaces designed for circulation or protective surfaces. 1.4 This guide presents maintenance considerations and general procedures that should be followed by the owner/operator. 1.5 This guide outlines aging considerations such as loss of impact absorption, cracking, shrinkage, heaving, and how to prevent, accommodate, or rectify those issues. 1.6 This guide presents warranty considerations. 1.7 This guide does not imply that an injury cannot be incurred when the surface system is compliant with the standards referred to in this guide. 1.8 The values stated in inch-pound units are to be regarded as standard. The values given in parentheses are mathematical conversions to SI units that are provided for information only and are not considered standard. 1.9 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use. 1.10 This international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for the Development of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee.

Standard Guide for Specification, Purchase, Installation and Maintenance of Poured-In-Place Playground Surfacing

ICS
97.200.40
CCS
P33
发布
2017
实施

Simultaneous interpreting - Mobile booths - Requirements

ICS
91.040.10
CCS
P33
发布
2016-12-01
实施

Simultaneous interpreting - Equipment - Requirements

ICS
91.040.10
CCS
P33
发布
2016-12-01
实施

Simultaneous interpreting - Permanent booths - Requirements

ICS
91.040.10
CCS
P33
发布
2016-12-01
实施

Dieses Dokument stellt Anforderungen und Empfehlungen für die Herstellung von mobilen Dolmetschkabinen bereit. Die Hauptmerkmale, die mobile Dolmetschkabinen von ortsfesten Kabinen für Simultandolmetschen unterscheiden, sind jene, dass mobile Kabinen demontiert, transportiert und in einem Konferenzraum, welcher nicht mit ortsfesten Kabinen ausgerüstet ist, aufgebaut werden können. Dieses Dokument stellt auch die Verwendbarkeit und Zugänglichkeit für alle Dolmetscher einschließlich jenen mit besonderen Bedürfnissen sicher. Anforderungen an die Verwendung und Platzierung von mobilen Kabinen sind in Anhang A beschrieben. In Verbindung mit entweder ISO 2603 oder diesem Dokument legen ISO 20108 und ISO 20109 die maßgeblichen Anforderungen sowohl für die Qualität und die Übertragung von Ton und Bild an die Dolmetscher als auch für die in den Kabinen benötigte Ausstattung fest.

Simultaneous interpreting - Mobile booths - Requirements (ISO 4043:2016)

ICS
91.040.10
CCS
P33
发布
2016-12
实施

Industrial, commercial, garage doors and gates - Product standard, performance characteristics; German version EN 13241:2003+A2:2016

ICS
91.090
CCS
P33
发布
2016-12
实施

本标准适用于既有医院建筑能耗的计算、评价、考核。

Hospital building energy consumption quota standard

ICS
91.010
CCS
P33
发布
2016-11-21
实施
2017-05-01

本标准适用于既有机关办公建筑能耗的计算、评价、考核。

Standards for Energy Consumption Quota of Government Office Buildings

ICS
91.010
CCS
P33
发布
2016-11-21
实施
2017-05-01

本标准适用于既有商务办公建筑能耗的计算、评价、考核。

Energy consumption quota standard for commercial office buildings

ICS
91.010
CCS
P33
发布
2016-11-21
实施
2017-05-01

本标准适用于既有星级宾馆酒店建筑能耗的计算、评价、考核。

Energy consumption quota standard for hotels and hotels

ICS
91.010
CCS
P33
发布
2016-11-21
实施
2017-05-01



Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号