A156.38-2014

LOW ENERGY POWER OPERATED SLIDING AND FOLDING DOORS


说明:

  • 此图仅显示与当前标准最近的5级引用;
  • 鼠标放置在图上可以看到标题编号;
  • 此图可以通过鼠标滚轮放大或者缩小;
  • 表示标准的节点,可以拖动;
  • 绿色表示标准:A156.38-2014 , 绿色、红色表示本平台存在此标准,您可以下载或者购买,灰色表示平台不存在此标准;
  • 箭头终点方向的标准引用了起点方向的标准。

 

 

非常抱歉,我们暂时无法提供预览,您可以试试: 免费下载 A156.38-2014 前三页,或者稍后再访问。

点击下载后,生成下载文件时间比较长,请耐心等待......

 



标准号
A156.38-2014
发布日期
2014年01月01日
实施日期
2014年11月28日
废止日期
中国标准分类号
/
国际标准分类号
/
发布单位
BHMA - Builders Hardware Manufacturers Association Inc.
引用标准
10
适用范围
Requirements in this Standard apply to low energy power operated sliding and folding door systems for pedestrian use@ and some small vehicular use. The activation of all doors described in this standard requires a knowing act. Included are provisions intended to reduce the chance of user injury or entrapment. Doors that require higher speeds@ forces@ shorter time delays@ and activating sensing devices shall comply with ANSI/BHMA A156.10 for Power Operated Pedestrian Doors and are not covered in A156.38. This Standard does not attempt to assess any factors that exist with respect to custom design installations which are not required to meet the requirements of this Standard. Unless otherwise specified@ all references to time delay@ opening speed and forces in this standard@ refer to the operator in the power mode as opposed to the manual mode. Required dimensions are expressed in US units first and the SI (metric) equivalents given in parentheses are approximate. All values which do not carry specific tolerances or are not marked maximum or minimum shall have the following tolerances: Linear dimensions shall be ?? 1/16 in (1.6 mm). Pounds or pound force shall be ?? 5%. Angular measurements shall be ?? 4 degrees. Voltage measurements shall be ?? 5 percent. Temperature measurements shall be ?? 4 degrees F (?? 2 degrees C). Compliance with the requirements of this standard shall be accomplished through factory settings or field adjustments as necessary. Operators used on labeled fire door assemblies shall be listed or labeled by a nationally recognized independent testing laboratory@ and be subject to a periodic in-plant follow-up service. Consult the authority having jurisdiction for the appropriate fire test requirements. Refer to applicable building codes for means of egress clear width requirements@ and knowing act device locations.




Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号