P65 铁路工程 标准查询与下载



共找到 309 条与 铁路工程 相关的标准,共 21

本标准适用于铁路建设项目工程试验室管理工作。

Standard for engineering laboratory management of railway construction project

ICS
CCS
P65
发布
2009-08-21
实施
2009-08-21

This clause of Part 1 is applicable except as follows: This standard applies to PT systems which are intended to be mounted on@ or under the floor level and floor service units which are mounted on the floor@ under the floor or flush with the floor. NOTE 1 Types and applications are shown in Figures AA.1a@ AA.1b and AA.2 NOTE 2 Flush floor PT systems@ with the exception of flush floor service units@ are not covered by this standard.

Powertrack systems - Part 22: Particular requirements for powertrack systems intended for on floor or under floor installation

ICS
29.060.10;29.120.20;29.140.50
CCS
P65
发布
2009-01
实施
2014-06-25

本建设用地指标适用于新建客货共线铁路和客运专线铁路。货运专线铁路、城际铁路、厂矿标准轨距铁路专用线可参照执行。

Construction land indicators for new railway projects

ICS
CCS
P65
发布
2008-12-29
实施
2009-04-01

本技术指南适用于客货列车共线运行、旅客列车设计行车速度等于或小于200km/h的新建、改建标准轨距铁路轨道工程施工。

Technical Guidelines for the Construction of Passenger and Freight Collinear Railway Track Engineering

ICS
CCS
P65
发布
2008-10-20
实施
2008-10-20

为了加强北京市轨道交通设备安装工程质量管理,统一北京市轨道交通设备安装工程施工质量的验收,保证工程质量,制定本标准。本标准适用于北京市新建、改建、扩建等轨道交通设备安装工程施工质量的验收,凡在本标准中未做规定的,均按国家、行业及地方现行的有关强制性标准执行。施工单位作为工程施工质量控制的主体,应对工程施工质量进行全过程控制,建设单位、监理单位和勘察设计单位等各方应按有关规定的要求对施工阶段的工程质量进行控制。工程施工应贯彻国民经济可持续发展战略,做好环境保护等工作,合理利用资源,做到文明生产、安全施工。工程质量的检验检测工作取得的数据应真实可靠,完整、规范,全面反应工程质量状况。所用方法和仪器设备应符合现行国家标准的规定,检测单位或实验室要具有相应的检测资质。

Quality Acceptance Standards for Urban Rail Transit Engineering Part 2: Equipment Installation Engineering

ICS
93.100
CCS
P65
发布
2008/09/01
实施
2008/09/01

本规程适用于新建铁路路堑边坡光面(预裂)爆破工程。

Code for smooth(presplitting) blasting on cutting of railway

ICS
CCS
P65
发布
2008-07-09
实施
2008-07-09

本技术指南适用于旅客列车设计行车速度200 km/h的标准轨距,牵引网采用单相工频(50Hz)、标称电压为25 kV客货共线铁路新建、改建的电力牵引供电工程施工。

Technical Guidelines for Electric Traction and Power Supply Engineering of Passenger and Freight Collinear Railway

ICS
CCS
P65
发布
2008-03-21
实施
2008-03-21

This leaflet relates to earthworks and track beds for ballasted track. The study of railway track substructure can be considered as two separate subjects: the design of track bed layers and earthworks for new lines; maintenance of the track bed layers and earthworks on existing lines, which show signs of ageing or are exposed to a more severe loading regime (increase in gross tonnage, axle-load or speed). The technical design life considered in this leaflet for substructure is of 100 years. The leaflet is divided into 3 sections: - terminology and classification of soils and subgrades, - construction of earthworks and track bed layers for new lines, - maintenance of earthworks and track bed layers on existing lines.

Earthworks and track bed for railway lines

ICS
CCS
P65
发布
2008-02
实施

本技术指南适用于铁路电力工程的施工。

Technical Guidelines for Railway Power Engineering Construction

ICS
CCS
P65
发布
2007-11-30
实施
2007-11-30

本技术指南适用于铁路GSM-R数字移动通信工程系统的施工。

Construction Technical Guidelines for Railway GSM-R Digital Mobile Communication Engineering

ICS
CCS
P65
发布
2007-11-22
实施
2007-11-22

本技术指南适用于设计速度等于或小于200 km/h的客货共线标准轨距铁路信号工程的施工。

Technical Guidelines for the Construction of Passenger and Freight Collinear Railway Signaling Works

ICS
CCS
P65
发布
2007-11-22
实施
2007-11-22

本技术指南适用于旅客列车设计行车速度200-350 km/h标准轨距客运专线无砟轨道铁路工程施工。其他无砟轨道铁路工程施工可参照执行。

Technical Guidelines for Ballastless Track Railway Engineering Construction of Passenger Dedicated Line

ICS
CCS
P65
发布
2007-07-04
实施
2007-07-04

本规范适用于新建、改建铁路工程设计。

Code for design of energy-saving of railway engineering

ICS
CCS
P65
发布
2007-03-03
实施
2007-03-03

本标准规定了城市轨道交通站台屏蔽门技术要求、试验和包装、运输与储存。 本标准适用于城市轨道交通站台屏蔽门设计、制作、检测、验收。

Urban railway transportation platform screen door system

ICS
93.100
CCS
P65
发布
2006-11-29
实施
2007-03-01

Railway applications - Track - Acceptance of works - Part 2: works on ballasted track - Switches and crossings

ICS
93.100
CCS
P65
发布
2006-08-01
实施
2006-08-20

Railway applications - Track - Acceptance of works - Part 1: works on ballasted tracks - Plain line

ICS
93.100
CCS
P65
发布
2006-08-01
实施
2006-08-20

This document lays down the technical requirements and the measurements to be made for the acceptance of work to re-profile both longitudinally and transversely the heads of railway rails, including the parts of switches and crossings that can be reprofiled. It also informs about procedures to verify reference instruments to be used for these measurements and informs about a method to approve non-reference instruments to be used for measurements.#,,#

Railway applications - Track - Acceptance of works - Part 3: Acceptance of rail grinding, milling and planing work in track; English version of DIN EN 13231-3:2006-08

ICS
93.100
CCS
P65
发布
2006-08
实施

This document specifies the requirements and tolerances for the acceptance of work associated with plain line on ballasted track for 1435 mm and wider gauge railways.

Railway applications - Track - Acceptance of works - Part 1: Works on ballasted track - Plain line; Enlish version of DIN EN 13231-1:2006-08

ICS
93.100
CCS
P65
发布
2006-08
实施

This document specifies the requirements and tolerances for the acceptance of work associated with switch and crossing layouts (also includes work on expansion devices) on ballasted track for 1435 mm and wider gauge railways.

Railway applications - Track - Acceptance of works - Part 2: Works on ballasted track - Switches and crossings; English version of DIN EN 13231-2:2006-08

ICS
93.100
CCS
P65
发布
2006-08
实施

本规范适用于铁路网中客货列车共线运行、旅客列车设计行车速度等于或小于200km/h、货物列车设计行车速度等于或小于120km/h的Ⅰ、Ⅱ级标准轨距铁路特殊路基的设计。

Code for design on special subgrade of railway

ICS
CCS
P65
发布
2006-06-25
实施
2006-06-25



Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号