C37.123-1996

Guide to Specifications for Gas- Insulated@ Electric Power Substation Equipment


 

 

非常抱歉,我们暂时无法提供预览,您可以试试: 免费下载 C37.123-1996 前三页,或者稍后再访问。

如果您需要购买此标准的全文,请联系:

点击下载后,生成下载文件时间比较长,请耐心等待......

 

标准号
C37.123-1996
发布日期
1996年09月19日
实施日期
2016年05月26日
废止日期
中国标准分类号
/
国际标准分类号
/
发布单位
IEEE - The Institute of Electrical and Electronics Engineers@ Inc.
引用标准
37
适用范围
This guide covers the technical requirements for the design@ fabrication@ testing@ installation@ and in-service performance of a gas-insulated substation (GIS). The supplier should furnish all equipment and material necessary to provide the complete GIS as shown on the functional one-line diagram@ which may consist of circuit breakers (CB)@ disconnect switches (DS)@ maintenance ground switches (MGS)@ fast-acting ground switches (FGS)@ voltage transformers (VT)@ current transformers (CT)@ SF6-to-air bushings@ SF6-to-cable termination@ buses@ cable termination enclosures@ transformer or reactor bushing enclosures@ enclosed surge arresters@ elbows@ bellows@ controls@ cables for control@ protection and metering@ density monitors@ platforms@ special tools@ and SF6 gas for initial filling. All equipment and material shall be prefabricated@ factory assembled@ tested@ and shipped in the largest practical assemblies. Assembled equipment should be capable of withstanding electrical@ mechanical@ and thermal ratings of the specified system. All joints and connections should be able to withstand the forces of expansion@ vibration@ contraction@ and specified seismic requirements without deformation@ malfunction@ or leakage. Equipment shall be capable of withstanding the specified outdoor or indoor environment. Optimized arrangements@ shown in annex A@ are required to reduce installation time@ provide ease of operation@ minimize maintenance and repair prices@ and facilitate future additions as described in the specifications. The user should identify space or area limitations for the GIS@ driveway access@ and any overhead clearance restrictions. Final arrangement shall be as mutually agreed to between the user and the supplier. Field assembly maintenance@ cost of operation@ and capitalized cost of maintenance during equipment life will be considered in bid evaluations. To elicit a complete and uniform response from each bidder@ proposal data is provided in clause 7.




Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号