Unit Production Cost Tracking Model UPCT 6 (Formerly TechAmerica EDIB1-B)


 

 

非常抱歉,我们暂时无法提供预览,您可以试试: 免费下载 EDIB1B-2015 前三页,或者稍后再访问。

如果您需要购买此标准的全文,请联系:

点击下载后,生成下载文件时间比较长,请耐心等待......

 

标准号
EDIB1B-2015
发布日期
2015年08月01日
实施日期
2016年06月02日
废止日期
中国标准分类号
/
国际标准分类号
/
发布单位
SAE - SAE International
引用标准
61
适用范围
INTRODUCTION This userguide contains a description of the Unit Production Cost Tracking Model for use in design tradeoffs and control andDesign-to-Cost program. This model is designed to compare two Cost Breakdwon Structures (CBS) to show elemental and summary cost differences. The two Cost Breakdwon Structures may represent design alternatives@ or a target allocation and the current design approach for comparison. Serveral features of the model make it especially useful for its purposes: o It makes a search to assure comparison of identical Cost Breakdown Structure (CBS) element identifiers. This assures comparison of comparable elements@ even if elements are added to or deleted from one alternative. o Analysis can be restricted to a subset of the CBS for a tradeoff not affecting other parts of the CBS. o Reporting level of detail can be limited for summary purposes. o Costs are separated by processes@ which may be identified as material and labor of various classes@or various accounts. Process sums are developed In addition to and within those of equipment elements. o Labor costs may be carried in terms of man-hours or other time elements@ and labor rates and burden rates assigned by process. Material costs may be burdened by assigned Material Handling Expense burden rates. o Learning factors may be assigned to processes to ease estimation of unit costs for various production quantities@ and for various elemental cost basis quantities. These computations are accurate over a broad range of intended production quantities. o The use of escalation or inflation factors enables reporting costs on any common time basis@ and allows combining elemental cost estimates developed at various points in the development cycle. Reports have been designed to be effective in the analytical@ control and reporting aspects of a DTC program. oo A Status Report limits the level of detail as desired@ for reporting status to management or the customer. It may be limited to a branch of the CBS for tradeoff purposes. An accompanying graph shows historical changes In DTC performance. oo A Problem Analysis Report is issued for corrective action when a design element or process exceeds its allocated goal. The Design-to-Cost process requires establishment of Design-to-Cost goals@ to which equipments are to be designed and their costs controlled. The designs must be reviewed periodically to evaluate their conformance with the established goals. The design process is controlled by goal allocation to designers and assistance in evaluation of their design alternativws. The mere existence of a cost goal lends incentive to designers to address the goal. When progress against the goal Is monitored and reported@ this incentive is increased. When the designer is required to explain a variance from the goal and his proposed solution@ his attention to cost is encouraged. Usual requirements on Defense Design-to-Cost contracts Include periodic reports of performance against a Unit-Production-Cost goal@ to three or more levels of Cost Breakdown Structure (CBS). These are used to satisfy Government directives for monitoring Design-to-Cost contracts




Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号