GUIDE TO PREPARING-1998

Guide To Preparing A Design Proposal For Paralleling Customer Generation With An Electric Utility


 

 

非常抱歉,我们暂时无法提供预览,您可以试试: 免费下载 GUIDE TO PREPARING-1998 前三页,或者稍后再访问。

如果您需要购买此标准的全文,请联系:

点击下载后,生成下载文件时间比较长,请耐心等待......

 

标准号
GUIDE TO PREPARING-1998
发布日期
1998年01月01日
实施日期
2009年10月28日
废止日期
中国标准分类号
/
国际标准分类号
/
发布单位
NEMA - National Electrical Manufacturers Association
适用范围
Introduction: A Summary of the Process The time Span between the initial decision for parallel operation and the final installation and operation acceptance can be several years. This time is spent in: 1. Communication with the user (client) 2. Communication with the utility company 3. Preliminary design@ including drawings 4. Prepare the utility proposal 5. Preliminary approval by utility 6. Final design and drawing by system designer 7. Bidding@ purchasing@ choice of supplier 8. System design approved by utility 9. Manufacturing lead times 10. Installation 11. Testing and start up 12. Operation Careful effort expended in the first two steps will save time and money during the following steps. Proper design and attentiveness to utility company requirements will make the remainder of the project go smoothly. It is the intent of this publication to provide guidance to the system planner to assure successful completion of the installation in a timely manner.

GUIDE TO PREPARING-1998相似标准





Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号