P56 流域规划与江河整治工程 标准查询与下载



共找到 74 条与 流域规划与江河整治工程 相关的标准,共 5

本标准规定了山洪灾害防御预案编制的要求和主要内容。本标准适用于我国有山洪灾害防治任务的县级、乡(镇)级、村级行政区和企事业单位山洪灾害防御预案的编制。

Compilation guideline of flash flood disaster prevention plan

ICS
27.140
CCS
P56
发布
2014-07-03
实施
2014-10-03

Specifications for construction quality assessment of ecologically clean small watersheds

ICS
91.200
CCS
P56
发布
2014-05-21
实施
2014-09-01

本标准适用于水土保持综合规划和专项规划的编制。其他相关行业规划的水土保持章节编制可参照执行。

Specifications for compilation of soil and water conservation planning

ICS
27.140
CCS
P56
发布
2014-05-19
实施
2014-08-19

Soil and water conservation planning preparation specifications

ICS
27.14
CCS
P56
发布
2014-05-19
实施
2014-08-19

本标准规定了入河排污量的统计技术方法和程序。本标准适用于各级水行政主管部门和流域管理机构对管辖区域的入河排污量统计。

Technical code for statistics on pollution discharge capacity

ICS
27.140
CCS
P56
发布
2014-04-22
实施
2014-07-22

Technical regulations for statistics of sewage discharge into rivers

ICS
27.14
CCS
P56
发布
2014-04-22
实施
2014-07-22

本标准规定了水资源论证报告书编制的基本要求,适用于各类建设项目水资源论证报告书的编制和审查,指导行业建设项目水资源论证技术标准的编制。

The guidelines for water resources assessment of construction projects

ICS
27.140
CCS
P56
发布
2013-12-05
实施
2014-03-05

本标准规定了中小河道综合治理规划编制的基本规定、规划内容与成果要求。本标准适用于北京市行政区划内流域面积小于1000km2的中小河道综合治理规划的编制,其它中小河道参照执行。本标准的5.3节~5.6节,分别适用于相应治理目标的中小河道单项治理规划的编制。

Guidelines for comprehensive management planning of medium and small rivers

ICS
93.160
CCS
P56
发布
2011/04/01
实施
2011/04/01

本标准规定了河流水电规划的原则、内容、工作深度和技术要求,以及规划报告的编写要求。 本标准适用于河流水电规划的编制及修编。

Specification on compiling hydropower planning of river

ICS
27.140
CCS
P56
发布
2010-08-27
实施
2010-12-15

DB11/T 387的本部分规定了河道、渠道整治工程项目划分,质量评定标准,质量评定工作的组织和管理。本部分适用于北京市辖区内的河道、渠道整治工程施工质量评定.湖泊整治工程可参照执行

Assessment standard for construction quality of water resources projects Part one:River training

ICS
93.16
CCS
P56
发布
2006-11-8
实施
2007-2-1

本规范适用于大江大河和重要中等河流的流域综合规划或专业规划的环境影响评价。区域综合规划或专业规划、一般中小河流的流域综合规划或专业规划的环境影响评价,可参照本规范执行。

Regulation for environmental impact assessment of river basin planning

ICS
13.020.70
CCS
P56
发布
2006-10-23
实施
2006-12-01

本标准适用于水资源论证报告书的编制和审查。 水资源论证应遵循以下原则: 1 合理开发、节约使用和有效保护水资源。 2 符合国家法律、法规和相关政策的规定。 3 符合国家标准和行业标准。 4 符合流域或区域的综合规划及相关专业规划。 5遵守经批准的水量分配方案或协议。

Guidelines for assessment of water-draw and utilization in construction projects

ICS
27.140
CCS
P56
发布
2005-05-12
实施
2005-05-12

This document is applicable together with parts 10 and 11 for flood control reservoirs which are able to retain floods in river valleys, dry valleys and polder areas, which have no or only small active storages in comparison with the flood storages.

Dam plants - Part 12: Flood retarding basins

ICS
93.160
CCS
P56
发布
2004-07
实施

This document is applicable together with parts 10 and 11 to weirs and their adjacent embankment dams, which ar useful to lift the water level of a river permanent or temporary. It gives the principles for the design of the constructions as well as for the security of the plants and the operation.#,,#

Dam plants - Part 13: Weirs

ICS
93.160
CCS
P56
发布
2004-07
实施

This standard is applicable together with DIN 19700-10 Planning, construction, operation and maintenance for new and existing dams. Further regulations of DIN 19700-12 have to be observed in case of stormwater protection of multifunctional used dams. This is also valid for all other parts of DIN 19700.

Dam plants - Part 11: Dams

ICS
93.160
CCS
P56
发布
2004-07
实施

Dam plants - Part 14: Pumped-storage reservoirs

ICS
93.160
CCS
P56
发布
2004-07
实施

This document is applicable for setting ponds together with parts 10 and 11. The setting ponds serve the retaining of suspended matters in industrial waste water. There is given a classification of the plants together with basic requirements for design, construction, operation and control.

Dam plants - Part 15: Setting ponds

ICS
93.160
CCS
P56
发布
2004-07
实施

This document is applicable for dam plants including their appurtenant works and storage rerservoirs. It deals with overlapping and generally applicable requirements with respect to all types of dam plants. Specifications for different types of dam plants are given in the other parts 11 to 15 of this standard. In this part 10 the principles for design, construction, operation and control for new plants are given but in addition also for existing plants and their alterations in construction and operation.

Dam plants - Part 10: General specifications

ICS
93.160
CCS
P56
发布
2004-07
实施

Technical code of shrub cultivation on the loess plateau

ICS
27.140
CCS
P56
发布
2003-05-26
实施
2003-06-01

Recommendations to preserve and extend sludge utilization and disposal routes

ICS
13.060.30;13.030.20
CCS
P56
发布
2000-05-15
实施
2000-05-15



Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号