ETS 300 417-1-2-1996

Transmission and Multiplexing (TM); Generic Functional Requirements for Synchronous Digital Hierarchy (SDH) Equipment; Part 1-2: General Information About Implementation Conformance Statement (ICS) Proforma


 

 

非常抱歉,我们暂时无法提供预览,您可以试试: 免费下载 ETS 300 417-1-2-1996 前三页,或者稍后再访问。

如果您需要购买此标准的全文,请联系:

点击下载后,生成下载文件时间比较长,请耐心等待......

 

标准号
ETS 300 417-1-2-1996
发布日期
1996年01月01日
实施日期
2014年04月07日
废止日期
中国标准分类号
/
国际标准分类号
/
发布单位
ETSI - European Telecommunications Standards Institute
引用标准
18
适用范围
This European Telecommunication Standard (ETS) provides general information about the Implementation Conformance Statement (ICS) proforma structure and contents@ as well as guidance for filling-in the document. The ICS proforma for a Synchronous Digital Hierarchy (SDH) Network Element (NE) are defined in compliance with the relevant requirements@ and in accordance with the relevant guidance@ given in ISO/IEC 9646-7 [4]@ in ETS 300 406 [5] and in ETR 212 (see annex C). The ICS proforma is a normative part of the reference specification. The supplier of an implementation which is claimed to conform to ETS 300 417-1-1 [6] is required to complete a copy of these ICS proforma@ namely this ETS@ and is further required to provide all information necessary to identify both the implementation (e.g. specify it by means of a detailed system description) and the supplier. The client of the test laboratory might be identified by means of the System Conformance Statement (SCS) and a client checklist. Those proforma are included in annex B of this ETS. The use of SCS proforma and client checklist is not mandatory@ any suitable means of providing such information is acceptable. According to ETS 300 406 [5] the ICS proforma has two main objectives: - within the context of conformance testing@ to be the reference document for the conformance assessment process related to the Implementation Under Test (IUT); - outside the context of conformance testing@ to provide an overview of the implementation. Concerning the conformance assessment process@ the ICS proforma is used: - as the description of the IUT for the static conformance review; - as an element of description of the IUT capabilities for the test case deselection; - as an element of description of the IUT for the test suite parameterization; - as a reference document for the analysis of the results; - for inclusion with the final test report. Outside the conformance testing context@ the ICS proforma is or may be used: - to provide an overview of the capability supported by the implementation (see note); - to statically check the interworking capacities of two implementations; - as a standard checklist of the base specification conformance requirements. When requesting conformance/approval testing of an SDH layer implementation@ the supplier should always fill all the ICS proforma relevant for that layer. In the case where more than one instance of the same layer appears in the detailed system description@ the client of a test laboratory should clearly identify any differences existing between these instances (if any). NOTE: Each capability of the ICS associated implementation is described as a conformance statement which is the result of the answer@ by the supplier@ to the dedicated ICS item.




Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号