LO-09-006-2009

A Design Tool for Hybrid Geothermal Heat Pump Systems in Cooling-Dominated Buildings


 

 

非常抱歉,我们暂时无法提供预览,您可以试试: 免费下载 LO-09-006-2009 前三页,或者稍后再访问。

如果您需要购买此标准的全文,请联系:

点击下载后,生成下载文件时间比较长,请耐心等待......

 

标准号
LO-09-006-2009
发布日期
2009年01月01日
实施日期
2010年02月18日
废止日期
中国标准分类号
/
国际标准分类号
/
发布单位
ASHRAE - American Society of Heating@ Refrigerating and Air-Conditioning Engineers@ Inc.
引用标准
14
适用范围
ABSTRACT A practical method for designing hybrid geothermal heat pump (GHP) systems that use closed-loop@ earth heat exchangers installed in vertical boreholes is presented. The design difficulty with hybrid GHP systems is inherently an optimization problem that is best solved with a computer-based system simulation method. Many parameters can be optimized and there is no unique expression of the objective function. In this work the optimization problem is defined as balancing the annual thermal loads on the ground by minimizing the borehole heat exchanger length and appropriately sizing supplemental equipment. The supplemental equipment examined in this work has been limited to direct-contact evaporative cooling towers. The design method for GHP systems was developed from results of 91 detailed computer simulations. Three dimensionless groups containing key GHP design parameters were identified using the Buckingham Pi Theorem@ and correlated with a fitted surface equation. With typical design parameters available to a practitioner@ the design method developed here can be used to estimate the total ground loop length for stand-alone GHP systems@ along with the quantity of annual energy required to balance the annual ground loads. With additional input parameters also readily available to designers@ the capacity of a cooling tower can be calculated@ along with the corresponding reduced borehole heat exchanger length. Cooling tower capacity is calculated using an annual equivalent full load hour concept.




Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号