Grid-connected test procedures

Grid-connected test procedures, Total:332 items.

In the international standard classification, Grid-connected test procedures involves: Solar energy engineering, HEALTH CARE TECHNOLOGY, Power transmission and distribution networks, Power stations in general, Installations in buildings, Electrical engineering in general, Test conditions and procedures in general, Rotating machinery, Hydraulic energy engineering, Terminology (principles and coordination), Radiocommunications, Wind turbine systems and other alternative sources of energy, Telecommunication systems, Applications of information technology, Road vehicles in general, Fishing and fish breeding, Road engineering, Telecommunication terminal equipment, Interface and interconnection equipment, Nuclear energy engineering, Technical product documentation, Road vehicle systems, Astronomy. Geodesy. Geography, Alarm and warning systems, Electromagnetic compatibility (EMC), Information technology (IT) in general, Networking, Transformers. Reactors, Fasteners, External structures, Galvanic cells and batteries, Domestic electrical appliances in general, Railway engineering in general, Thermodynamics and temperature measurements, Environmental protection, Fibre optic communications, Construction industry, Integrated Services Digital Network (ISDN), Farming and forestry, Equipment for petroleum and natural gas industries, Geology. Meteorology. Hydrology, Electric road vehicles, Railway rolling stock, Valves, Shipbuilding and marine structures in general, Construction materials, Electricity. Magnetism. Electrical and magnetic measurements, Earth-moving machinery, Tyres, Lifting equipment, Agricultural machines, implements and equipment, Components and accessories for telecommunications equipment, Vocabularies, Open systems interconnection (OSI), Energy and heat transfer engineering in general, Construction equipment, Earthworks. Excavations. Foundation construction. Underground works.


Professional Standard - Energy, Grid-connected test procedures

  • NB/T 10323-2019 Test procedures for distributed photovoltaic power generation grid-connected interface devices
  • NB/T 10316-2019 Specifications for grid-connected performance test of dynamic reactive power compensation device for wind farms
  • NB/T10316-2019
  • DL/T 2246.1-2021 Electrochemical energy storage power station grid-connected operation and control technical specification part 1: grid-connected operation and debugging
  • DL/T 2248.2-2021 Grid connection and operation of mobile vehicle-mounted energy storage power station Part 2: Operating procedures
  • NB/T 33016-2014 Code for testing of electrochemical energy storage system interconnecting with distribution network
  • DL/T 2246.9-2021 Electrochemical Energy Storage Power Station Grid-connected Operation and Control Technical Specification Part 9: Simulation Calculation Model and Parameter Measurement
  • NB/T 20172-2012 Technical rules for nuclear engineering surveying datum network establishment
  • NB/T 35102-2017 In situ test procedure for geotechnical boreholes in hydropower projects
  • NB/T 33011-2014 Technical specification for test of equipments interconnecting distributed resources with power grid

Group Standards of the People's Republic of China, Grid-connected test procedures

  • T/CEC 469-2021 Medium Voltage Grid-connected Photovoltaic Inverter Testing Regulations
  • T/CEC 334-2020 Grid-connected testing procedures for household photovoltaic power generation systems
  • T/CPIA 0010-2019 Grid-connected photovoltaic system documentation, inspection and testing technical specifications
  • T/GDC 61-2020 Performance test specification for centralized large scale grid connected photovoltaic power generation system
  • T/GSEA 004-2020 Rooftop grid-connected photovoltaic(PV) power system - Commissioning specification
  • T/CEC 224-2019 Analog power supply for low-voltage grid-connected test of distributed power supply
  • T/CEC 467-2021 Hardware-in-the-loop simulation test method for grid-connected performance of photovoltaic inverters
  • T/EPIAJL 9-2023 Jilin grid-connected power plant substation electrical energy remote terminal commissioning and acceptance specification
  • T/CPIA 0011.3-2019 Household Photovoltaic Grid-connected Power Generation System Part 3: Specifications for Installation and Commissioning
  • T/SSAE 2-2021 5G internet of vehicles terminal performance requirements and Tests Procedures
  • T/CSTM 00262-2022 Conversion efficiency of string grid-connected PV inverter—outdoor performance test
  • T/CSAE 252-2022 Intelligent and connected vehicle on-board terminal cyber security test methods
  • T/LZBX 021-2022 Liuzhou Intelligent Connected Vehicle Closed Site Test Regulations
  • T/CEC 146-2018 Microgrid access distribution network test specification
  • T/ITS 0146-2020 System of intelligent connected sweeper machine Technical requirements and test procedures
  • T/GHDQ 89.2-2022 On board network security test specification Part 2: on board Ethernet safety test specification
  • T/GHDQ 99-2022 Test Specification for telematics box of intelligent and connected vehicles
  • T/SXSAE 002-2022 Closed field test procedures for autonomous driving functions of intelligent and connected vehicles
  • T/ZZXJX 111-2021 Urban Road Internet of Things Monitoring Technical Regulations
  • T/WAPIA 037.2-2021 Testing of wireless local area network—Part 2: Specification for equipment testing
  • T/CSEE 0279-2021 Commissioning Regulations for Medium Voltage Flexible DC Distribution Network System
  • T/CECS 779-2021 Technical regulations for inspection and maintenance of steel grid sheds in traffic engineering
  • T/CECS 869-2021 Technical specification for on-line monitoring of urban drainage pipe network
  • T/CRS C0202-2021 Code for ln-situ Stress Measurement of Railway Engineering
  • T/JSEE 003-2020 Test specification for miniature synchrophasor measurement device for distribution network
  • T/ZJNJ 0018-2023 Soil nutrient test procedure
  • T/CAGHP 066-2019 Engineering technical specification for rockfall flexible protective net (trial)
  • T/CECS 680-2020 Specification for test of indirect dry cooling tower
  • T/CECS 55-2020 The specifications for in-situ tests of groundwater
  • T/CES 096-2022 Test specification for grid connection of flywheel energy storage system
  • T/HZBX 050-2022 Integrated Test Specification of Networked Collaborative Manufacturing System
  • T/GDCSA 006-2021 Specification for the ability evaluation of cyber security testing teams
  • T/GHDQ 89.1-2022 On board network security test specification Part 1: safety test specification for on-board can bus
  • T/CSEE 0241.27-2021 Flexible DC Grid Part 27: Equipment Handover Test Procedures
  • T/ZZXJX 094-2021 Anchor bolt internal force test technical regulations

Shanghai Provincial Standard of the People's Republic of China, Grid-connected test procedures

  • DB31/T 744-2013 Technical specification for grid-connected device testing of smart grid energy storage system
  • DB31/T 744-2022 Technical specification for grid-connected device testing of smart grid energy storage system
  • DB31/T 370.2-2006 Broadband Access Engineering Series Standards Part 2: Wireless Local Area Network Engineering Construction and Acceptance Test Specifications

Danish Standards Foundation, Grid-connected test procedures

  • DS/EN 62116:2011 Test procedure of islanding prevention measures for utility-interconnected photovoltaic inverters
  • DS/EN 62446:2010 Grid connected photovoltaic systems – Minimum requirements for system documentation, commissioning tests and inspection
  • DS/I-ETS 300697-3:1999 Integrated Services Digital Network (ISDN) - Conformance testing for the Euro-ISDN Programming Communication Interface (PCI) - Part 3: Test Suite Structure and Test Purposes (TSS& TP) specification for the Network Access Facility (NAF)
  • DS/I-ETS 300697-4:1999 Integrated Services Digital Network (ISDN) - Conformance testing for the Euro-ISDN Programming Communication Interface (PCI) - Part 4: Abstract Test Suite (ATS) specification for the Network Access Facility (NAF)

AENOR, Grid-connected test procedures

  • UNE 206006:2011 IN Performance tests for islanding detection of multiple grid-connected photovoltaic inverters in parallel.
  • UNE-EN 62116:2014 V2 Utility-interconnected photovoltaic inverters - Test procedure of islanding prevention measures
  • UNE-EN 62446:2011 Grid connected photovoltaic systems. Minimum requirements for system documentation, commissioning tests and inspection
  • UNE-EN 1414:1997 TOUCH AND CLOSE FASTENERS. CYCLING PROCEDURE FOR SUBSEQUENT TESTING.
  • UNE-EN 1414/A1:2001 Touch and close fasteners. Cycling procedure for subsequent testing.
  • UNE-EN 62446-1:2017 Photovoltaic (PV) systems - Requirements for testing, documentation and maintenance - Part 1: Grid connected systems - Documentation, commissioning tests and inspection
  • UNE 28538:1984 AIR LAND CARGO PALLET NETS. SPECIFICATION AND TESTING.

Henan Provincial Standard of the People's Republic of China, Grid-connected test procedures

  • DB41/T 1277-2016 Technical specifications for performance testing of grid-connected photovoltaic power generation systems

CN-QIYE, Grid-connected test procedures

British Standards Institution (BSI), Grid-connected test procedures

  • BS EN 62116:2011 Test procedure of islanding prevention measures for utility-interconnected photovoltaic inverters
  • BS EN 62446-1:2016+A1:2018 Photovoltaic (PV) systems. Requirements for testing, documentation and maintenance. Grid connected systems. Documentation, commissioning tests and inspection
  • BS EN IEC 62446-2:2020 Photovoltaic (PV) systems. Requirements for testing, documentation and maintenance - Grid connected systems. Maintenance of PV systems
  • 21/30419209 DC BS EN IEC 62909-3. Bi-directional grid connected power converters. Part 3. EMC requirements and test methods
  • 20/30398805 DC BS EN IEC 62446-1. Photovoltaic (PV) systems. Requirements for testing, documentation and maintenance. Part 1. Grid connected systems. Documentation, commissioning tests and inspection
  • 23/30456172 DC BS EN IEC 63409-3. Photovoltaic power generating systems connection with grid. Testing of power conversion equipment - Part 3: Basic operations
  • 22/30454424 DC Secondary cells and batteries for renewable energy storage - General requirements and methods of test - Part 2: On-grid applications
  • BS ISO 15118-4:2018 Road vehicles. Vehicle to grid communication interface. Network and application protocol conformance test
  • 18/30348744 DC BS EN 62446-2. Photovoltaic (PV) systems. Requirements for testing, documentation and maintenance. Part 2. Grid connected systems. Maintenance of PV systems
  • BS EN 61427-2:2015 Tracked Changes. Secondary cells and batteries for renewable energy storage. General requirements and methods of test. On-grid applications

Professional Standard - Electricity, Grid-connected test procedures

  • DL/T 281-2012 Testing Specification on Merging Unit
  • DL/T 2579-2022 Grid-connected test procedures for electrochemical energy storage systems on the power side participating in auxiliary frequency regulation
  • DL/T 2070-2019 Field test procedure for ultra-high voltage magnetic control type controllable shunt reactor
  • DL/T 1753-2017 Condition-based maintenance test procedures for distribution network equipment
  • DL/T 2392-2021 10kV Distribution Network Primary Power Equipment Handover Test Regulations
  • DL/T 1730-2017 Test specification for electric power information network equipment
  • DL/T 1379-2014 Test specification for equipments of electric power dispatching data network
  • DL/T 1510-2016 Power System Optical Transport Network (OTN) Test Specification
  • DL/T 1027-2006 Acceptance test specification of industrial cooling tower
  • DL/T 5367-2007 Code for rock mass stress measurements of hydroelectric and water conservancy engineering
  • DL/T 1940-2018 Smart Substation Ethernet Switch Test Specification

Inner Mongolia Provincial Standard of the People's Republic of China, Grid-connected test procedures

  • DB15/T 1428-2018 Operation and maintenance procedures for large-scale grid-connected photovoltaic power stations
  • DB15/T 1393-2018 Specifications for price calculation of Internet of Things engineering construction

Professional Standard - Urban Construction, Grid-connected test procedures

  • GB/T 51338-2018 Distributed power grid-connected engineering commissioning and acceptance standards
  • CJJ 159-2011 Technical specification for leak detection of water supply pipe nets in cities and towns
  • CJJ/T 215-2014 Technical specification for leak detection of city gas piping system

Standard Association of Australia (SAA), Grid-connected test procedures

  • AS/NZS IEC 62116:2020 Utility-interconnected photovoltaic inverters — Test procedure of islanding prevention measures
  • AS/NZS 3198:1996 Approval and test specification - Electric cables - XLPE insulated - For working voltages up to and including 0.6/1 kV
  • AS/NZS 3155:1995 Approval and test specification - Electric cables - Neutral screened - For working voltages up to and including 0.6/1 KV
  • AS/NZS 3116:1996 Approval and test specification - Electric cables - Elastomer insulated - For woeking voltages up to and including 0.6/1 KV

Lithuanian Standards Office , Grid-connected test procedures

  • LST EN 62116-2011 Test procedure of islanding prevention measures for utility-interconnected photovoltaic inverters (IEC 62116:2008, modified)
  • LST EN 62446-2010 Grid connected photovoltaic systems - Minimum requirements for system documentation, commissioning tests and inspection (IEC 62446:2009)

Ningxia Provincial Standard of the People's Republic of China, Grid-connected test procedures

  • DB64/T 795-2012 Technical regulations for grid-connected photovoltaic power generation applications in civil buildings

能源, Grid-connected test procedures

  • NB/T 32026-2015 Photovoltaic power station grid-connected performance testing and evaluation methods

国家市场监督管理总局、中国国家标准化管理委员会, Grid-connected test procedures

  • GB/T 37409-2019 Testing specification for photovoltaic grid-connected inverter
  • GB/T 40595-2021 Guide for technology and test on primary frequency control of grid-connected power resource
  • GB/T 36994-2018 Wind turbines—Test procedure of grid adaptability
  • GB/T 30269.805-2019 Information technology—Sensor networks—Part 805: Testing: Sensor gateway test specification
  • GB/T 36548-2018 Test specification for electrochemical energy storage system connected to power grid

American National Standards Institute (ANSI), Grid-connected test procedures

国家能源局, Grid-connected test procedures

  • NB/T 42087-2016 Consolidated unit test equipment technical specifications
  • NB/T 10185-2019 Technical specifications for performance testing and quality assessment of key equipment used in grid-connected photovoltaic power stations
  • NB/T 20504-2018 Technical regulations for microgrid measurement of nuclear island projects in nuclear power plants
  • SY/T 5483-2017 Technical regulations for routine formation testing
  • NB/T 35101-2017 Technical regulations for elastic wave testing in hydropower projects

Beijing Provincial Standard of the People's Republic of China, Grid-connected test procedures

  • DB11/T 1672-2019 Technical specification for construction project evaluation of household grid-connected photovoltaic power generation system
  • DB11/T 386-2006 Management Specification of Inspection and Test for Construction Engineering
  • DB11/T 386-2017 Regulations for the Administration of Inspection and Testing of Construction Projects

Professional Standard - Petroleum, Grid-connected test procedures

  • SY/T 6033-1994 Technical Regulations for Maintenance and Calibration of Parallel Logging Tool
  • SY/T 5483-2005 Technology procedure for conventional drill stem testing
  • SY/T 5483-1997 Technology criteria for conventional drill stem testing
  • SY/T 5692-1995 Cable Formation Tester Test Operation Regulations
  • SY/T 5486-1999 Technology procedure for non-conventional drill stem testing
  • SY/T 5486-2010 Technical regulation for non-conventional drill stem testing
  • SY 5486-2010 Technical Regulations for Unconventional Formation Testing

Xinjiang Provincial Standard of the People's Republic of China, Grid-connected test procedures

  • DB65/T 2219-2005 Measurement and assessment of power quality characteristics of grid connected stall regulation wind turbine generator system
  • DB65/T 2220.2-2005 Installation test check and acceptance standard of grid connected stall regylation wind turbine generator system Part2:500 hours cimmissioning regulation
  • DB65/T 4656-2023 New energy fast frequency response function network access test procedures

Indonesia Standards, Grid-connected test procedures

  • SNI IEC 62446:2016 Sistem fotovoltaik terhubung ke jaringan listrik - Persyaratan minimum untuk sistem dokumentasi, uji komisioning dan inspeksi

Korean Agency for Technology and Standards (KATS), Grid-connected test procedures

  • KS C IEC 62446-2012(2022) Grid connected photovoltaic systems-Minimum requirements for system documentation, commissioning tests and inspection
  • KS B 8302-2016 Control device for connecting regeneration power of elevator and escalator system to grid-Part 1-1:Elevator-Measuring and testing method
  • KS B 8303-2016 Control device for connecting regeneration power of elevator and escalator system to grid-Part 1-2:Escalator-Measuring and testing method
  • KS R 1135-2001(2016) Energy consumption and range test procedure of electric vehicles

European Committee for Electrotechnical Standardization(CENELEC), Grid-connected test procedures

  • EN 62116:2011 Test procedure of islanding prevention measures for utility-interconnected photovoltaic inverters (Remains Current)
  • EN 62116:2014 Utility-interconnected photovoltaic inverters - Test procedure of islanding prevention measures
  • EN 62446-1:2016 Photovoltaic (PV) systems - Requirements for testing, documentation and maintenance - Part 1: Grid connected systems - Documentation, commissioning tests and inspection
  • EN IEC 62446-2:2020 Photovoltaic (PV) systems - Requirements for testing, documentation and maintenance - Part 2: Grid connected systems - Maintenance of PV systems
  • EN 61427-2:2015 Secondary cells and batteries for renewable energy storage - General requirements and methods of test - Part 2: On-grid applications

未注明发布机构, Grid-connected test procedures

  • NB/T 31054-2014 Wind turbine grid adaptability test procedures
  • NB 20504-2018 Technical regulations for microgrid measurement of nuclear island projects in nuclear power plants
  • GJB 38.26B-2020 Conventional Submarine Mooring and Navigation Test Procedures Part 26: Power Network Test
  • GJB 38.27B-2020 Conventional Submarine Mooring and Navigation Test Procedures Part 27: Lighting Grid Test
  • GJB 4104.1-2000 Small arms test procedures Firearms
  • GJB 4104.2-2000 Small arms test procedures for ammunition

ES-UNE, Grid-connected test procedures

  • UNE 217002:2020 Grid connected inverters. Testing of requirements for DC grid injection, overvoltage generation and island operation detection system
  • UNE-EN 62446-1:2017/A1:2019 Photovoltaic (PV) systems - Requirements for testing, documentation and maintenance - Part 1: Grid connected systems - Documentation, commissioning tests and inspection
  • UNE-EN 50549-10:2022 Requirements for generating plants to be connected in parallel with distribution networks - Part 10: Tests for conformity assessment of generating units (Endorsed by Asociación Española de Normalización in January of 2023.)
  • UNE-EN IEC 62446-2:2020 Photovoltaic (PV) systems - Requirements for testing, documentation and maintenance - Part 2: Grid connected systems - Maintenance of PV systems (Endorsed by Asociación Española de Normalización in August of 2020.)
  • UNE-EN 61427-2:2015 Secondary cells and batteries for renewable energy storage - General requirements and methods of test - Part 2: On-grid applications (Endorsed by AENOR in January of 2016.)

US-Unspecified Preparing Activity, Grid-connected test procedures

Guizhou Provincial Standard of the People's Republic of China, Grid-connected test procedures

  • DB52/T 1211-2017 Grid connection test and detection index of digital electro-hydraulic control system for steam turbine in power station
  • DB52/T 1335-2018 Specifications for outdoor wireless local area network engineering measurement

Professional Standard - Post and Telecommunication, Grid-connected test procedures

  • YD/T 4363-2023
  • YD/T 1257-2003 Test specification of supplementary specification of IN CS-1 INAP
  • YDN 107.1-1999 Specification for test of intelligent network application protocol (INAP) Service control point (SCP) part (internal standard)
  • YDN 107.2-1999 Specification for test of intelligent network application protocol (INAP) Service switching point (SSP) part (internal standard)
  • YD/T 2538-2013 Network number portability acceptance process test method
  • YD/T 4248-2023 Telecommunications network and Internet API data security technical requirements and test methods

US-CFR-file, Grid-connected test procedures

  • CFR 40-790.62-2013 Protection of Environment. Part790:Procedures governing testing consent agreements and test rules. Section790.62:Submission of study plans and conduct of testing.

International Electrotechnical Commission (IEC), Grid-connected test procedures

  • IEC 62446-1:2018 Photovoltaic (PV) systems - Requirements for testing, documentation and maintenance - Part 1: Grid connected systems - Documentation, commissioning tests and inspection
  • IEC 62446-1:2016/AMD1:2018 Photovoltaic (PV) systems - Requirements for testing, documentation and maintenance - Part 1: Grid connected systems - Documentation, commissioning tests and inspection; Amendment 1
  • IEC 61427-2:2015 Secondary cells and batteries for renewable energy storage - General requirements and methods of test - Part 2: On-grid applications

Fujian Provincial Standard of the People's Republic of China, Grid-connected test procedures

  • DB35/T 1443-2014 Wide Area Network General Inspection Regulations
  • DB35/T 1604-2016 Technical Specifications for Network RTK Elevation Measurement of Continuous Operation Reference Station Network

RO-ASRO, Grid-connected test procedures

  • STAS 8393/17-1970 Basic environmental testing procedures for electronic components and electronic equipment DROP AND TOPPLE Testing procedure
  • STAS 8393/17-1-1970 Basic environmental testing procedures for electronic components and electronic equipment DROP AND TOPPLE Testing methods
  • SR ISO 4310:1996 Cranes - Test code and procedures
  • STAS 8393/1-1986 ENVIRONMENTAL TESTING PROCEDURES General specifications

中华人民共和国国家质量监督检验检疫总局、中国国家标准化管理委员会, Grid-connected test procedures

  • GB/T 35726-2017 Performance tesing rules of parallel active power quality curing device
  • GB/T 34129-2017 Specification for test of microgrid connected to distribution network
  • GB/T 32420-2015 Specification for testing of wireless local area network

European Committee for Standardization (CEN), Grid-connected test procedures

  • EN ISO 16663-2:2003 Fishing nets Method of test for the determination of mesh size Part 2: Length of mesh ISO 16663-2:2003; Incorporating Corrigendum April 2006
  • EN ISO 14688-1:2013 Geotechnical investigation and testing - Identification and classification of soil - Part 1: Identification and description (Incorporates Amendment A1: 2013)

German Institute for Standardization, Grid-connected test procedures

  • DIN 19242-14:1987-01 Measurement and control; performance tests on process computer systems; time measurement; function tested: generation of a executable code and program start

Association Francaise de Normalisation, Grid-connected test procedures

  • NF EN 62446-1/A1:2018 Systèmes photovoltaïques (PV) - Exigences pour les essais, la documentation et la maintenance - Partie 1 : systèmes connectés au réseau électrique - Documentation, essais de mise en service et examen
  • NF EN 62446-1:2017 Systèmes photovoltaïques (PV) - Exigences pour les essais, la documentation et la maintenance - Partie 1 : systèmes connectés au réseau électrique - Documentation, essais de mise en service et examen
  • NF C57-346-1*NF EN 62446-1:2017 Photovoltaic (PV) systems - Requirements for testing, documentation and maintenance - Part 1 : grid connected systems - Documentation, commissioning tests and inspection
  • NF C57-346-1/A1*NF EN 62446-1/A1:2018 Photovoltaic (PV) systems - Requirements for testing, documentation and maintenance - Part 1 : grid connected systems - Documentation, commissioning tests and inspection
  • NF EN IEC 62446-2:2020 Systèmes photovoltaïques (PV) - Exigences pour les essais, la documentation et la maintenance - Partie 2 : systèmes connectés au réseau électrique - Maintenance des systèmes PV
  • NF EN 50549-10:2022 Exigences relatives aux centrales électriques destinées à être raccordées en parallèle à des réseaux de distribution - Partie 10 : essais d'évaluation de la conformité des unités de production
  • NF C57-346-2*NF EN IEC 62446-2:2020 Photovoltaic (PV) systems - Requirements for testing, documentation and maintenance - Part 2 : grid connected systems - Maintenance of PV systems
  • NF C93-845-2*NF EN 62150-2:2011 Fibre optic active components and devices - Test and measurement procedures - Part 2 : ATM-PON transceivers.
  • NF C58-427-2*NF EN 61427-2:2016 Secondary cells and batteries for renewable energy storage - General requirements and methods of test - Part 2 : on-grid applications
  • XP C93-927:2016 Optical external network test interface (OENTI) - Product specification
  • XP C93-927-2016 Optical external network test interface (OENTI) - Product specification
  • NF EN 60931-1:1997 Condensateurs shunt de puissance non autorégénérateurs pour réseaux à courant alternatif de tension assignée inférieure ou égale à 1000 V - Partie 1 : généralités. Caractéristiques fonctionnelles, essais et valeurs assignées. Règles de s...

National Metrological Verification Regulations of the People's Republic of China, Grid-connected test procedures

API - American Petroleum Institute, Grid-connected test procedures

  • API STD 5LX-1958 SPECIFICATION FOR HIGH-TEST LINE PIPE (Eighth Edition; Incorporating Supplement 1: March 1959)

European Telecommunications Standards Institute (ETSI), Grid-connected test procedures

  • ETSI ETR 193-1995 Methods for Testing and Specification (MTS); Network Integration Testing (NIT); Methodology Aspects; Test Co-Ordination Procedure (TCP) Style Guide
  • ETSI TR 102 235-2003 Methods for Testing and Specification (MTS); Internet Protocol Testing (IPT); Pre-normative Study for IPv6 Testing (V1.1.1)
  • ETSI I-ETS 300 697-3-1998 Integrated Services Digital Network (ISDN); Conformance Testing for the Euro-ISDN Programming Communication Interface (PCI); Part 3: Test Suite Structure and Test Purposes (TSS&TP) Specification for the Network Access Facility (NAF)
  • ETSI PRI-ETS 300 697-3-1997 Integrated Services Digital Network (ISDN); Conformance Testing for the Euro-ISDN Programming Communication Interface (PCI); Part 3: Test Suite Structure and Test Purposes (TSS&TP) Specification for the Network Access Facility (NAF)
  • ETSI TS 103646 V 1.1.1-2021 Methods for Testing and Specification (MTS) - Test Specification for foundational Security IoT-Profile
  • ETSI I-ETS 300 697-4-1998 Integrated Services Digital Network (ISDN); Conformance Testing for the Euro-ISDN Programming Communication Interface (PCI); Part 4: Abstract Test Suite (ATS) Specification for the Network Access Facility (NAF)
  • ETSI GS NFV-TST 010 V 3.3.1-2021 Network Functions Virtualisation (NFV) Release 3 - Testing - API Conformance Testing Specification
  • ETSI GS NFV-TST 010 V 2.8.1-2021 Network Functions Virtualisation (NFV) Release 2 - Testing - API Conformance Testing Specification
  • ETSI EG 202 568-2007 Methods for Testing and Specification (MTS); Internet Protocol Testing (IPT); Testing: Methodology and Framework (V1.1.3)
  • ETSI GS NFV-TST 009 V 3.4.1-2020 Network Functions Virtualisation (NFV) Release 3 - Testing - Specification of Networking Benchmarks and Measurement Methods for NFVI
  • ETSI TR 102 422-2005 Methods for Testing and Specification (MTS) IMS Network Integration Testing Infrastructure Testing Methodology (V1.1.1)
  • ETSI ETS 300 836-3-1998 Broadband Radio Access Networks (BRAN); HIgh PErformance Radio Local Area Network (HIPERLAN) Type 1; Conformance Testing Specification; Part 3: Test Suite Structure and Test Purposes (TSS&TP) Specification
  • ETSI EG 201 299-1-1999 Integrated Services Digital Network (ISDN); Network Integration Testing (NIT); ISDN/PSTN End-To-End Testing; Part 1: Test Suit Structure and Test Purposes (TSS&TP) Specificaation V2.1.1
  • ETSI EG 201 299-1-2000 Integrated Services Digital Network (ISDN); Network Integration Testing (NIT); ISDN/PSTN End-To-End Testing; Part 1: Test Suit Structure and Test Purposes (TSS&TP) Specificaation
  • ETSI EG 201 901-1-2001 Broadband Integrated Services Digital Network (B-ISDN); Network Integration Testing; End-To-End Testing; Part 1: Test Suite Structure and Test Purposes (TSS&TP) Specification
  • ETSI GS NFV-TST 009-2020 Network Functions Virtualisation (NFV) Release 3; Testing; Specification of Networking Benchmarks and Measurement Methods for NFVI (V3.4.1)
  • ETSI EG 201 299-2-1999 Integrated Services Digital Network (ISDN); Network Integration Testing (NIT); ISDN End-to-End Testing; Part 2: Abstract Test Suite (ATS) and Partial Protocol Implementation Extra Information for Testing (PIXIT) Proforma for the Network V2.1.1
  • ETSI EG 201 299-2-2000 Integrated Services Digital Network (ISDN); Network Integration Testing (NIT); ISDN End-to-End Testing; Part 2: Abstract Test Suite (ATS) and Partial Protocol Implementation eXtra Information for Testing (PIXIT) Proforma for the Network
  • ETSI TS 101 335-1999 Telecommunications and Internet Protocol Harmonization Over Networks (TIPHON); Test Specifications V2.1.4

ETSI - European Telecommunications Standards Institute, Grid-connected test procedures

  • ETR 193-1995 Methods for Testing and Specification (MTS); Network Integration Testing (NIT); Methodology Aspects; Test Co-Ordination Procedure (TCP) Style Guide
  • TR 102 235-2003 Methods for Testing and Specification (MTS); Internet Protocol Testing (IPT); Pre-normative Study for IPv6 Testing (V1.1.1)
  • TR 103 503-2018 Speech and multimedia Transmission Quality (STQ); Procedures for Multimedia Transmission Quality Testing with Parallel Task including Subjective Testing (V1.2.1)
  • TR 102 422-2005 Methods for Testing and Specification (MTS) IMS Network Integration Testing Infrastructure Testing Methodology (V1.1.1)
  • I-ETS 300 697-3-1998 Integrated Services Digital Network (ISDN); Conformance Testing for the Euro-ISDN Programming Communication Interface (PCI); Part 3: Test Suite Structure and Test Purposes (TSS&TP) Specification for the Network Access Facility (NAF)
  • PRI-ETS 300 697-3-1997 Integrated Services Digital Network (ISDN); Conformance Testing for the Euro-ISDN Programming Communication Interface (PCI); Part 3: Test Suite Structure and Test Purposes (TSS&TP) Specification for the Network Access Facility (NAF)
  • EG 201 299-1-2000 Integrated Services Digital Network (ISDN); Network Integration Testing (NIT); ISDN/PSTN End-To-End Testing; Part 1: Test Suit Structure and Test Purposes (TSS&TP) Specificaation (V2.1.1)
  • EG 201 299-1-1999 Integrated Services Digital Network (ISDN); Network Integration Testing (NIT); ISDN/PSTN End-To-End Testing; Part 1: Test Suit Structure and Test Purposes (TSS&TP) Specificaation (V2.1.1)
  • EG 202 568-2007 Methods for Testing and Specification (MTS); Internet Protocol Testing (IPT); Testing: Methodology and Framework (V1.1.3)
  • TS 101 335-1999 Telecommunications and Internet Protocol Harmonization Over Networks (TIPHON); Test Specifications (V1.1.1)
  • I-ETS 300 697-4-1998 Integrated Services Digital Network (ISDN); Conformance Testing for the Euro-ISDN Programming Communication Interface (PCI); Part 4: Abstract Test Suite (ATS) Specification for the Network Access Facility (NAF)
  • TS 102 901-2011 IMS Network Testing (INT); IMS NNI Interoperability Test Specifications; IMS NNI interoperability test descriptions for RCS (V1.1.1)
  • EG 201 901-1-2001 Broadband Integrated Services Digital Network (B-ISDN); Network Integration Testing; End-to-End Testing; Part 1: Test Suite Structure and Test Purposes (TSS&TP) Specification (V1.1.1)
  • GS NFV-TST 009-2019 Network Functions Virtualisation (NFV) Release 3; Testing; Specification of Networking Benchmarks and Measurement Methods for NFVI (V3.2.1)
  • GS NFV-TST 009-2018 Network Functions Virtualisation (NFV) Release 3; Testing; Specification of Networking Benchmarks and Measurement Methods for NFVI (V3.1.1)
  • TS 101 804-2-2002 Telecommunications and Internet Protocol Harmonization Over Networks (TIPHON) Release 3; Technology Compliance Specifications; Part 2: H.225.0 Conformance Test Specifications; Test Suite Structure and Test Purposes (TSS&TP) Specification for Terminal@ Gat
  • TS 102 811-2010 GRID; Grid Component Model (GCM); Interoperability test specification (V1.1.1; Includes Diskette)

未注明发布机构, Grid-connected test procedures

  • NB/T 31054-2014 Wind turbine grid adaptability test procedures
  • NB 20504-2018 Technical regulations for microgrid measurement of nuclear island projects in nuclear power plants
  • GJB 38.26B-2020 Conventional Submarine Mooring and Navigation Test Procedures Part 26: Power Network Test
  • GJB 38.27B-2020 Conventional Submarine Mooring and Navigation Test Procedures Part 27: Lighting Grid Test
  • GJB 4104.1-2000 Small arms test procedures Firearms
  • GJB 4104.2-2000 Small arms test procedures for ammunition

Chongqing Provincial Standard of the People's Republic of China, Grid-connected test procedures

  • DB50/T 1290-2022 Technical Specifications for Remote Monitoring System of Intelligent Connected Vehicle Road Test

International Telecommunication Union (ITU), Grid-connected test procedures

  • ITU-T X.229-1989 Remote Operations: Protocol Specification - Data Communication Networks - Open Systems Interconnection (OSI) Protocol Specifications, Conformance Testing (Study Group VII) 27 pp
  • ITU-T T.627-2021 Test specification for video surveillance networking
  • ITU-T Q.784.2 SPANISH-1997 ISUP Basic Call Test Specification: Abstract Test Suite for ISUP'92 Basic Call Control Procedures - Series Q: Switching and Signalling Specifications of Signalling System No. 7 - Test Specification Study Group 11; 97 pp

Hunan Provincial Standard of the People's Republic of China, Grid-connected test procedures

  • DB43/T 1599-2019 Hunan Province Network RTK Measurement Technical Regulations
  • DB43/T 2292.1-2022 Intelligent Connected Vehicle Autonomous Driving Function Test Regulations Part 1: Bus

Professional Standard - Ferrous Metallurgy, Grid-connected test procedures

工业和信息化部, Grid-connected test procedures

  • YD/T 2538-2019 Test method for inter-network number portability acceptance process
  • JB/T 13884-2020 Valve opening and closing torque test procedures

Society of Automotive Engineers (SAE), Grid-connected test procedures

General Administration of Quality Supervision, Inspection and Quarantine of the People‘s Republic of China, Grid-connected test procedures

  • GB/T 31365-2015 Testing code for photovoltaic power station connected to power grid
  • GB/T 36427-2018 Specification for conformance test of IoT household electrical appliance
  • GB/T 30152-2013 Testing code for photovoltaic generation system connected to distribution network
  • GB/T 30246.11-2013 Home network.Part 11:Specification for conformance test of interfaces in control network

Institute of Electrical and Electronics Engineers (IEEE), Grid-connected test procedures

  • IEEE Std C57.113-2010 IEEE Recommended Practice for Partial Discharge Measurement in Liquid-Filled Power Transformers and Shunt Reactors
  • IEEE P1909.1/D10.9, August 2014 IEEE Recommended Practice for Smart Grid Communications Equipment -- Test Methods and Installation Requirements
  • IEEE 1904.1/Conformance03-2014 Conformance Test Procedures for Service Interoperability in Ethernet Passive Optical Networks, IEEE Std 1904.1 Package C (Version 001.001)
  • IEEE Std 1502-2007 IEEE Recommended Practice for Radar Cross-Section Test Procedures
  • IEEE 1502-2020 IEEE Recommended Practice for Radar Cross-Section Test Procedures
  • IEEE Std 1502-2020 IEEE Recommended Practice for Radar Cross-Section Test Procedures
  • IEEE No 262*USAS C57.12.90-1968 USA Standard Test Code for Distribution , Power and Regulating Transformers, and Shunt Reactors
  • IEEE/ANSI 262-1968 USA Standard Test Code for Distribution , Power and Regulating Transformers, and Shunt Reactors

Military Standard of the People's Republic of China-General Armament Department, Grid-connected test procedures

  • GJB 2765.2-1996 Data Network Protocol Conformance Test Abstract Test Suite Specification
  • GJB 6769-2009 Protocols for exchange of information of the S-band aerospace TT&C network
  • GJB 6768-2009 Protocols for exchange of information of the C-band aerospace TT&C network
  • GJB 38.44-1987 Conventional Power Submarine Mooring and Navigation Test Regulations for Electric Power Network
  • GJB 164.44-1986 Landing ship mooring and navigation test procedures lighting network test
  • GJB 164.41-1986 Landing ship mooring and navigation test procedures Distribution circuit testing
  • GJB 4025-2000 Conventional weapons remote testing test procedures
  • GJB 7222-2011 Meterological element test procedures for conventional weapon examination
  • GJB 524.31-1988 Speedboat (planing boat) mooring and navigation test procedures Distribution circuit test
  • GJB 3602A-2015 Error code tester calibration procedures
  • GJB 350.51-1987 Surface combat ship mooring and navigation test procedures Distribution circuit testing
  • GJB 4389A-2014 The test procedure of dynamical parameter for firearms
  • GJB 4389-2002 Mechanical dynamic parameter testing procedures
  • GJB/J 3353-1998 Calibration procedures for extinction ratio tester
  • GJB/J 5230-2003 Calibration procedures for smoke density tester
  • GJB/J 3602-1999 Calibration procedures for bit error rate tester
  • GJB 9086-2017 Aerospace Engineering Space and Earth Measurement and Control Docking Test Procedures

SAE - SAE International, Grid-connected test procedures

IEEE - The Institute of Electrical and Electronics Engineers@ Inc., Grid-connected test procedures

  • IEEE C57.113-2010 Recommended Practice for Partial Discharge Measurement in Liquid-Filled Power Transformers and Shunt Reactors

National Metrological Technical Specifications of the People's Republic of China, Grid-connected test procedures

  • JJF 1277-2011 Calibration Specification for WLAN Test Set
  • JJF 1534-2015 Calibration Specification for Data Network Performance Testers

Professional Standard - Hydroelectric Power, Grid-connected test procedures

  • SD 140-1985 Code for field measurement of pumping stations

KR-KS, Grid-connected test procedures

  • KS B 8302-2023 Control device for connecting regeneration power of elevator and escalator system to grid — Part 1: Elevator — Measuring and testing method
  • KS B 8303-2023 Control device for connecting regeneration power of elevator and escalator system to grid — Part 2: Escalator — Measuring and testing method

American Society for Testing and Materials (ASTM), Grid-connected test procedures

  • ASTM D6982-09(2016) Standard Practice for Detecting Hot Spots Using Point-Net (Grid) Search Patterns
  • ASTM D6982-22 Standard Practice for Detecting Hot Spots Using Point-Net (Grid) Search Patterns

American Society of Mechanical Engineers (ASME), Grid-connected test procedures

  • ASME PTC 6S-1988 Performance Test Code - Steam Turbines, Simplified Procedures for Routine Tests

Professional Standard - Electron, Grid-connected test procedures

  • SJ/T 11313-2005 Specifications for conformance test on the interface for home backbone-network
  • SJ/T 11315-2005 Specifications for conformance test on the interface for home control sub-network

Professional Standard - Railway, Grid-connected test procedures

AT-OVE/ON, Grid-connected test procedures

  • OVE EN IEC 62446-2:2021 Photovoltaic (PV) systems - Requirements for testing, documentation and maintenance - Part 2: Grid connected systems - Maintenance of PV systems (german version)

CN-T/CECS, Grid-connected test procedures

Professional Standard - Ocean, Grid-connected test procedures

  • HY/T 232-2018 Specification for acceptance test of seawater cooling tower

Professional Standard-Ships, Grid-connected test procedures

Professional Standard - Recommended Standards for Engineering Construction, Grid-connected test procedures

  • CECS 118-2000 Specification for acceptance test of water-cooling tower
  • CECS 55-1993 SPECIFICATIONS FOR PORE PRESSURE MEASUREMENT

Acoustical Society of America (ASA), Grid-connected test procedures

  • ASA S12.69-2010 American National Standard Procedure for Testing Railroad Horns ex situ

Hubei Provincial Standard of the People's Republic of China, Grid-connected test procedures

Anhui Provincial Standard of the People's Republic of China, Grid-connected test procedures

  • DB34/T 3343-2019 Technical Regulations on Monitoring and Control of Platanus chinensis
  • DB34/T 1928-2013 Test procedures for cement-soil cut-off walls in water conservancy and hydropower projects

PL-PKN, Grid-connected test procedures

  • PN-EN IEC 62446-2-2020-12 E Photovoltaic (PV) systems - Requirements for testing, documentation and maintenance - Part 2: Grid connected systems - Maintenance of PV systems (IEC 62446-2:2020)
  • PN M47280 ArkusZ13-1974 Bali, tub? and screen discharge bal] ills pecification and testing

Professional Standard - Postal Service, Grid-connected test procedures

  • YZ/Z 0030-2001 Specifications for Networking Test of Sub-office Production Operation System

(U.S.) Joint Electron Device Engineering Council Soild State Technology Association, Grid-connected test procedures

  • JEDEC JEP147-2003 Procedure for Measuring Input Capacitance Using a Vector Network Analyzer (VNA)

(U.S.) Telecommunications Industries Association , Grid-connected test procedures

  • TIA J-STD-102-2011 JOINT ATIS/TIA CMAS FEDERAL ALERT GATEWAY TO CMSP GATEWAY INTERFACE TEST SPECIFICATION

ATIS - Alliance for Telecommunications Industry Solutions, Grid-connected test procedures

  • J-STD-102-2011 JOINT ATIS/TIA CMAS FEDERAL ALERT GATEWAY TO CMSP GATEWAY INTERFACE TEST SPECIFICATION

Alliance of Telecommunications Industry Solutions (ATIS), Grid-connected test procedures

  • ATIS J-STD-102-2011 JOINT ATIS/TIA CMAS FEDERAL ALERT GATEWAY TO CMSP GATEWAY INTERFACE TEST SPECIFICATION

U.S. Environmental Protection Agency (U.S. EPA), Grid-connected test procedures

GB-REG, Grid-connected test procedures

US-FCR, Grid-connected test procedures

GOSTR, Grid-connected test procedures

  • GOST R IEC 61427-2-2016 Secondary cells and batteries for renewable energy storage. General requirements and methods of test. Part 2. On-grid applications

CZ-CSN, Grid-connected test procedures

SE-SIS, Grid-connected test procedures

  • SIS SS CECC 00006-1983 Basic specification: Environmental test procedures Grundspezifikation: Umveltprufverfahren Specification de base: Procedures d'essais climatiques et de robustesse me'canique

TR-TSE, Grid-connected test procedures

Professional Standard - Water Conservancy, Grid-connected test procedures

Military Standard of the People's Republic of China-Commission of Science,Technology and Industry for National Defence, Grid-connected test procedures

Japanese Industrial Standards Committee (JISC), Grid-connected test procedures

Professional Standard - Machinery, Grid-connected test procedures

Liaoning Provincial Standard of the People's Republic of China, Grid-connected test procedures

机械工业部, Grid-connected test procedures

Shaanxi Provincial Standard of the People's Republic of China, Grid-connected test procedures

Professional Standard - Navy, Grid-connected test procedures

  • HJB 249.14-2001 Verification regulations for special test equipment for torpedoes Verification regulations for special test equipment for fish 3B SB203.50TS2A Fuze transmitter tester
  • HJB 249.11-2001 Verification regulations for special test equipment for torpedoes Verification regulations for special test equipment for fish 3B SB2038.00TS6 Rudder angle debugging platform

ECIA - Electronic Components Industry Association, Grid-connected test procedures

  • EIA-364-112-2010 TP-112 Contact Resistance and Current Rating of Parallel Circuits Test Procedure for Electrical Connectors@ Contacts and Sockets




Copyright ©2007-2023 ANTPEDIA, All Rights Reserved