The procedures@ methods@ and documentation requirements in this guideline describe the application of the Commissioning Process for each project delivery phase from Predesign through Occupancy/Operations@ for all types and sizes of smoke control systems@ to support the Commissioning Process activities described in ASHRAE Guideline 0.1 This includes requirements for a. smoke control systems to fully support the Commissioning Process activities@ b. verification during each phase of the Commissioning Process@ c. acceptance during each phase@ d. documentation during each phase@ e. a systems manual@ and f. training for operations and maintenance (OM) personnel and occupants. The procedures@ methods@ and documentation requirements apply to new construction and ongoing Commissioning Process activities or requirements of all or portions of buildings and facilities. They also can be applied to rehab@ retrocommissioning@ or recommissioning projects. PURPOSE The purpose of this guideline is to describe the technical requirements for the application of the Commissioning Process described in ASHRAE Guideline 0@ The Commissioning Process@1 that will verify that the smoke control system achieves the Owner's Project Requirements (OPR).