Guide for Conducting Corona Tests on Hardware for Overhead Transmission Lines and Substations


 

 

非常抱歉,我们暂时无法提供预览,您可以试试: 免费下载 1829-2017 前三页,或者稍后再访问。

如果您需要购买此标准的全文,请联系:

点击下载后,生成下载文件时间比较长,请耐心等待......

 

标准号
1829-2017
发布日期
2017年02月14日
实施日期
2017年04月04日
废止日期
中国标准分类号
/
国际标准分类号
/
发布单位
IEEE - The Institute of Electrical and Electronics Engineers@ Inc.
引用标准
32
适用范围
This guide establishes uniform procedures for the testing of transmission line and station bus hardware in high voltage laboratories. Two tests are described. The fi rst one is a corona performance test. The second is a radio interference voltage (RIV) test. The fi rst test uses visible techniques to determine the onset of positive corona. The second test is a measurement of the RIV voltage according to ANSI C63.2 or CISPR 16-1-1 and CISPR 18-2: 2010. This guide does not address the permissible radio interference (RI) limits or specifi ed corona extinction voltages. They are set either by regulation or by agreement between the end user and hardware manufacturer. Purpose The purpose of this guide is to establish uniform procedures for the testing of transmission line and station bus hardware in high voltage laboratories. A uniform procedure is a prerequisite to assure such hardware is either free from visible corona or does not add any appreciable RI to that already being generated by the transmission line or substation conductors.




Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号