P1248/D12-2019

Draft Guide for the Commissioning of Electrical Systems in Hydroelectric Power Plants


 

 

非常抱歉,我们暂时无法提供预览,您可以试试: 免费下载 P1248/D12-2019 前三页,或者稍后再访问。

如果您需要购买此标准的全文,请联系:

点击下载后,生成下载文件时间比较长,请耐心等待......

 

标准号
P1248/D12-2019
发布日期
2019年02月01日
实施日期
2019年05月13日
废止日期
中国标准分类号
/
国际标准分类号
/
发布单位
IEEE - The Institute of Electrical and Electronics Engineers@ Inc.
引用标准
152
适用范围
This Guide describes tests performed and provides processes to be followed during the commissioning of electrical and control systems in hydroelectric plants. Guidance for methods to be used@ organization and execution of the testing are provided. While the guide does not provide prescriptive procedures which are plant and equipment specific@ tests are described along with reference standards for more information. The commissioning of electrical equipment may be for a new hydroelectric plant installation; rehabilitation of an existing hydroelectric plant; or replacement and upgrade of existing electrical equipment.




Copyright ©2007-2022 ANTPEDIA, All Rights Reserved